Loading...
PA9702-LR 990830 (2)'cONCRETE COMPRE r')IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 DallaS, Texas 75247 )ateofService: 07/30/1999 Report No.: 9920684 Report Date 08/30/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~eiid 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson PLACEMENT DATE: 07/30/1999 BATCHT]~4E: 3:52am PLANT: 2 TrME SAMPLED: 4:25am BY: Jack Fan-is SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMeERATURE (F) - AIR 79 F CONCRETE: 90 F SLtqV~: 4-6" TRUCK NO: 211 TICKET NO: N/A AIR: N/A AIR COr~'~NT (%): N/A UNrr WEIGHT (pet): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Slab-on-grade gym building ASTM C-172 ASTM C-39 (see attached sketch) SAMPLE LOCATION: See below REPORT OF TESTS Acctr vE VA S: 40 CYLINDER MEASURED MAXIliUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (p~i) TYPE 1 1 5.50 08/06/1999 7 121750 4310 1 2 5.50 08/06/1999 7 115320 4080 Average 4200 1 3 5.50 08/27/1999 28 128990 4560 I 4 5.50 08/27/1999 28 132000 4670 Average 4620 Sample location: From northwest corner 2 feet south and 3 feet east Concrete placed by pumpl sampled at point of discharge. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. ONCRETE COMPRE4 IVE STRENGTH TES' 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 ~ate of Service: 07/30/1999 Report No.: 9920684 Report Date 08/30/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: CoppellAquatic/RecreationCtr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samp~es ~f fresh c~ncrete at the p~acement ~ocati~ns~ perf~rm required ~e~d test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson PLACEMENT DATE: 07/30/1999 BATCH TIME: 5:10am PLANT: 2 TIME SAMPLED: 6:00am BY: Jack Farris SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Partly cloudy STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F)- AIR 80 F CONCRETE: 90 F SLUMP: 4-6" TRUCK NO: 221 TICKET NO: N/A AIR: N/A AIRCONTENT(%): N/A UNITWEIGHT(pOD: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 130 CYLINDER MEASURED MAXIMUM COMPRF~SIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 2 1 4.75 08/06/1999 7 132400 4680 2 2 4.75 08/06/1999 7 127580 45 10 Average 4600 2 3 4.75 08/27/1999 28 142110 5030 2 4 4.75 08/27/i999 28 145820 5160 Average 5100 Sample location: Form southeast corner 4 feet north and 5 feet west Sampled at point of discharge. Technician: Jack Farris Started: 3:00am Finished: 6:30am ~ ~ritlg, Inc. Report Distribution: ( I ) City of Coppell ( 1 ) City of Coppell - Engineering (l) BrinkIcy SargemArchitecs (i) CityofCoppell - Bldg. lnsp. 4y-Eugene Hatbout (1) Turner Engineers (1) City of Coppell - Leisure Scrv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the writtcn approval of HBC Engineering, Inc.