SW0001-CS030404J4
WEEKLY PROJECT STATUS REPORT
DATE:
March 31 — April 4, 2003
PROJECT NO.:
2230 - 01.148
CLIENT:
City of Coppell
BY:
Bradley J. Moss
PROJECT:
Riverchase Elevated Sidewalk
REVIEWED BY:
Steve A. Markussen
Date Item
03/25 1. Chris Brasch (Acurrate Services (817) 685 -0872) called and explained that 2 out of the 3
controlling points onsite have been destroyed. He requested an AutoCAD drawing to
assist him in finding the horizontal control. BJM emailed Chris the drawing. Chris called
requesting a field crew to reset irons onsite. BJM explained that PK has to be released
from the City first and then a crew could be scheduled. Chris explained that he will put it
back in Greenscaping's hands and they will call the City.
cc: City of Coppell — Kenneth Griffin
BJM /slt
2230 -39