Loading...
ST9902-CS030409 ST qq.o') :I it..,._ Teague Nail and Perkins ENGINEERS ~ SURVEYORS' CONSULTANTS 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX MEMORANDUM To: Ken Griffin, P.E., Suzan Taylor Jay Volk, P.E. April 9, 2003 West Sandy Lake Road Project From: Date: Re: The following is a suggested agenda for our meeting on Tuesday, April 15, 2003 at 10:00 in your offices. The items below represent issues that we would like to resolve as we continue with preliminary plans. I. City review comments needing clarification A. Sheet 10 - transition ratellane drops (written) B. Sheet 11 - what about 70 foot right-of-way? (written) C. Sheet 27 - proposed right-of-way on north side of road at Station 91+00 to 92+00 - replat as current - may not be the best solution (written) D. Sheet 31 - 10' bike path is circled with a question mark (mark-up) II. Revised intersection/transition layouts A. Coppell Road North i. Curb Radii ii. Crosswalks B. Coppell Road South i. Crosswalks ii. Islands C. Freeport (Transition from future 6-lane to 4-lane) III. Confirm superelevation/design speed A. Coppell Road North B. Coppell Road South IV. Access to Ferguson Realty tract to complete topographic survey for storm drain outfall at Station 18+38 V. Existing retaining wall between Coppell Road North and Sricknell A. Mitigation of possible surcharge B. Parkways and slopes C. Impact on Phase IIPhase II transition point Page' 012 VI. Signal at Whispering Hills VII. Right-of-way acquisition A. Bridge B. Oakbend Addition VIII. Landscape Issues A. Intersection enhancements B. Design Concept change C. New City standards/criteria D. Plans for project under construction IX. Set a date to discuss the following issues with NJB/Parks Department A. Extension of trail to Freeport Parkway B. Location/alignment C. Width of trail D. Confirm whether trail can be in open space/HOA lots Page 2 of 2