Loading...
Gateway BP(1.4)-CS030220APPLICANT: Page 1 of 5 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: Gateway Business Park, Lot 1R, Block 2, Site Plan Amendment (Haverty's Furniture) P Z HEARING DATE: February 20, 2003 C.C. HEARING DATE: March 11, 2003 STAFF REP.: Gary L. Sieb, Planning Director LOCATION: 770 Gateway Boulevard. SIZE OF AREA: 31.402 acres of property. CURRENT ZONING: LI (Light Industrial) REQUEST: Site Plan Amendment to allow a 245,277 square foot warehouse addition to the existing retail/office/warehouse and to increase parking for the facility by 124 spaces. Rawson Haverty, Jr. Haverty Furniture Co. 780 Johnson Ferry Rd., Suite 800 Atlanta, GA. 30342 (404) 443 -4317 FAX (404) 443 -4176 Architect: MacGregor Associates Architects 2675 Paces Ferry Rd., Suite 210 Atlanta, GA. 30339 (770) 432 -9400 FAX (770) 432 -9934 Item #13 HISTORY: SURROUNDING LAND USE ZONING: Page 2 of 5 City Council approved the final plat of Gateway Business Park on June 12, 1990. On October 12, 1993, Council approved a replat of Block 2. On April 9, 1996, Council approved a second replat with site plan for the subject site, allowing a 214,000 square foot regional distribution warehouse and a 50,000 square foot retail furniture showroom. Both have subsequently been constructed. In December of 2000, Council approved a 170,590 square foot addition to the existing warehouse, and in December of 2002, granted an 18 month extension to the expiration date of that 2000 addition. TRANSPORTATION: Gateway Boulevard is a C4U, four -lane undivided collector street built to standard within a 70 foot right of way. North Railroad (D.A.R.T. right of way), United States Postal Facility; LI, Light Industrial South I.H. 635, warehouse/office space; LI, Light Industrial East Vacant; LI, Light Industrial West Park `N Fly parking lot; LI, Light Industrial COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial and showroom uses. DISCUSSION: This is an application to expand an existing warehouse use in our industrial district. In 2000 Council granted a 170,590 square foot addition to the existing warehouse. That addition was not constructed, but in December of 2002, Council granted an 18 month extension to that approval. The applicant has re- evaluated its needs and requests— through this application approval of a different site plan expansion. Specifically, Haverty's Furniture proposes to increase the size of its facility by 245,000 square feet. In addition, they wish to add 124 new parking spaces to accommodate the expansion. SI 1'E PLAN (Drawing A -1) The site plan submitted with this request depicts a three -phase development. Phase I is already on the ground, and consists of a 214,000 square foot warehouse, a 50,000 square foot showroom, and 356 parking spaces; Phase II is being considered by this request, and includes a warehouse expansion of 245,000 square feet, and an additional 124 parking spaces. Phase III lays out possible future warehouse expansion of 200,000 square feet. We are only considering the relationship of Phase I and Phase II development here. Item #13 Page 3 of 5 Because the Board of Adjustment granted a parking exception (see below) in 1996 which covered Phase I and Phase II of this development and parking seems to be more than adequate, we will not require parking beyond that shown on this plan. The remainder of the site plan conforms to the overall conceptual expansion submitted at time of initial development. Exchange Circle is built and provides access to the interior of the site as well as a second point of warehouse ingress/egress. The buildings here have been constructed in conformance with the guidelines discussed during the initial development process. There are minor adjustments needed to the site plan. A note designating total parking spaces for each parking area is needed; the easement information needs to be eliminated from this drawing as it is more relevant (and is shown) on the minor plat. ELEVATIONS (Drawing A -2) The elevations generally conform to the site plan submittal. Minor additions include noting the height of the existing and proposed buildings. The North Elevation Addition "existing and proposed warehouse expansion" note needs to be reversed. The Guardhouse Elevations need height, width, and length added to the drawing. In addition, a note needs to be added stating that the color of the building matches the warehouse color scheme. The concrete masonry unit (CMU) is not defined as a masonry construction material in Coppell and will have to be changed. Most recently Staples had a similar situation occur and elected to construct their security station from the same material as the warehouse itself. That same solution would work here. PARKING (Board of Adjustment. action) Parking requirements for the existing office/showroom (50,000 square feet) and warehouse (214,000 square feet) totals 464 spaces. A count of on -site parking spaces reflects 356 spaces on the site today. When one includes the proposed 245,000 square foot warehouse expansion, required parking spaces would total 709. Looking to the future expansion of an additional 199,000 square feet in Phase II, the Code required parking count increases to 908 parking spaces. This discrepancy between required and provided parking was resolved in a Board of Adjustment action which granted Haverty's a special exception from the normally required parking counts. In April of 1996, the Board granted a reduction of 229 parking spaces from a required 671. Further, the Board stated that all 442 spaces did not have to be provided until an expansion of the warehouse occurred. That action was based on a plan somewhat different from the one before you now. Reviewing the current case, the existing 356 spaces will be increased to 480 if the requested warehouse expansion is allowed. However, by code requirement adding the 245,000 square foot warehouse addition would necessitate a total of 709 parking spaces. To repeat, if all things were equal and the Board had granted no parking reduction, the plan before you would require 709 parking spaces. Item #13 RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends approval of the Haverty's expansion subject to the following conditions: Item #13 Page 4 of 5 However, because the Board granted a parking exception and reduced the required number of spaces by 229, at conclusion of Phase II building, 480 spaces will be required. The site plan reflects that number of parking spaces. As a point of information, adding the Phase 11I proposal (which is NOT being considered with this request) would result in an additional 199,000 square foot building and 199 more required parking spaces. Because the Board granted an exception to the first two phases of development, one could assume the applicant would go to the Board again for additional parking relief. To summarize, with this lot fully developed 908 parking spaces would be Code compliant, but because the Board granted a special exception, the number of spaces shown on this Plan (for Phase II development) –the 480 parking spaces—will be adequate for this development. When Phase III expansion occurs, an additional look at parking requirements will be necessary. LANDSCAPING (Drawing L 1.01) The landscaping plan needs work. The submittal shows some existing plant material being transplanted to other locations as the warehouse expansion takes over that space. The Zoning Ordinance states that all plant material must be kept in a healthy and growing .condition, and if the transplanted materials die, replacement is required. It would be prudent to add that note to the landscape plan. The east property line needs to be clearly shown and the weight of that line increased to match the remainder of the boundary lines. Because the majority of the north side of the property will be screened by buildings from the public r.o.w., staff would support the request to eliminate the landscape screening adjacent to the railroad, just as we did with the Phase I development. A note on the Plan so states. In addition, the proposed six foot chain Link fence shown on the site plan needs to be shown on the landscape plan, too. A final comment addresses the calculations for providing the required landscaping on this site. Although requested in the Development Review Committee meeting, the applicant has not fully complied with Section 12 -34 of the Zoning Ordinance. Specifically, 12 -34 -9 has not been properly addressed. A rough estimate would suggest approximately 129,000 square feet of non vehicular open space is required for this intensity of development. We have not been provided with calculations reflecting the amount of landscaping being provided in that category. This request needs to comply with the non vehicular landscaping requirements of the Zoning Ordinance. ATTACHMENTS: 1) Site Plan 2) Landscape Plan 3) Elevations 1. Note total number of parking spaces for each parking area shown on site plan. 2. Remove easement information from site plan. 3. Show height of existing and proposed buildings. 4. Elevation note stating "existing and proposed warehouse expansion" needs to be reversed. 5. Guardhouse elevations need height, width and length information added. 6. Add note that guardhouse color will match existing warehouse color scheme. 7. Address the guardhouse CMU issue. 8. Add note to landscape plan that states all plant material will be maintained in a healthy and growing condition. 9. Identify and increase weight of east property line to match remainder of boundary lines. 10. Show six foot chain Link fence on landscape plan. 11. Comply with Section 12 -34 -9 of the Comprehensive Zoning Ordinance. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date Page 5 of 5 Item #13 P Z HEARING DATE: C.C. HEARING DATE: REQUEST: APPLICANT: Page 1 of 2 CITY OF COPPELL PLANNING DEPARTMENT February 20, 2003 March 11, 2003 STAFF REPORT CASE: Gateway Business Park, Lots 1R and 3A, Block 2, Replat (Haverty's Furniture) STAFF REP.: Gary L. Sieb, Planning Director LOCATION: 770 Gateway Boulevard. SIZE OF AREA: 43.259 acres of property. CURRENT ZONING: LI (Light Industrial) Replat to allow a 245,277 square foot addition to the existing retail/office /warehouse and to increase parking for the facility by 124 spaces. Mr. Rawson Haverty, Jr. Haverty Furniture Co. 780 Johnson Ferry Rd., Suite 800 Atlanta, GA. 30342 (404) 443 -4317 FAX (404) 443 -4176 Engineer: Halff Associates 8616 NW Plaza Drive Dallas, TX. 75225 (214) 346-6324 FAX (214) 361 -5573 Item 14 HISTORY: TRANSPORTATION: Gateway Boulevard is a C4U, four -lane undivided collector street built to standard within a 70 foot right of way. SURROUNDING LAND USE ZONING: ATTACHMENTS: Page 2 of 2 City Council approved the final plat of Gateway Business Park on June 12, 1990. On October 12, 1993, Council approved a replat of Block 2. On April 9, 1996, Council approved a second replat with site plan for the subject site, allowing a 214,000 square foot regional distribution warehouse and a 50,000 square foot retail furniture showroom, both now existing on the site. In December of 2000, Council approved a 170,590 square foot addition to the existing warehouse, and in December of 2002, granted an 18 month extension to the expiration date of that 2000 addition. North Railroad (D.A.R.T. right of way), United State Postal Facility; LI, Light Industrial South 1.1-1.635, warehouse /office space; LI, Light Industrial East Vacant; LI, Light Industrial West Park `N Fly parking lot; LI, Light Industrial COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for light industrial and showroom uses. DISCUSSION: The hearing immediately preceding this request necessitates a replat of the property to accommodate the expansion outlined on the site plan. In that all appropriate departments have reviewed this replat, and no substantial corrections are needed at this time, this replat can be approved with the conditions listed under our staff recommendation. RECOMMENDATIONTO THE PLANNING AND ZONING COMMISSION: Staff reconunends approval of this replat with the following condition: dimension the width of the fire lane that extends south to Gateway Blvd., east of the westem fire lane. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 1) Replat Document Item 14