Loading...
Freeport NIP(7.0)-LR030409R neEng 8908 Ambassador Row Dallas, Texas 7524'/=4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION CHent: Duke Realty Services, LP At~m: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Water Injection Inspection Report No.: 174178 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/09/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: ( l ) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pachoco Koch Consulting Engineers 9:00 a.m. - 4:30 p.m. (1} Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, em.) or any other ~ature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shell not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Patte 1 of 1 WATER INJECTION OBSERVATION Client: Project: Duke Realty Services, LP 174178 ,Report No.: Project No.: Date of Service: Page 2 of 3 *, DESCRIPTION/EXPLANATION YES NO NIA 1. Specific ~ravity of lime was checked and found to be 1.14 and 1.17 X 2. Lime slur~ was continuously a~litated x 3. Surfactant was added to each load X ~,. The iniection pressure was kept between 50 to 100 psi at point of injection x 15. Intervals of 12" were achieved durin~ iniection process until refusal x 16. Total depth of iniection -- 10 feet X 7. Max. spacin~ of iniection probes was recorded to be 5 ff. X 18. Free lime on surface X 9. Square feet injected on this date 41,592 ;10. Location of injection Buildin~ pad 6-F 037333 Freeport 10 4/3/2003 500 Freeport Parkway Coppell, TX Remarks: completed 3rd pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 9:00 a.m. - 4:30 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exc~usive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. · ! gineers 8908 Ambassador Row Dallns, Texas '/5247-4510 (214) 630-9745 (:214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Duke Realty Services, LP Report No.: Arm: Mr. JeffLa~ston Project No.: 5495 Belt Line Road, Suite 360 Date of Service: Pr°jeet:~~kwayDallas TX 75254 i~ / ~ Report Date: q , Coppell, TX Services: Perform In-Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Test Methods: Duke Realty Services, LP ASTM D-2922 Gauge: Troxler 3430 Moisture ASTM D-3017 Gauge Serial No: 32720 Current: 665 Teat Mode: DT Previous: 660 Description MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf M/D No. Dark Brown Clay (lime treated) 174088 037333 04/02/2003 04/09/2003 Standard Counts Density Current: 3053 Previous: 3072 Project Requirements Moisture Density 20.0 101.0 Optimum + 95-100 rain FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (poi) (peO (% max) Lime Subgrade 1 Building pad, 450' east x 100' north of southwest comer, final Lime Subgrade 2 Building pad, 450' east x 200' north of southwest comer, final Lime Subgrade 3 Building pad, 450' east x 300' north of southwest comer, final Lime Subgrade 4 Building pad, 450' east x 400' north of southwest comer, final Lime Subgrade 5 Building pad, 500' east x 400' north of southwest comer, final 6" 1 21.9 118.2 97.0 96 6" 1 20.3 117.4 97.6 97 6" 1 20.7 121.7 100.8 100 6" 1 22.3 122.1 99.8 99 6" 1 21.7 117.0 96.1 95 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the vaitten approval of Rone Engineers, Ltd. 07DD Page I of 2 Report No.: 174088 Project No.: 037333 Client: Duke Real~y Services, LP RoneEngln~rs NO TEST LOCATION PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pcf) (PcO (% max) Lime Subgrade 6 Building pad, 500' east x 300' north of southwest comer, final Lime Subgrade 7 Building pad, 500' east x 200' north of southwest comer, final Lime Subgrade 8 Building pad, 500' east x 100' north of southwest comer, final 6" 1 20.0 119.2 99.3 98 6" 1 23.1 121.1 98.4 97 6" 1 22.4 122.4 100.0 99 Test results on this report meet project specification. See report #174150 for technician time Technician: Lanny Gist Report Distribution: (1) Duke R~lty Services, LP (1) Duke Reslty Services, LP (1) City of Coppell Engineering Dept. (1} Pacheco Koch Consulting Engineers Started: Finished: (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be ~'produced except in full without the written appwval of R. one Engineers, Ltd. 07DD Page 2 of 2 RoneEn Client: Duke Realty Services, LP Aria: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport I0 .5.00 Freeport Parkway Coppell, TX Services: Cylinder Collection 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) REPORT OF CYLINDER COLLECTION Report No.: 174327 Project No.: 037333 Date of Service: 04/05/2003 Report Date: 04/09/2003 Report of Collection On this date, a Rone Engineers, Ltd. representative arrived on site as scheduled to pick up compressive strength test specimen cast prior to this date. Technician Time: 8:45 a.m. - 10:00 a.m. Page 1 of 1 Technician: Ryan Herbrand Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Semites, LP (1) City of Coppcll Englnceting Dept. (1) Pucheon Koch Consulting Engineers (1) Enginersln~ Analyst ( l ) City of Coppen EaNacermg Depc I -K Scott Watson - CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composilion, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conU-o]. Our letters and reports am for the exclusive use of the client~ to whom they are addressed and shall not be reproduced except in full without the written approval ofRone Engincem, Ltd. 99DD PaRe I of 1 Client: Duke Realty Services, LP Atto: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport I0 ~0.0 Freeport Parkway Coppell, TX Services: Daily Activities 8908 Ambassador Row Dallas, Texas 75247=4510 (214) 630-9745 (214) 630-9819 (f~x) REPORT OF DAILY ACTIVITIES Report No.: 174455 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/09/2003 Report of Activities On this date, a Rone Engineers, Ltd. representative(s) was on site to assist primary Rone Engineers field representative with the inspection of drilled Diers and sampling/testing of concrete. See drilled pier inspection report #174180 and concrete compressive strength 'report #174181 for additional information. Technician Time: Page 1 of 1 Technician: Gary Kamrath Report Distribution: (I) Duke Realty Sendces, LP (1) Duke Realty Services, LP (1) City of CoppeH Engineering Dept. (1) Pacheco Koch Consulting Engineers 7:30 a.m. - 1:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMrrATIONS: The test results presented herein were prepared based upon the specific samples pwvided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letla~ and reports am for the exclusive use of the cl/ents to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD PaRe 1 of 1 8908 Andmssadnr Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 6~o-9s19 (tax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Service% LP Arm: Mr. JeffLan~ston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 174009 Project No.: 037333 Date of Service: 04/01/2003 Report Date: 04/09/2003 Project: Freeport 10 500 Freepox~ Parkxvay Coppell, TX Services: Water Injection Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheeo Koch Consulting Engineers 9:00 a.m. - 5:00 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the speeific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any othe~ feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and repom are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Paoe I of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 174009 Project No.: 037333 Project: Freeport 10 Date of Service: 4/1/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX '* ' ' DESCRIPTION/EXPLANATION YES NO NIA 1. Specific ~lravity of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurr)/was continuously a~litated X 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of iniection X 5. Intervals of 12' were achieved durin~l iniection process until refusal X 6. Total depth of injection - 10 feet X 7. Max. spacinc, I of iniection probes was recorded to be 5 ft. X 8. Free lime on surface X 9. Square feet iniected on this date 129,992 10. Location of iniection Buildin~l pad 6-F & 4D Remarks: Reinjecting areas of 4D, 7th pass applied continued 2nd and 3rd pass at area 6F See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 9:00 a.m. - 5:00 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no resp(mslblllty for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineers, Inc. RoneEng Client: Project: Services: Duke Realty Services, LP At-m: Mr. Jeff Langston 5495 Belt Linc Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. 8908 Ambassador Row Dnlins, Texas 75247-4510 (214) 630=9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Report No.: 174010 Project No.: 037333 Date of S~rvice: 04/01/2003 Report Date: 04/09/2003 PROJECT DATA CONTRACTOR: Test Methods: M/D No. Duke Realty Services, LP ASTM D-2922 ASTM D-3017 Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 660 Test Mode: DT Previous: 659 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Dark Brown Clay (lime treated) 20.0 101.0 Standard Counts Density Current: 3072 Previons: 3080 Project Requirements Moisture Density Optimum + 95-100 rain FIELD DENSITY TESTS NO TEST LOCATION Lime Subgrade 1 Building pad, 350' east southwest comer, final Lime Subgrade 2 Building pad, 350' east southwest comer, final Lime Subgrade 3 Building pad, 350' east southwest comer, final Lime Subgrade 4 Building pad, 350' east southwest comer, final Lime Subgrade 5 Building pad, 375' east southwest comer, final PROBE DEPTH bl]D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pc0 (% mx) x 100' north of the 6" 1 20.6 116.5 96.6 96 x 200' north of the 6" 1 22.4 123.4 100.8 100 x 300' north of the 6" 1 24.0 120.5 97.2 96 x 400' north of the 6" 1 23.1 121.0 98.3 97 x 500' north of the 6" 1 21.2 118.7 97.9 97 LIMITATIONS: The test results presented herein were prepared based upon the specific ~ample~ provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by p~sons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 97DD Page 1 of 2 Report No.: 174010 Project No.: 037333 Client: Duke Realty Services, LP RoneEnginee~ TEST NO TEST LOCATION PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pcf) (pc0 (% nmx) Lime Subgrade 6 Building pad, 375' east x 400' north of the 6" 1 22.5 120.7 98.5 98 southwest comer, final Lime Subgrade 7 Building pad, 375' east x 300' north of the 6" 1 24.6 119.9 96.2 95 southwest comer, final Lime Subgrade 8 Building pad, 375' east x 200' north of the 6" 1 21.1 120.4 99.4 98 southwest comer, final -- Test results on this report meet project specffication. Technician: LannyGist Started: 6:30am Finished: 9:00am /~~R°~~e~*~ Report Distribution: (1) Dukc Realty Services, LP (1) Enginearing Analysrt (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) City of Coppell Engineering Dept. (1) Panheco Koch Consulting Engineers K. Scott Watson CMT Operations Manager LNvlITATIONS: The test results presentedhcreinwereprepered based upon the specific samples provided for testing. We assumeno responsibility forvaria~iou in quality (composition, appearance,.performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and reports are for the exclusive use of the cliants to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2 S908 Ambassador Row ~ Texas 7S247=4510 (214) 630=9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING CHent: Project: Services: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Pen-t'orm In-Place Density Test in accordance with ASTM Standards. Report No.: 174179 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/09/2003 CONTRACTOR: Test Methods: No. Duke Realty Services, LP ASTM D-2922 ASTM D-3017 PROJECT DATA Standard Counts Density Current: 3077 Previous: 3053 Description Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 656 Test Mode: DT Previous: 655 MOISTURE DENSITY RELATIONS Maximum Project Requirements Moisture % Denflty pcf Moisture Density Dark Brown Clay (lime treated) 20.0 101.0 Optimum + 95-100 FIELD DENSITY TESTS TEST NO TEST LOCATION Lime Subgrade 1 Building pad, 650' east x 100' north of southwest comer, final Lime Subgrade 2 Building pad, 650' east x 200' north of southwest comer, final Lime Subgrade 3 Building pad, 650' east x 300' north of southwest comer, final Lime Subgrade 4 Building pad, 650' east x 400' north of southwest comer, final Lime Subgrade 5 Building pad, 700' east x 500' north of southwest comer, final PROBE DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (.mO ~c0 (%max) 6" 1 20.0 117.4 97.8 97 6" 1 22.1 119.0 97.5 97 6" 1 22.9 124.0 100.9 100 6" 1 20.2 117.7 97.9 97 6" I 23.8 124.2 100.3 99 LIMrrATIONS: The test results presented here/n were prepared based upon the specific samples prey/deal for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conwol. Our letters and repons are for the exclusive use of the clients to whom they are addreesed and shall not be reproduced except in full w/thout the wr/t'~l approval of Rone Eng/neers, Ltd. 07DD Page 1 of 2 Report No.: 174179 Project No.: 037333 Client: Duke Realty Services, LP ROneEngineers TEST NO TEST LOCATION PROBE DEPTH bt/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcO ~cO (%max) Lime Subgrade 6 Building pad, 700' east x 400' north of 6" 1 23.4 121.3 98.3 97 southwest comer, final Lime Subgrade 7 Building pad, 700' east x 300' north of 6" 1 22.8 120.3 98.0 97 southwest comer, final Lime Subgrade 8 Building pad, 700' east x 200' north of 6" 1 20.9 117.5 97.2 96 southwest comer, final Technician: Lanny Gist Started: 6:30am Finished: 9:00am Ro Report Distribution: (1) Duke Realty Se~ces, LP (1) Engineering Analyst (1) Duke Realty Services, LP (I) City of Coppell Engineering Dept. (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers K. Scott Watson CMT Operations Man~er LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for tearing. We assume no responsibility for variation in quality (composition, appearancc,.performance, e.tc.) or any other feature of similar subject rnattur provided by persons or conditions over which we have no consol. Our letters and repons are for thc exclnslve use of the chents to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2 Client: 8908 Ambassador Row Darius, Texas 752474510 (214) 63O-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Duke Realty Services, LP Arm: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C6ppell, TX Services: Water Injection Inspection Report No.: 174087 Project No.: 037333 Date of Service: 04/02/2003 Report Date: 04/09/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheeo Koch Consulting Engineers 10:00 a.m. - 4:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. CMT 0 gcott Watson )erafions Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: Project No.: Project: Freeport 10 Date of Service: 4/2/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX " DESCRIPTION/EXPLANATION YES NO N/A 1. Specific ~ravit7 of lime was checked and found to be 1.14 and 1.17 X 2. Lime slur~ was continuously ac, litated X 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of iniection X 5. Intervals of 12" were achieved durin~ iniection process until refusal X B. Total depth of iniection -- 10 feet X 7. Max. spacin~l of iniection probes was recorded to be 5 ff. X ~. Free lime on surface X ;). Square feet iniected on this date 130,000 10. Location of iniection Buildin~l pad 6-F & 4D 174087 037333 Remarks: completed 8th pass at 4-D reinjection, began 3rd pass at 6-F See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 10:00 a.m.- 4:30 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no dontrol. Our lettem and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the va'itten approval of Rone Engineers, Inc, I ineers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630=9745 (214) 630-9819 (fax} REPORT OF DAILY ACTIVITIES Client: Duke Realty Services, LP Arm: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport I0 500 Freeport Parkway Cbppell, TX Services: Daily Activities Report No.: 174182 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/09/2003 Report of Activities On this date, a Rone Engineers, Ltd. representative(s) was on site to assist primary Rone Engineers field representative with the inspection of drilled piers and sampling/testing of concrete. See drilled pier inspection report %174180 and concrete compressive strength report %174181 for additional information. Technician Time: 1:30 pim. - 5:15 p.m. Page 1 of 1 Technician: Arty Niekonov Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no eontzol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa.e I of I wlneers 8908 Ambassador Row Dallas, Texas 75247-4510 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 174150 Project No.: 037333 Date of Service: 04/02/2003 Report Date: 04/09/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Test Methods: ASTM D,2922 ASTM D-3017 M/D No. De~dpfion Gauge: Troxler 3430 Moisture Gauge Serial No: 32720 Current: 655 Test Mode: DT Previous: 660 MOISTURE DENSITY RELATIONS Maximum Moisture % Density pcf Tan Grayish Brown Clay w/Traces of Sand Standard Counts Density Current: 3053 Previous: 3072 Project Requirements Moisture Density 21.5 103.5 Optimum +4 95 mia FIELD DENSITY TESTS TEST No TEST LOCATION PROBE DEPTH MID MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 . (poi) (% max) Backf'dl 1 Storm lateral 5.2, Station 0+25, 2' below Backfill 2 Storm lateral 5.1, Station 0+25, 2' below Backfill 3 Storm lateral 5.0, Station 1+00, 2' below Backf'fll 4 Sanitary sewer, Line 3, Station 0+50, 3' below Backf'dl 5 Sanitary sewer, Line 3, Station 1+50, 2' below Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Real~y Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 6" 1 21.7 119.9 98.5 95 6" 1 22.0 121.1 99.3 96 6" 1 23.1 123.8 100.6 97 6" 1 22.3 123.5 101.0 98 6" 1 21.9 123.9 101.6 98 Test results on this report meet project specification. Finished: 10:00a Started: 6:30am (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 1 RoneEngineers $905 Ambassador Row Dallas, Texas 75247=4510 (214) 630-9745 (214) 630-9519 (fax) REPORT OF DRILLED PIER INSPECTION CHent: Duke Realty Services, LP Atm.~Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C~ppell, TX Services: Drilled Pier Inspection Report No.: 174180 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/09/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 5 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Engineering Dept. (1) Pacheco Koch Consulting Engineers 7:30 a.m. - 5:15 p.m. (1) Engineering Analyst (1) City of Coppoll Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results pmsanted herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other restate of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa-e 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174180 Project No.: 037333 Project: FreepoIt 10 Date of Service: 4/3/2003 500 Freeport Parkway Page 2 of 5 Driller: Liberty Pier Identification E.4-2.4 E.4-2.7 E.4-3 D.9-3 D.5-3 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 72 72 72 72 72 Required Minimum Depth (it) (Note 1) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (It) 11.20 10.50 11.50 11.70 11.50 Depth of Pier After Underreamin[~ (It)* 12.00 11.00 11.50 11.80 11.60 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Ca~in~ Diameter (in) / Casinl~ Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/g6 6/#6 6/86 6/#6 6/#6 Length of Reinforcing Steel (It) 10.0 8.5 10.0 10.0 10.0 Time Drilling was Completed (am / pm) 10:24 AM 11:09 AM 11:43 AM 11:36 AM 12:09 PM Time Concrete was Placed (am / pm) 11:20 AM 11:27 AM 12:30 PM 12:35 PM 12:41 PM Depth of Pier From Top of Concrete (ft) 10.80 9.70 10.40 10.50 10.30 Elevation: Surface (It)** 99.20 99.30 99.10 99.30 99.30 Elevation: Top of Pier (It)** 98.00 98.00 98.00 98.00 98.00 :Elevation: Bottom of Pier (It)** 87.20 88.30 87.60 87.50 87.70 Bearing Stratum (description) Tan Sandy Clay ~lote: See report #174181 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: Note 1: Minimum 12' pier depth or top of sand, whichever is first. ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. _IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vaflation in ~uality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which v~ have no control, ::)ur letters and reports are for the exclusive use of the clients to whom they ara addressed and shall not be reproduced except in full without the written approval of ;tone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174180 Project No.: 037333 Project: Freeport l0 Date of Service: 4/3/2003 500 Freeport Parkway Page 3 of 5 Driller: Liberty Pier Id .e/Ofification D.2-3 C.7-3 C.5-3 C-3 C-3.5 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 72 72 72 72 72 Required Minimum Depth (f~) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (f~) 11.90 11.80 11.70 11.40 11.40 Depth of Pier After Underreaminl~ (fi)* 12.40 12.40 11.90 11.70 11.40 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casin~ Lend, th (ft) NA NA NA NA NA Number of Bars / Reinforcin~ Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Len~h of Reinforcing Steel (f~) 10.5 10.5 9.5 I0.0 9.5 Time Drillin~ was Completed (am / pm) 1:13 PM 1:27 PM 1:36 PM 1:57 PM 2:11 PM Time Concrete was Placed (am / pm) 1:17 PM 1:35 PM 1:58 PM 2:07 PM 2:15 PM Depth of Pier From Top of Concrete (fi) 10.80 10.80 10.30 10.30 I0.10 Elevation: Surface (ft)** 99.60 99.60 99.60 99.40 99.30 Elevation: Top of Pier (ii)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft)** 87.20 87.20 87.70 87.70 87.90 Bearing Stratum (description) Tan Sandy Cla~' Note: See report #174181 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Kone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174180 Project No.: 037333 Project: Freeport l0 Date of Service: 4/3/2003 500 Freeport Parkway Page 4 of 5 Driller: Liberty Pier Identification C-4 C-4.5 C-5 C-5.5 C-6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 72 72 72 72 72 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.40 11.30 11.50 11.50 11.50 Depth of Pier After Underreaming (fl)* 11.80 11.40 11.50 12.30 12.50 Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/g6 6/#6 6/#6 6/~ Length of Reinforcing Steel (ft) 10.0 9.5 9.5 10.5 10.5 Time Drilling was Completed (am / pm) 2:34 PM 3:07 PM 3:41 PM 2:50 PM 3:40 PM Time Concrete was Placed (am / pm) 3:30 PM 3:36 PM 4:00 PM 3:41 PM 4:22 PM Depth of Pier From Top of Concrete (fi) 10.20 9.80 9.90 10.80 11.00 Elevation: Surface (ft)** 99.60 99.60 99.60 99.50 99.50 Elevation: Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft)** 87.80 88.20 88.10 87.20 87.00 Bearing Stratum (description) Tan Sandy Clay Note: See report #174181 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. ;IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vaflatlon in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP ' Report No.: 174180 Project No.: 037333 Project: Freeport 10 Date of Service: 4/3/2003 500 Freeport Parkway Page 5 of 5 Driller: Liberty Pier Identification C-6.5 C-7 Pier Diameter (in) 24 24 Bell Diameter (in) 72 72 Required Minimum Depth (fi) 12.00 12.00 Depth of Pier Prior to Underreamln$ (fi) 11.40 12.10 Depth of Pier After Underreamin$ (ft) 11.70 12.20 Condition of Bottom (wet / dry) Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 Len~h of Reinforcing Steel (ft) 10.0 10.0 Time Drilling was Completed (am / pm) 4:00 PM 4:15 PM Time Concrete was Placed (am / pm) 4:08 PM 4:30 PM Depth of Pier From Top of Concrete (ft) 10.20 10.70 ~levation: Surface (f~)** 99.50 99.50 Elevation: Top of Pier (R)** 98.00 98.00 Elevation: Bottom of Pier (ft)** 87.80 87.30 Bearinl~ Stratum (description) Tan Sandy Clay Note: See report #174181 for Compressive Stxength Test Specimens. * Additional Penetrai:ion not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality (composition, appoaranco, performance, etc.) or any other feature of similar subject m