Loading...
TexasBank-CS030403DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: TexasBank Addition, Site Plan to allow the construction of a one - story, 6,700 square -foot bank facility with a 2,000 square -foot drive - through on 1.74 acres of property located at the northeast corner of Vanbebber and S. Denton Tap Road, at the request of Todd Blackwell, Dunaway Associates, Inc. Project ID # SPA -03 -0039 STAFF REP Marcie Diamond DRC DATE: March 27, 2003 and April 3, 2003 CONTACT. Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: r r 1. The brick paver or stamped concrete bands should be constructed 1 -foot behind the property line. The sidewalk ADA ramps should align with the paver bands. Additional sidewalk easements may need to be granted. 2. A letter from the property owner to the north will be required granting permission to construct the mutual access /firelane. 3. Additional comments are likely when a more detailed utility plan is provided for review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM. TexasBank Addition, Lots 1 and 2, Block A, Minor Plat to allow the construction of a one - story, 6,700 square -foot bank facility with a 2,000 square -foot drive - through on Lot 1, containing 1.74 acres, and reserving Lot 2, containing 3.61 acres, for future development on property located at the northeast corner of Vanbebber and S. Denton Tap Road, at the request of Todd Blackwell, Dunaway Associates, Inc. Project ID # MP -03 -0040 STAFF REP Marcie Diamond DRC DATE: March 27, 2003 and April 3, 2003 CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: ✓ M FINAL REVM AFTER P&Z No Comments.