Freeport NIP(7.0)-LR030415RoneEn Ineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Arm: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 174181 Project No.: 037333 Date of Service: 04/03/2003 Report Date: 04/15/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring simples back to the laboratory for curing and testing in accordance wi[h applicable standards. STRENGTH: SLUMP (in): AIR (%): TEST METHOD: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter Concrete Ltd. PLANT: On site SPECIFICATION REQUIREMENTS 4000 psi ~ 28 Days 5" - ?" NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN i.D.: 9361 PLACEMENT DATE: 04/03/2003 WEATHER CONDITIONS: Overcast TIME SAMeLED: 12:35pm BATCaTIME: 12:19pm TEMPERATURE {F) - AIR 72 F CONCRETE: 78 F TRUCK NO: 101 TICRET NO: 113561 AIR CONTENT (%): NA UNIT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Drilled pier locations at office area/section #l SAMPLE LOCATION: REPORT OF TEgT~g Pier locations E.4/3, D.9/3 and D.5/3 .... x 12" (area 28.27 sq. in.) Concrete Compressive Cyhnder 6 CYLINDER MEASURED MAXIMUM 'COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 1 1 5.25 04/10/2003 7 1 2 5.25 05/01/2003 28 1 3 5.25 05/01/2003 28 1 4 5.25 05/29/2003 56 Water added at site: 5 gallons See report #174180 for technician time. Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (l) City of Coppell Building Dept. (1) Potter Concrete Started: Finished: (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. 119140 4210 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented hen:in were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the e~xclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 1 of 1 gineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Atto: Mr. Jeff.Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Ctppell, TX Services: Water Injection Inspection Report No.: 174772 Project No.: 037333 Date of Service: 04/12/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 11:00 a.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no controI. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 174772 Project No.: 037333 Project: Freeport 10 Date of Service: 4/12/2003 500 Freeport Parkway Page 2 of 3 Co ~ell, TX ., DESCRIPTION/EXPLANATION YES NO NIA · Specific gravit)/of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously a~litated X 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved during iniection process until refusal X B. Total depth of iniection - 10 feet x 7. Max. spacin~ of iniection probes was recorded to be 5 ft. x 8. Free lime on surface x 9. Square feet iniected on this date 62,400 10. Location of iniection Building pad, area 6-F Remarks: Completed 5th pass of reinjection See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. - 11:00 a.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, per[ormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of Rone Engineers, Inc. RoneEng neers. . 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9519 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C6ppell, TX Services: Water Injection Inspection Report No.: 174504 Project No.: 037333 Date of Service: 04/09/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheeo Koch Consulting Engineers 6:30 a.m. - 4:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Lu:I. 99DD Page 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 174504 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX -- DESCRIPTION/EXPLANATION YES NO N/A 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X _~. Lime slurr7 was continuously agitated X 3. Surfactant was added to each load x ¢. The iniection pressure was kept between 50 to 100 psi at point of iniection x 5. Intervals of 12" were achieved during iniection process until refusal X 9. Total depth of iniection -- 10 feet X 7. Max. spacing of iniection probes was recorded to be 5 ft. X 9. Free lime on surface X 9. Square feet iniected on this date 70,000 10. Location of iniection Building pad, area 5-E Remarks: Completed 5th pass, reinjection area 5-E See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 6:30 a.m. - 4:30 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of Rone Engineers, Inc, · I 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-981.9 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Atto: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Ctppell, TX Services: Water Injection Inspection Report No.: 174415 Project No.: 037333 Date of Service: 04/08/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (I) Duke Realty Services, LP (i) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 4:30 p.m. (1) Engineering Analyst ( 1 ) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients m whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: 174415 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freeport Parkway Page 2 of 3 Coppell, TX .- DESCRIPTION/EXPLANATION YES NO NIA 1. Specific gravity of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously a~litated X 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of injection x 5. Intervals of 12" were achieved durin~t injection process until refusal x 6. Total depth of iniection -- 10 feet X 7. Max. spacin~l of iniection probes was recorded to be 5 ft. X 8. Free lime on surface x 9. Square feet iniected on this date 70,000 10. Location of injection Building] pad, area 5-E Remarks: Began reinjection of 5-E, 4th pass See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: 6:30 a.m. - 4:30 p.m. Technician: L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. .I R°neEngineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff`Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Reinforcing Steel Inspection Report No.: 174740 Project No.: 037333 Date of Service: 04/11/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Reinforcing Steel Inspection. The results are attached. Technician Time: 3:00 p.m. - 3:30 p.m. Page 1 of 2 Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (I) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e 1 of I RoneEn ' ;ers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Report of Reinforcing Steel Inspection Client: j~),~ e~ Report No.: [ 7/2/ 7 qt9 Project No.: (.9 3 7 33 3 Project:.. ~ce~a/~c / o Date of Service: ~-//-~, J Page ~L of "L Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming Placing Drawings ~ Bar Length Column Ties Properly Approved and Shape ~ Tied and Spaced Bar Size ~ ' Proper Bar Placement ~ Stirrup Spacing and Type ~ Bar Grade ~ Properly Tied ~ Lapped Splices ~ Barn Clean ~ Dowel Bars in Place ~ Welded Splices ~ ,- Form Clean ~ Proper Bar Supports ~ Mechanical Splices ~ Number Bars ~ Proper Cover ~ Discrepancies/Comments: Inspector's Signature: ,~, ~/~-~ Time: Client/Contractor Signature:r~/c';J;~;:'/~dx Client/Contracto~ ~,,pi~. ~iI~ o.Results:. Yes/No ineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630=9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C6ppell, TX Services: Drilled Pier Inspection Report No.: 174508 Project No.: 037333 Date of Service: 04/09/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to assist primary Rone Engineers field representative with the inspection of drilled piers and sampling/testing of concrete. See drilled pier inspection report #174506 and concrete compressive strength report ~174507 for additional information. Technician Time: 6:30 a.m. - 5:30 p.m. Page 1 of 1 Technician: Arty Nickonov Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page I of 1 ROneEng,neers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Drilled Pier Inspection Report No.: 174610 Project No.: 037333 Date of Service: 04/10/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to assist primary Rone Engineers field representative with the inspection of drilled piers and sampling/testing of concrete. See drilled pier inspection report ~174608 and concrete compressive strength report #174609 for additional information. Technician Time: 6:30 a.m. - 5:30 p.m. Page 1 of 1 Technician: Arty Nickonov Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Paeheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. - '1~. Scott Watson - CMT Operations Manager LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page 1 of 1 gineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION CHent: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Ctppell, TX Services: Drilled Pier Inspection Report No.: 174700 Project No.: 037333 Date of Service: 04/11/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to assist primary Rone Engineers field representative with the inspection of drilled piers and sampling/testing of concrete. See drilled pier inspection report #174698 and concrete compressive strength report ~174699 for additional information. Technician Time: 6:30 a.m. - 4:30 p.m. Page 1 of 1 Technician: Arty Nickonov Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheeo Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DB Page 1 of 1 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF WATER INJECTION INSPECTION Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Water Injection Inspection Report No.: 174696 Project No.: 037333 Date of Service: 04/11/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Water Injection Inspection. The results are attached. Technician Time: Page 1 of 3 Technician: Lanny Gist Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 3:00 p.m. and 3:30 p.m. - 5:00 p.m. ( 1 ) Engineering Analyst (1) City of Coppetl Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full withom the written appmval of Rone Engineers, Ltd. 99DD Pa~e 1 of 1 WATER INJECTION OBSERVATION Client: Duke Realty Services, LP Report No.: Project No.: Project: Date of Service: Page 2 of 3 174696 · DESCRIPTION/EXPLANATION YES NO NIA 1. Specific ~ravib/of lime was checked and found to be 1.14 and 1.17 X 2. Lime slurry was continuously agitated , x 3. Surfactant was added to each load X 4. The injection pressure was kept between 50 to 100 psi at point of iniection X 5. Intervals of 12" were achieved during injection process until refusal X 6. Total depth of iniection -- 10 feet X 7. Max. spacing of injection probes was recorded to be 5 ft. X 8. Free lime on surface X 9. Square feet iniected on this date 62,400 10. Location of injection Building pad, area 6-F 037333 Freeport 10 4/11/2003 500 Freeport Parkway Coppell, TX Remarks: 4th pass, reinjection See attached for sketch of injected area, pass number for each area, dimension of injection area, and amount of lime used on this date. Time: Technician: 6:30 a.m. - 3:00 p.m. and 3:30 p.m. - 5:00 p.m. L. Gist LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Inc. .I- · I ROneEng!neers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION CANCELLATION Client: Duke Realty Services, LP Attn: Mr. Jeff.Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Drilled Pier Inspection Cancellation Report No.: 174355 Project No.: 037333 Date of Service: 04/07/2003 Report Date: 04/15/2003 Report of Cancellation On this date, a Rone Engineering, Ltd. representative arrived on-site as scheduled to perform Drilled Pier Inspection. Upon arrival, the technician was informed of job cancellation. Technician time: 6:30 a.m. - 8:00 a.m. Page 1 of 1 Technician: Arty Nickonov Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leaers and reports are for the exclusive use of the clients to whom they are addressed and shall not be ~produced except in full without the written approval of Rone Engineers, Ltd. 99DD Paae 1 of 1 ROneEn g neer 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) IN-PLACE DENSITY TESTING Client: Project: Services: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Liae Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. Report No.: 174607 Project No.: 037333 Date of Service: 04/10/2003 Report Date: 04/15/2003 PROJECT DATA CONTRACTOR: Duke Realty Services, LP Standard Counts Gauge: Troxler 3430 Test Methods: ASTM D-2922 Moisture Density ASTM D-3017 Gauge Serial No: 32720 Current: 653 Currant: 3084 Test Mode: DT Previous: 656 Previous: 3077 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Dark Brown Clay 19.5 104.5 Optimum +4 95 min FIELD DENSITY TESTS TEST NO TEST LOCATION PROBE MID MOISTURE WET DENSITY DRY DENSITY DENSITY DEPTH No. (%) (pcf) (PC0 (% max} Backf'fll 1 8" waterline, west parking lot, 200' north of 6" 1 21.6 123.5 101.6 97 southwest comer building, 1' below BackYfll 2 8" waterline, west parking lot, 200' north of 6" 1 22.8 127.0 103.4 99 southwest comer building, 2' below BackYlll 3 8" waterline, west parking lot, 75' north of 6" 1 22.1 121.9 99.8 96 southwest comer building, 1' below Backfill 4 8" waterline, west parking lot, 75' north of 6" 1 22.9 125.4 102.0 98 southwest comer building, 2' below Backf'ffi 5 8" waterline, southwest parking lot, 30' east 6" 1 21.3 124.6 102.7 98 of southwest comer building, 1' below LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 2 Report No.: 174607 RoneEngineers Project No.: 037333 Client: Duke Realty Services, LP Jill TEST PROBE NO TEST LOCATION DEPTH MID MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pcf) (pcf) (% max) Backf'fll 6 8" waterline, southwest parking lot, 30' east of southwest comer building, 2' below Backfill 7 8" waterline, southwest parking lot, 200' east of southwest comer building, 1' below Backfill 8 8" waterline, southwest parking lot, 200' east of southwest comer building, 2' below Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (I) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6" 1 20.2 121.9 101.4 97 6" 1 19.7 119.8 100.1 96 6" 1 20.4 121.4 100.8 96 (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eng/neers, Ltd. 07DD Page 2 of 2 RoneEngineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (n4) 6~0-9~9 (fax) REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C~ppell, TX Services: Drilled Pier Inspection Report No.: 174506 Project No.: 037333 Date of Service: 04/09/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 8 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Paeheco Koch Consulting Engineers 6:30 a.m. - 5:00 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results pmsented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports am for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in flail without the written approval of Rone Engineers, Ltd. 99DD Pa~,e 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 2 of 8 Driller: Liberty Pier Identification C-8 C-9 B.9-10 B.9-12 B.9-11 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (f~) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (it) 11.60 11.50 11.50 11.60 11.40 Depth of Pier After Underreaming (f~)* 12.50 11.50 11.70 11.70 11.80 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (f~) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (It) 11.5 10.4 10.5 10.8 10.4 Time Drilling was Completed (am / pm) 8:56 AM 8:52 AM 10:24 AM 10:14 AM 9:30 AM Time Concrete was Placed (am / pm) 9:40 AM 9:45 AM 10:48 AM 10:36 AM 9:52 AM Depth of Pier From Top of Concrete (1t) 12.00 11.00 11.20 11.30 11.30 Elevation: Surface (It)** 99.50 99.50 99.50 99.40 99.50 Elevation: Top of Pier (It)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (It) ** 87.00 88.00 87.80 87.70 87.70 Bearing Stratum (description) Tan Sandy Clay Note: See report #174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. . Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top o£bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. Note 1: Minimum depth 12' or top of sand whichever is first. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd, RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 3 of 8 Driller: Liberty ?ier Identification B.9-13 D-14 B.9-14 E-14 F-14 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.80 11.30 11.40 1 I. 10 12.00 Depth of Pier After Underreaming (it)* 11.90 11.50 13.80 11.30 12.90 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.9 10.5 12.8 10.5 12.0 Time Drilling was Completed (am / pm) 10:10 AM 10:50 AM 10:31 AM 10:57 AM 11:41 AM Time Concrete was Placed (am / pm) 11:40 AM 12:10 PM 12:00 PM 12:18 PM 12:24 PM Depth of Pier From Top of Concrete (it) 11.50 11.00 13.30 10.80 12.50 Elevation: Surface (ft)** 99.40 99.50 99.50 99.50 99.40 Elevation: Top of Pier (t~)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 87.50 88.00 85.70 88.20 86.50 Beating Stratum (description) Tan Sandy Clay iNote: See report #174507 for Compressive Strength Test Specimens. I, Additional Penetration not requested unless noted. . Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, perfon'nance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 4 of 8 Driller: Liberty Pier Identification G- 14 H- 14 J- 14 K- 14 L- 14 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.40 12.40 12.50 12.20 12.00 Depth of Pier After Underreaming (ft)* 12.40 12.90 12.60 12.20 13.60 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 11.5 11.5 11.5 11.0 12.5 Time Drilling was Completed (am / pm) 11:38 AM 11:10 AM 12:48 PM 1:01 PM t 1:48 AM Time Concrete was Placed (am / pm) 12:30 PM 12:38 PM 1:06 PM 1:14 PM 1:20 PM Depth of Pier From Top of Concrete (ft) 12.00 12.40 12.00 11.80 13.00 Elevation: Surface (ft)** 99.40 99.50 99.60 99.40 99.60 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 87.00 86.60 87.00 87.20 86.00 Bearing Stratum (description) Tan Sandy Clay Note: See report #174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport I0 Date of Service: 4/9/2003 500 Freeport Parkway Page 5 of 8 Driller: Liberty Pier Identification M - 14 N- 14 N-3 M-3 D3 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.00 12.00 11.70 11.10 10.70 Depth of Pier After Underreaming (ft)* 13.90 12.50 11.70 11.20 11.50 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinfoming Steel (ft) 13.0 11.7 10.7 10.0 10.5 Time Drilling was Completed (am / pm) 1:32 PM 12:55 PM 1:37 PM 2:12 PM 2:31 PM Time Concrete was Placed (am / pm) 1:50 PM ' 1:56 PM 2:05 PM 3:04 PM 3:20 PM Depth of Pier From Top of Concrete (ft) 13.50 12.00 11.20 10.70 11.00 Elevation: Surface (ft)** 99.40 99.50 99.50 99.50 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 85.50 87.00 87.80 88.30 88.00 Bearing Stratum (description) Tan Sandy Clay Note: See report #174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. . Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport l0 Date of Service: 4/9/2003 500 Freeport Parkway Page 6 of 8 Driller: Liberty Pier Identification K-3 J-3 H-3 G-3 F-3 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.90 9.80 10.20 10.00 10.70 Depth of Pier After Underreaming (ft)* 12.90 10.00 10.30 10.30 11.00 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (t~) NA NA NA NA NA qumber of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 12.0 9.0 9.5 9.5 10.0 rime Drilling was Completed (am / pm) 1:38 PM 1:57 PM 3:00 PM 3:10 PM 3:30 PM Time Concrete was Placed (am / pm) 3:26 PM 3:31 PM 3:55 PM 4:06 PM 4:15 PM Depth of Pier From Top of Concrete (ft) 12.50 9.50 9.80 9.80 10.40 Elevation: Surface (ft)** 99.40 99.50 99.50 99.50 99.60 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 86.50 89.50 89.20 89.20 88.60 Bearing Stratum (description) Tan Sandy Clay Note: See report # 174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted.. Remarks: ** - Elevation data not supplied to Reno Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 7 of 8 Driller: Liberty !Pier Identification D-4 E-4 F-4 G-4 I-I4 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12'.00 12.00 12.00 12.00 Depth of Pier Prior to Underream!ng (fi) 10.50 10.00 11.30 11.20 11.10 Depth of Pier After Underreaming (ft)* 11.30 10.30 11.70 11.70 12.70 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.5 9.5 10.7 10.5 12.0 Time Drilling was Completed (am / pm) 3:24 PM 3:35 PM 3:15 PM 3:33 PM 4:12 PM Time Concrete was Placed (am / pm) 4:20 PM 4:40 PM 4:45 PM 4:51 PM 4:55 PM Depth of Pier From Top of Concrete (ft) 10.80 9.90 11.20 11.20 12.30 Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 88.20 89.10 87.80 87.80 86.70 Bearing Stratum (description) Tan Sandy Clay Note: See report #174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted.. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete bom existing surface elevation. LIMITATIONS: The test resuRs presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174506 Project No.: 037333 Project: Freeport 10 Date of Service: 4/9/2003 500 Freeport Parkway Page 8 of 8 Driller: Liberty Pier Identification J-4 K-4 L-4 Pier Diameter (in) 24 24 24 Bell Diameter (in) 66 66 66 Required Minimum Depth (It) 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (fi) 10.40 10.00 10.30 Depth of Pier After Underreaming (ft)* I0.90 10.10 11.00 Condition of Bottom (wet / dry) Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Casing Diameter (in) / Casing Length (it) NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.0 9.0 10.0 Time Drilling was Completed (am / pm) 3:53 PM 4:30 PM 4:15 PM Time Concrete was Placed (am / pm) 5:00 PM 5:05 PM 5:10 PM Depth of Pier From Top of Concrete (it) 10.40 9.50 10.50 Elevation: Surface (it)** 99.50 99.60 99.50 Elevation: Top of Pier (it)** 99.00 99.00 99.00 Elevation: Bottom of Pier (It)** 88.60 89.50 88.50 Bearing Stratum (description) Tan Sandy Clay Note: See report #174507 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. . Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject m RoneEngineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF D LLED PIER INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway C6ppell, TX Services: Drilled Pier Inspection Report No.: 174698 Project No.: 037333 Date of Service: 04/11/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 7 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Paeheco Koch Consulting Engineers 6:30 a.m. - 3:00 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Page 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174698 Project No.: 037333 Project: Freeport 10 Date of Service: 4/11/2003 500 Freeport Parkway Page 2 of 7 Driller: Liberty Pier Identification E-7 D-7 Pier Diameter (in) 24 24 Bell Diameter (in) 66 66 Required Minimum Depth (ft) 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.80 11.90 Depth of Pier After Underreaming (ft)* 12.10 12.30 Condition of Bottom (wet / dry) Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Casing Diameter (in) / Casing Length (It) NA NA Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 Length of Reinforcing Steel (ft) 11.0 11.4 Time Drilling was Completed (am / pm) 2:18 PM 2:07 PM Time Concrete was Placed (am / pm) 3:22 PM 3:31 PM Depth of Pier From Top of Concrete (f0 11.60 11.80 Elevation: Surface (ft)** 99.50 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 Elevation: Bottom of Pier (ft)** 87.40 87.20 Bearing Stratum (description) Tan Sandy Clay Note: See report # 174699 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. Note 1: Minimum depth 12' or top of sand whichever is first. LIMITATIONS: The test results presented herein were prepared based upon tho specific samples provided for testing. We assuree no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of sirnilar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty ServiCes, LP Report No.: 174698 Project No.: 037333 Project: Freeport l0 Date of Service: 4/11/2003 500 Freeport Parkway Page 3 of 7 Driller: Liberty Pier Identification K-7 J-7 H-7 G-7 F-7 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 10.50 11.00 10.80 10.80 11.80 Depth of Pier After Underreaming (fi)* 11.30 11.00 11.20 11.40 12.20 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 10.3 10.0 10.0 10.5 11.0 Time Drilling was Completed (am / pm) 1:03 PM 1:47 PM 2:09 PM 2:28 PM 2:19 PM Time Concrete was Placed (am / pm) 2:09 PM 2:31 PM 2:20 PM 3:01 PM 3:14 PM Depth of Pier From Top of Concrete (ft) 10.80 10.40 10.70 11.00 11.70 Elevation: Surface (It)** 99.50 99.60 99.50 99.40 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (It)** 88.20 88.60 88.30 88.00 87.30 Bearing Stratum (description) Tan Sandy Clay Note: See report #174699 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete f~om existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in :luality (composition, appearance, performance, etc,) or any other feature of similar subject rn RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174698 Project No.: 037333 Project: Freeport 10 Date of Service: 4/11/2003 500 Freeport Parkway Page 4 of 7 Driller: Liberty Pier Ideofification M-6 N-6 N-7 M-7 L-7 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (fi) 11.50 11.50 11.50 11.40 10.50 Depth of Pier After Underreaming (it)* 11.90 11.80 11.60 12.90 10.90 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (It) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (it) 11.0 10.9 10.6 12.0 9.8 Time Drilling was Completed (am / pm) 11:06 AM 11:39 AM 12:45 PM 12:03 PM 1:11 PM Time Concrete was Placed (am / pm) 11:58 AM 11:44 AM 1:29 PM 1:40 PM 1:52 PM Depth of Pier From Top of Concrete (ti) 11.40 11.40 11.10 12.40 10.50 Elevation: Surface (it)** 99.50 99.40 99.50 99.50 99.40 Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (it)** 87.60 87.60 87.90 86.60 88.50 Bearing Stratum (description) Tan Sandy Clay Note: See report #174699 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174698 Project No.: 037333 Project: Freeport 10 Date of Service: 4/11/2003 500 Freeport Parkway Page 5 of 7 Driller: Liberty Pier Idemification G-6 H-6 J-6 K-6 L-6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minlmnm Depth (fl) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (it) 11.80 10.80 11.20 10.50 10.60 Depth of Pier After Underreaming (it) * 11.80 11.20 11.50 10.60 10.60 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (it) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (it) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.6 10.0 10.5 9.7 9.7 Time Drilling was Completed (am / pm) 8:40 AM 9:17 AM 9:52 AM 10:19 AM 10:45 AM Time Concrete was Placed (am / pm) 9:58 AM 10:09 AM 10:17 AM 11:22 AM 11:37 AM Depth of Pier From Top of Concrete (it) 11.20 10.70 11.00 10.10 10.20 Elevation: Surface (ft)** 99.60 99.50 99.50 99.50 99.40 Elevation: Top of Pier (it) ** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (it)** 87.80 88.30 88.00 88.90 88.80 Bearing Stratum (description) Tan Sandy Clay Note: See report #174699 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174698 Project No.: 037333 Project: Freeport 10 Date of Service: 4/11/2003 500 Freeport Parkway Page 6 of 7 Driller: Liberty Pier Ide ,ntification C-2.5 D.2-2.5 B-2.5 A.3-2.5 A.3-3 Pier Diameter (in) 30 30 30 30 30 :Bell Diameter (in) 84 84 84 84 84 Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (fi) 10.40 10.50 10.70 11.00 10.90 IDepth of Pier After Underreaming (ii)* 10.50 10.80 10.80 11.10 11.50 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (It) NA NA NA NA NA Number of Bars / Reinfoming Bar Size (#) 8/#6 8/#6 8/#6 8/#6 8/#6 Length of Reinforcing Steel (It) 9.7 9.8 9.8 10.1 10.8 Time Drilling was Completed (am / pm) 9:30 AM 9:04 AM 10:00 AM 10:23 AM 10:50 AM Time Concrete was Placed (am / pm) 10:52 AM 10:45 AM 11:15 AM 11:22 AM 1:45 PM Depth of Pier From Top of Concrete (It) 10.00 10.40 10.30 10.50 11.10 Elevation: Surface (fi)** 99.50 99.40 99.50 99.60 99.40 Elevation: Top of Pier (It)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (fi)** 89.00 88.60 88.70 88.50 87.90 Bearing Stratum (description) Tan Sandy Clay Note: See report #174699 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete fi.om existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject rn RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174698 Project NO.: 037333 Project: Freeport 10 Date of Service: 4/11/2003 500 Freeport Parkway Page 7 of 7 Driller: Liberty Pier Identification B-3 A.3-4 B-4 A.3-4.7 B-4.7 Pier Diameter (in) 30 30 30 30 30 Bell Diameter (in) 84 84 84 84 84 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underre~ming (fl) 11.20 10.40 11.00 11.00 10.60 Depth of Pier After Underreamlng (ft)* 12.00 10.40 11.10 11.30 11.20 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fr) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 8/#6 8/#6 8/#6 8/#6 8/#6 Length of Reinforcing Steel (it) 11.0 9.5 10.0 10.2 10.3 Time Drilling was Completed (am / pm) 11:17 AM 12:56 PM 11:40 AM 1:16 PM 1:43 PM Time Concrete was Placed (am / pm) 1:51 PM 2:00 PM 2:07 PM 2:15 PM 2:24 PM Depth of Pier From Top of Concrete (ft) 11.50 10.00 10.60 10.80 10.70 Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 87.50 89.00 88.40 88.20 88.30 Bearing Stratum (description) Tan Sandy Clay Note: See report #174699 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m ineers Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Drilled Pier Inspection 8908 Ambassador Row DaUas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION Report No.: 174417 Project No.: 037333 Date of Service: 04/08/2003 Report Date: 04/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1} Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 4:45 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. K. Scott arson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION 'Client: Duke Realty Services, LP Report No.: 174417 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freepo~ Parkway Page 2 of 6 Driller: Liberty Pier Identification B.5-7 A.9-7 A.2-7 A-6.5 A-6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 72 72 66 66 66 Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (it) 13.00 12.80 13.50 13.00 11.00 Depth of Pier Aiter Underreaming (it)* 13.40 13.50 13.50 13.00 11.50 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (it) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 11.5 11.5 11.5 11.0 9.0 Time Drilling was Completed (am / pm) 8:43 AM 9:05 AM 9:22 AM 9:28 AM 9:52 AM Time Concrete was Placed (am / pm) 9:10 AM 9:20 AM 9:38 AM 10:08 AM 10:15 AM Depth of Pier From Top of Concrete (it) 11.90 12.00 12.00 11.50 10.00 Elevation: Surface (it)** 99.50 99.50 99.50 99.50 99.50 Elevation: Top of Pier (it)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (it)** 86.10 86.00 86.00 86.50 88.00 Bearing Stratum (description) Tan Sandy Clay Note: See report #174418 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. Note 1: Minimum depth of 12' or top of sand whichever is first. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composifion, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174417 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freeport Parkway Page 3 of 6 Driller: Liberty Pier Identification A-5.5 A-5 A-4.5 A-4 A-3.1 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 60 60 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underre~mlng (ft) 12.00 12.00 12.00 12.20 11.60 Depth of Pier After Underreaming (ft)* 12.00 12.10 12.00 12.60 11.80 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (f~) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 9.3 10.0 10.0 8.6 8.0 Time Drilling was Completed (am / pm) 9:54 AM 10:20 AM 10:24 AM 10:49 AM 10:55 AM Time Concrete was Placed (am / pm) 10:20 AM 10:25 AM 10:40 AM 11:20 AM 11:24 AM Depth of Pier From Top of Concrete (t~) 10.50 10.50 10.40 9.10 8.30 Elevation: Surface (ft)** 99.50 99.60 99.60 99.50 99.50 Elevation: Top of Pier (ft)** 98.00 98.00 98.00 96.00 96.00 Elevation: Bottom of Pier (ft)** 87.50 87.50 87.60 86.90 87.70 iBearing Stratum (description) Tan Sandy Clay Note: See report #174418 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. ~emarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the spedfic samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174417 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freeport Parkway Page 4 of 6 Driller: Liberty Pier Identification A-2.7 A-2.4 A-2 A- 1.5 A.2-1 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.60 11.80 12.60 12.00 11.20 Depth of Pier After Underreaming (ft)* 12.60 12.70 12.90 12.30 11.20 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinfoming Steel (fi) 10.5 10.5 11.0 10.3 9.0 Time Drilling was Completed (am / pm) 11:33 AM 11:57 AM 11:43 AM 1:00 PM 1:43 PM Time Concrete was Placed (am /pm) 11:49 AM 12:25 PM 12:35 PM 1:50 PM 2:00 PM Depth of Pier From Top of Concrete (fi) 11.10 11.20 11.40 10.70 9.60 Elevation: Surface (fi)** 99.50 99.50 99.50 99.60 99.60 Elevation: Top of Pier (f0** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (fi)** 86.90 86.80 86.60 87.30 88.40 Bearing Stratum (description) Tan Sandy Clay Note: See report #174418 for Compressive Strength Test Specimeas. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the spedfic samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174417 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freeport Parkway Page 5 of 6 Driller: Liberty Pier Identification A.4-1 A.9-1 B. 5-1 C- 1 C.5-1 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (f0 12.80 I 1.40 11.20 11.10 11.80 Depth of Pier ARer Underreaming (ft)* 12.80 11.50 11.20 11.30 11.80 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (it) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (it) 10.6 9.2 9.2 9.2 10.0 Time Drilling was Completed (am / pm) 1:02 PM 1:23 PM 1:54 PM 2:18 PM 2:20 PM Time Concrete was Placed (am / pm) 1:24 PM 2:05 PM 2:12 PM 2:55 PM 3:00 PM Depth of Pier From Top of Concrete (it) 11.20 10.00 9.60 9.70 10.30 Elevation: Surface (it)** 99.60 99.50 99.60 99.60 99.50 Elevation: Top of Pier (fi)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (it)** 86.80 88.00 88.40 88.30 87.70 Bearing Stratum (description) Tan Sandy Clay Note: See report #174418 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, per[ormance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174417 Project No.: 037333 Project: Freeport 10 Date of Service: 4/8/2003 500 Freeport Parkway Page 6 of 6 Driller: Liberty Pier Ideatification C.7-1 D.2-1 D.5-1 D.9-1 E.4-1.5 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.50 11.20 11.00 11.20 11.10 Depth of Pier After Underreaming (ft)* 11.50 11.20 11.00 11.50 11.60 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 9.5 9.1 8.8 9.6 9.5 Time Drilling was Completed (am / pm) 2:57 PM 2:37 PM 3:13 PM 3:40 PM 3:36 PM Time Concrete was Placed (am / pm) 3:23 PM 3:30 PM 3:50 PM 3:55 PM 4:05 PM Depth of Pier From Top of Concrete (ft) 10.00 9.70 9.40 10.00 10.00 Elevation: Surface (ft)** 99.50 99.50 99.60 99.50 99.60 Elevation: Top of Pier (ft)** 98.00 98.00 98.00 98.00 98.00 Elevation: Bottom of Pier (ft)** 88.00 88.30 88.60 88.00 88.00 Bearing Stratum (description) Tan Sandy Clay Note: See report #174418 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, pen~ormance, etc.) or any other feature of similar subject m RoneEn g 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 (214) 630-9819 (fax) REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Cbppell, TX Services: Drilled Pier Inspection Report No.: 174608 Project No.: 037333 Date of Service: 04/10/2003 Report Date: (I4/15/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 5:30 p.m. (1) Engineering Analyst (1) City of Coppell Engineering Dept. CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa£e 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174608 Project No.: 037333 Project: Freeport 10 Date of Service: 4/10/2003 500 Freeport Parkway Page 2 of 6 Driller: Liberty Pier Identification E.2-1.9 D.8-1.9 D.2-1.9 C.6-1.9 C-1.9 Pier Diameter (in) 30 30 30 30 30 Bell Diameter (in) 84 84 84 84 84 Required Minimum Depth (It) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.30 11.00 10.80 11.20 11.50 Depth of Pier After Underreaming (ft)* 11.30 11.40 11.10 11.30 11.60 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 8/#6 8/#6 8/#6 8/#6 8/#6 Length of Reinforcing Steel (it) 10.2 10.4 9.8 10.4 10.5 Time Drilling was Completed (am / pm) 9:40 AM 10:09 AM 10:36 AM 10:58 AM 11:24 AM Time Concrete was Placed (am / pm) 10:52 AM 10:57 AM 11:15 AM 11:22 AM 12:30 PM Depth of Pier From Top of Concrete (it) 10.80 10.80 10.70 10.80 11.20 Elevation: Surface (It)** 99.50 99.60 99.40 99.50 99.40 Elevation: Top of Pier (it)** 99.00 .! 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (It)** 88.20 88.20 88.30 88.20 87.80 Bearing Stratum (description) Tan Sandy Clay Note: See report #174609 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. Notel: 12' minimum depth or top of sand whichever is first. LIMITATIONS: The test resu[[s presented herein were prepared based upon the spedfic samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, ets.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wdtten approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174608 Project No.: 037333 Project: Freeport 10 Date of Service: 4/10/2003 500 Freeport Parkway Page 3 of 6 Driller: Liberty Pier Ide.ntification B-1.9 A.4-1.9 E.2-2.5 D.8-2.5 C.6-2.5 Pier Diameter (in) 30 30 30 30 30 Bell Diameter (in) 84 84 84 84 84 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (t~) 11.30 11.50 10.80 10.70 11.60 Depth of Pier At~er Underreaming (it)* 11.40 11.80 11.30 I 1.10 12.00 Condition of Bottom (wet / d~) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (f~) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 8/#6 8/#6 8/#6 8/#6 8/#6 Length of Reinforcing Steel (ft) 10.5 10.8 10.4 10.0 11.0 Time Drilling was Completed (am / pm) 11:56 AM 1:10 PM 2:26 PM 1:47 PM 3:30 PM Time Concrete was Placed (am / pm) 12:38 PM 2:05 PM 2:42 PM 2:35 PM 4:05 PM Depth of Pier From Top of Concrete (ft) 11.00 11.30 10.70 10.60 11.50 Elevation: Surface (It)** 99.40 99.50 99.60 99.50 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (It)** 88.00 87.70 88.30 88.40 87.50 Bearing Stratum (description) Tan Sandy Clay Note: See report #174609 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete fi.om existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174608 Project No.: 037333 Project: Freeport 10 Date of Service: 4/10/2003 500 Freeport Parkway Page 4 of 6 Driller: Liberty Pier Identification M-4 N-4 N-5 M-5 L-5 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (lc) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.40 11.60 12.00 10.80 10.90 Depth of Pier After Underreaming (ft)* 11.40 11.70 12.10 11.10 10.90 Condition of Bottom (wet / dr7) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (lc) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.4 10.5 11.0 10.0 9.8 Time Drilling was Completed (am / pm) 8:38 AM 9:03 AM 9:37 AM 10:10 AM 10:51 AM Time Concrete was Placed (am / pm) 9:25 AM 9:34 AM 9:48 AM 10:12 AM 12:28 PM Depth of Pier From Top of Concrete (lc) 10.90 11.10 11.60 10.50 10.40 Elevation: Surface (ft)** 99.50 99.60 99.50 99.60 99.50 Elevation: Top of Pier (f0** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (lc)** 88.10 87.90 87.40 88.50 88.60 Bearing Stratum (description) Tan Sandy Clay Note: See report #174609 for Compressive Sirength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174608 Project No.: 037333 Project: Freeport 10 Date of Service: 4/10/2003 $00 Freeport Parkway Page 5 of 6 Driller: Liberty Pier Identification K-5 J-5 H-5 G-5 F-5 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.20 11.00 11.40 10.70 11.10 Depth of Pier After Underreaming (ft)* 11.30 11.10 11.50 12.30 11.80 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ft) 10.3 10.0 10.7 11.0 10.7 Time Drilling was Completed (am / pm) 11:31 AM 11:24 AM 12:50 PM 1:03 PM 2:04 PM Time Concrete was Placed (am/pm) 12:39 PM 1:17 PM 1:28 PM 1:43 PM 2:49 PM Depth of Pier From Top of Concrete (ffi 10.90 10.50 11.00 11.70 11.20 Elevation: Surface (fi)** 99.40 99.60 99.50 99.60 99.60 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 88.10 88.50 88.00 87.30 87.80 .Bearing Stratum (description) Tan Sandy Clay Note: See report #174609 for Compressive Strength Test Specimens. I* Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 174608 Project No.: 037333 Project: Freeport 10 Date of Service: 4/10/2003 500 Freeport Parkway Page 6 of 6 Driller: Liberty Pier Identification E-5 D-5 D~6 E-6 F-6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 11.00 11.00 11.40 10.70 11.30 Depth of Pier After Underreaming (ft)* 11.50 11.50 12.00 11.20 11.70 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (Ir) 10.5 10.5 11.0 10.0 10.5 Time Drilling was Completed (am / pm) 2:37 PM 3:13 PM 3:27 PM 2:50 PM 2:09 PM Time Concrete was Placed (am / pm) 2:56 PM 3:22 PM 3:55 PM 3:50 PM 3:12 PM Depth of Pier From Top of Concrete (It) 11.00 11.00 11.40 10.60 11.30 Elevation: Surface (fl)** 99.50 99.50 99.60 99.60 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 88.00 88.00 87.60 88.40 87.70 Bearing Stratum (description) Tan Sandy Clay Note: See report #174609 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m