Loading...
TexasBank-CS030417CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT P & Z HEARING DATE C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA: CURRENT ZONING REQUEST: APPLICANT: HISTORY: CASE: TexasBank ADDITION SITE PLAN April 17, 2003 May 13, 2003 Marcie Diamond, Assistant Planning Director Northeast corner of Vanbebber and S. Denton Tap Road. 1.74 acres of property. C (Commercial) Site Plan approval to allow the construction of a one -story, 6,700 square -foot bank facility plus a 2,200 square -foot office. Applicant: Tom Purvis TexasBank 2222 W. Exchange St, Ste 205 Fort Worth, Texas 76106 (817) 624 -7266 (817) 738 -1449 Engineer: Todd Blackwell Dunaway Associates, Inc. 1501 Merrimac Cir, Ste 100 Fort Worth, Texas 76107 (817) 335 -1121 (817) 335 -7437 There has been no zoning or platting activity on this property. Item # 6 Page 1 of 4 TRANSPORTATION: Denton Tap Road is a six -lane divided roadway, within 100' of right -of -way. SURROUNDING LAND USE & ZONING: North - Undeveloped; C (Commercial) South -Gas Station/convenience store and Day Care; C (Commercial) East - Braewood West subdivision; SF -7 (Single Family -7) West - Undeveloped; O (Office) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for mixed use development. DISCUSSION: TexasBank desires to construct a 8,900 square -foot facility at this location, 6,700 - square feet will be devoted to banking and the remaining 2,200 - square feet will be office space for lease. There will be seven drive- through lanes at the rear of the building, which will not be visible from Denton Tap Road. Access will be provided to this site by a driveway on Denton Tap and one on Vanbebber. The driveway on Denton Tap has been designed to be a mutual access driveway connecting this property with the property to the north. The northern portion of this mutual driveway will ultimately be provided during the platting process as an easement. However, until that time staff requests a letter from the property owner granting permission to construct the mutual access /fire lane. Provisions have also been made to allow for the future extension of a mutual driveway parallel to Denton Tap, when deemed necessary in the future. This proposed bank will abut a single - family subdivision to the east; therefore, the plans include a 6 -foot masonry screening wall in the same materials as the main building along the east property line. The same wall will be utilized to screen the dumpster on the property. Staff is recommending that the instead of utilizing the off -white stone for the screening wall, that a standard redbrick wall, similar to that used for the to buffer the retail uses from the residential to the north of this property be used. As the remaining properties develop within this retail area this will result in a consistent wall adjacent to the residential. The site plan is generally in compliance with all regulations of the Zoning Ordinance, except for two. First, the parking row adjacent to the building, parallel to Denton Tap Road, has 17 parking spaces without a landscaped island and a required tree. There is a break in the parking row to provide a walkway into the main doorway; however, per Section 12- 34 -8(B)3 of the Zoning Ordinance, a landscaped island is required. The parking exceeds the parking required for office (30 spaces) by 22 parking spaces; therefore, compliance can be achieved without violating the code. Item #f 6 Page 2 of 4 The second issue relates to the use of metal canopies over the windows. The facade of the building will have an off -white stone veneer, with cast stone accents and a dark brown, standing seam metal roof. The applicant desires to include metal canopies over the windows along Denton Tap with the same color metal. However, Sec. 12 -23 -5 of the Zoning Ordinance requires the following: "Awnings are limited to canvas, or a lusterless, non -metal material that closely resembles canvas, at least 98 percent of which is a single deep or neutral solid color ". Staff recommends adherence to this provision of the ordinance. Canvas or a similar material will give the building a softer appearance in contrast to the stone veneer. If the applicant desires to retain the metal awnings, an appeal will have to be made to the Board of Adjustment. However, a hardship will have to be demonstrated. The landscaping is generally in compliance with the Ordinance, whereas 31% of the site is devoted to landscaping. The only exception is an additional tree /island in the parking row adjacent to the Denton Tap, as discussed above. The comer of Denton Tap and Vanbebber will be enhanced with ground cover, shrubs and ornamental trees, and Cedar Elms will be the predominate perimeter tree. Oaks and Chinese Pistache trees will fulfill the requirements for overstory trees internal to the site. The applicant has made substantial modifications to their prototypical sign package to be compliant with the City of Coppell sign standards. TexasBank will be in black channel letters and their red and blue logo will not exceed 20% of the area of the sign. Even their directional signage required modifications to be in compliance with our Ordinances. The monument sign which was originally a brightly colored can sign has been modified to be a 24 square -foot stone sign with the words "TexasBank" and their logo, which is in compliance with the sign regulation. However, the word 'pulse" is included under TexasBank, which is in conflict with Section 12- 29- 4.2.(A) of the Zoning Ordinance which in part states: A monument sign shall contain only the name, logo, address, product or service of the establishment...... This regulation has been consistently been interpreted so as not to not allow for additional verbiage on monument signs, and therefore the word "pulse" needs to be removed from the monument sign. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of the TexasBank Site Plan, subject to the following conditions: 1) The addition of a landscaped island with an overstory tree in the parking row adjacent to the building, parallel to Denton Tap Road. Item N 6 Page 3 of 4 2) Revision to the materials of the proposed screening wall along the east property line from off -white stone to red brick, similar to the existing wall north of this property. 3) Revision of the canopies over the windows to be compliant with Sec. 12 -23 -5 of the Zoning Ordinance. 4) Submission of a letter from the property owner to the north granting permission to construct the mutual access /fire lane. 5) Deleting the word `pulse" from the monument sign. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request 4) Take under advisement for reconsideration at a later date. ATTACHMENTS: 1) Site Plan 2) Landscape Plan 3) Elevations 4) Sign Package Item # 6 Page 4 of 4 CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE: TexasBank ADDITION, LOTS 1 &2, BLOCK A MINOR PLAT P & Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA CURRENT ZONING: REQUEST: APPLICANT: HISTORY: April 17, 2003 May 13, 2003 Marcie Diamond, Assistant Planning Director Northeast corner of Vanbebber and S. Denton Tap Road. Lot 1: 1.74 acres of property. Lot 2: 3.61 acres of property (future development) C (Commercial) Minor Plat approval to allow the construction of a one -story, 6,700 square -foot bank facility plus a 2,200 square -foot office. Applicant: Tom Purvis Engineer: Todd Blackwell TexasBank 2222 W. Exchange St, Ste 205 Fort Worth, Texas 76106 817.624.7266 817.738.1449 Dunaway Associates, Inc. 1501 Merrimac Cir, Ste 100 Fort Worth, Texas 76107 817.335.1121 817.335.7437 There has been no zoning or platting activity on this property. Item # 7 Page 1 of 2 TRANSPORTATION: Denton Tap Road is a six -lane divided roadway, within 100' of right -of -way. SURROUNDING LAND USE & ZONING: North- Undeveloped; C (Commercial) South - Gas Station/convenience store and Day Care; C (Commercial) East - Braewood West subdivision; SF -7 (Single Family -7) West - Undeveloped; O (Office) COMPREHENSIVE PLAN: The Comprehensive Plan shows the property as suitable for mixed use development. DISCUSSION: This is the companion case to the Site Plan approval for TexasBank. This request is to plat two lots. Lot 1 will accommodate the bank/office, and Lot 2 will be reserved for future development. This plat provides for all necessary easements for utilities, sidewalks and fire lane /mutual access driveways as needed for the development of Lot 1. Lot 2, at this time contains several existing easements, as well as the provision of the northern portion of the mutual access /fire lane easement serving the driveway on Denton Tap Road. Prior to the development of Lot 2, this lot will have to be replatted to provide necessary easements and fire lanes to serve that development. Staff is recommending that a note to this effect be placed on the plat. The only deficiency on this plat is the lack of the City Secretary's Signature Block, which needs to be included. RECOMMENDATION TO THE PLANNING AND ZONING COMMISSION: Staff recommends APPROVAL of the Minor Plat for Lots 1 and 2, Block A of the TexasBank Addition subject to the following conditions: 1) Inclusion of a note stating that "Prior to the development of Lot 2, Lot 2 shall be replatted." 2) Inclusion of the City Secretary's Signature Block. ALTERNATIVES: 1) Recommend approval of the request. 2) Recommend disapproval of the request 3) Recommend modification of the request ATTACHMENTS: 1) Minor Plat Item # 7 Page 2 of 2