MacPlaza 1 Sun-CS 970324COPPELL ENGINEERING
UTII.ITIES DIVISION
MEMORANDUM
DATE: Mazch 24, 1997
TO: Garreth Campbell
FROM: Larry Smith, Utilities Department
RE: Walk thru for Sunbelt Storage
Awalk-thru on the above referenced project was conducted on March 24. 1997
and the items below were found to be deficient.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/dg
COPPELL ENGINEERING
UTILTTIES DIVISION
MEMORANDUM
DATE: March 31, 1997
TO: Garreth Campbell
FROM: Larry Smith, Utilities
RE: Walk thru for Sunbelt Utility
A walk-thru on the above referenced project was conducted on Mazch 31. 1997
and the items below were found to be deficient.
1. Everything is OK.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC/dg