MEMORANDUM
To:
Ken Griffin, P.E., Suzan Taylor
Jay Volk, P.E.
April 9, 2003
West Sandy Lake Road Project
From:
Date:
Re:
The following is a suggested agenda for our meeting on Tuesday, April 15, 2003 at 10:00 in
your offices. The items below represent issues that we would like to resolve as we continue
with preliminary plans.
I. City review comments needing clarification
A. Sheet 10 - transition ratellane drops (written)
B. Sheet 11 - what about 70 foot right-of-way? (written)
C. Sheet 27 - proposed right-of-way on north side of road at Station 91+00 to
92+00 - replat as current - may not be the best solution (written)
D. Sheet 31 - 10' bike path is circled with a question mark (mark-up)
II. Revised intersection/transition layouts
A. Coppell Road North
i. Curb Radii
ii. Crosswalks
B. Coppell Road South
i. Crosswalks
ii. Islands
C. Freeport (Transition from future 6-lane to 4-lane)
III. Confirm superelevation/design speed
A. Coppell Road North
B. Coppell Road South
IV. Access to Ferguson Realty tract to complete topographic survey for storm drain
outfall at Station 18+38
V. Existing retaining wall between Coppell Road North and Sricknell
A. Mitigation of possible surcharge
B. Parkways and slopes
C. Impact on Phase IIPhase II transition point
Page' 012
VI. Signal at Whispering Hills
VII. Right-of-way acquisition
A. Bridge
B. Oakbend Addition
VIII. Landscape Issues
A. Intersection enhancements
B. Design Concept change
C. New City standards/criteria
D. Plans for project under construction
IX. Set a date to discuss the following issues with NJB/Parks Department
A. Extension of trail to Freeport Parkway
B. Location/alignment
C. Width of trail
D. Confirm whether trail can be in open space/HOA lots