April 14, 2003
AT &T LOCAL NETWORK SERVICES
Jim Peck
2400 Boardwalk Drive
Mesquite, TX 75181
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Peck:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
C
Suza Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COFFELL
X A s 1 8
April 14, 2003
COMCAST
Kevin Mullaney, Construction Supervisor
1565 Chenault Street
Dallas, TX 75228
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Mullaney:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
�nTCb (lob
Suza .Taylor
CIP ordinator
Enclosure
255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COFFE
T f :. yam ,✓ ' ...� �•y,t O
X A s t 8
April 14, 2003
COSERV
Brian Tomlinson
7701 S Stemmons
Corinth, TX 75065
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Tomlinson:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
15 TNT
Suz . Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P. 0 . BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COPPELL
A a 1
April 14, 2003
EXPLORER PIPELINE
Patrick Nwakoby
6846 S Canton
Tulsa, OK 74136
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Nwakoby:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
Suz . Taylor
CIP crdinator
Enclosure
255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COFFELL
F � q
X A b t 8
April 14, 2003
METROMEDIA FIBER NETWORK
Tommy Capps
5080 Spectrum Drive, Suite 80OW
Addison, TX 75001
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Capps:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
Suz . Taylor
CIP ordinator
Enclosure
255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T Y O F
COFFELL
r F �. a o
April 14, 2003
ONCOR
Doug Brewer, Project Mgmt.
4200 N. Belt Line Road
Irving, TX 75038
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Brewer:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
- raL
Suz Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E G I T Y O F
COPPELL
April 14, 2003
OnFIBER CARRIER SERVICE
Tim Norris, Operations Mgr.
1820 N Glenville Drive, Suite 114
Richardson, TX 75081
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Norris:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 -304 -7019.
Sincerely,
Tcgl '
Suz . Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C I T Y O F
COPPELL
_ lo r
T
April 14, 2003
QWEST COMMUNICATIONS
Paul Gonzales, Relocation Mgr.
1860 Lincoln Street, Suite 200
Denver, CO 80295
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Gonzales:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
Suz . Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P. O.BOX 478 * CORRELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673
T H E C 1 T V O F
COPPELL
April 14, 2003
SBC
Peter Russell
3 Bell Plaza, Room 2124
308 S Akard St
Dallas, TX 75202
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Russell:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
d T "lov
SuzA. Taylor
CIP Coordinator
Enclosure
255 PARKWAY * P.O. BOX 476 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972/304 3673
T H E C I T Y O F
COPPEL
F - Y_ �IYf� '9111" 4 O
X A S t 8
April 14, 2003
TXU Communication Services
Mark Wilson
115 W Seventh St.
Suite 308
Fort Worth, TX 76102
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Wilson:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
Suz .Taylor
CIP Coordinator
Enclosure
255 PARKWAY * PO BOX 478 * COPPELL T% 75019 * TEL 9721462 0022 * FAX 972/304 3673
T H E C I T Y O F
April 14, 2003
VERIZON COMMUNICATIONS
Bob Holland
2094 McGee Lane
Lewisville, TX 75077
COPPELL
X A X 1 8
RE: Deforest Road Lift Station Improvements
Force Main Lines A & B
Project # SS 99 -01
Dear Mr. Holland:
Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the
installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main
will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate
construction methods for the installation of the force main: open cut and directional drilling. The
directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of
plans to determine if you have any utilities within the project limits, and provide me with any
comments that you may have. Also, please comment as to any precautions that should be taken to
protect your utilities.
Your consideration of this matter is appreciated. Should you have any questions or need any additional
information, please feel free to contact me at 972 - 304 -7019.
Sincerely,
6 cw T"
Suza Taylor
CIP Coordinator
Enclosure