Loading...
SS9901-CS030414T H E C I T Y O F COPPEL / Lk X A s 1 8 April 14, 2003 AT &T LOCAL NETWORK SERVICES Jim Peck 2400 Boardwalk Drive Mesquite, TX 75181 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Peck: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, C Suza Taylor CIP Coordinator Enclosure 255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COFFELL X A s 1 8 April 14, 2003 COMCAST Kevin Mullaney, Construction Supervisor 1565 Chenault Street Dallas, TX 75228 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Mullaney: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, �nTCb (lob Suza .Taylor CIP ordinator Enclosure 255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COFFE T f :. yam ,✓ ' ...� �•y,t O X A s t 8 April 14, 2003 COSERV Brian Tomlinson 7701 S Stemmons Corinth, TX 75065 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Tomlinson: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, 15 TNT Suz . Taylor CIP Coordinator Enclosure 255 PARKWAY * P. 0 . BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COPPELL A a 1 April 14, 2003 EXPLORER PIPELINE Patrick Nwakoby 6846 S Canton Tulsa, OK 74136 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Nwakoby: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, Suz . Taylor CIP crdinator Enclosure 255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COFFELL F � q X A b t 8 April 14, 2003 METROMEDIA FIBER NETWORK Tommy Capps 5080 Spectrum Drive, Suite 80OW Addison, TX 75001 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Capps: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, Suz . Taylor CIP ordinator Enclosure 255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T Y O F COFFELL r F �. a o April 14, 2003 ONCOR Doug Brewer, Project Mgmt. 4200 N. Belt Line Road Irving, TX 75038 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Brewer: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, - raL Suz Taylor CIP Coordinator Enclosure 255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E G I T Y O F COPPELL April 14, 2003 OnFIBER CARRIER SERVICE Tim Norris, Operations Mgr. 1820 N Glenville Drive, Suite 114 Richardson, TX 75081 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Norris: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 -304 -7019. Sincerely, Tcgl ' Suz . Taylor CIP Coordinator Enclosure 255 PARKWAY * P. O.BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C I T Y O F COPPELL _ lo r T April 14, 2003 QWEST COMMUNICATIONS Paul Gonzales, Relocation Mgr. 1860 Lincoln Street, Suite 200 Denver, CO 80295 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Gonzales: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, Suz . Taylor CIP Coordinator Enclosure 255 PARKWAY * P. O.BOX 478 * CORRELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673 T H E C 1 T V O F COPPELL April 14, 2003 SBC Peter Russell 3 Bell Plaza, Room 2124 308 S Akard St Dallas, TX 75202 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Russell: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, d T "lov SuzA. Taylor CIP Coordinator Enclosure 255 PARKWAY * P.O. BOX 476 * COPPELL TX 75019 * TEL 9721462 0022 * FAX 972/304 3673 T H E C I T Y O F COPPEL F - Y_ �IYf� '9111" 4 O X A S t 8 April 14, 2003 TXU Communication Services Mark Wilson 115 W Seventh St. Suite 308 Fort Worth, TX 76102 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Wilson: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, Suz .Taylor CIP Coordinator Enclosure 255 PARKWAY * PO BOX 478 * COPPELL T% 75019 * TEL 9721462 0022 * FAX 972/304 3673 T H E C I T Y O F April 14, 2003 VERIZON COMMUNICATIONS Bob Holland 2094 McGee Lane Lewisville, TX 75077 COPPELL X A X 1 8 RE: Deforest Road Lift Station Improvements Force Main Lines A & B Project # SS 99 -01 Dear Mr. Holland: Enclosed are preliminary construction plans for Force Main Lines A & B. The project consists of the installation of 4697 L.F. of 20 -inch and 810 L.F. of 30 -inch force main. The majority of the force main will be constructed in the median of MacArthur Boulevard. The City is reviewing two alternate construction methods for the installation of the force main: open cut and directional drilling. The directional drilling will avoid many of the potential utility conflicts. Please review the enclosed set of plans to determine if you have any utilities within the project limits, and provide me with any comments that you may have. Also, please comment as to any precautions that should be taken to protect your utilities. Your consideration of this matter is appreciated. Should you have any questions or need any additional information, please feel free to contact me at 972 - 304 -7019. Sincerely, 6 cw T" Suza Taylor CIP Coordinator Enclosure 255 PARKWAY * P.O. BOX 478 * COPPELL TX 75019 * TEL 972/462 0022 * FAX 972/304 3673