Loading...
SW0001-CS030404J4 WEEKLY PROJECT STATUS REPORT DATE: March 31 — April 4, 2003 PROJECT NO.: 2230 - 01.148 CLIENT: City of Coppell BY: Bradley J. Moss PROJECT: Riverchase Elevated Sidewalk REVIEWED BY: Steve A. Markussen Date Item 03/25 1. Chris Brasch (Acurrate Services (817) 685 -0872) called and explained that 2 out of the 3 controlling points onsite have been destroyed. He requested an AutoCAD drawing to assist him in finding the horizontal control. BJM emailed Chris the drawing. Chris called requesting a field crew to reset irons onsite. BJM explained that PK has to be released from the City first and then a crew could be scheduled. Chris explained that he will put it back in Greenscaping's hands and they will call the City. cc: City of Coppell — Kenneth Griffin BJM /slt 2230 -39