Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MacPlaza 1 Sun-LR 961001
"Excel.!,ence by Experience" CONSULTTNG ENG'rNEERS TN= Envi ronmenta[ Assessments Soils & Foundations Construction Nateria[s Testing Commercial. & Industrial Inspection PO Box 92548 · Southl.ake, Texas 76092 · (817) 329-0281 FIELD COMPACTION REPORT PROJECT: Sunbelt Self Storage JOE #: 96-1672 DATE: 10-01-96 CLIENT: Sunbelt Selt Storage c/o Gra-Son Land, Inc LOCATION: Coppell DAY: Tuesday TIME: 10:30am CONTRACTOR: Kamont Construction TEST NO. LOCATION AND LIFT WATER DRY PER- PROCTOR CONT. DEN CENT NUMBER (%) (PCF) COMP 8" Water Line: 1. @ SE quad of W loop 2. @ NE quad 3. @ N end of loop 4. @ NW quad 5. @ SW quad of loop 6. @ S end of loop Line A-i, 24" Storm Sewer: 7. @ Station 0+50 Line A-2, 24" Storm Sewer: 8. @ Station 1+00 FG FG FG FG FG FG FG FG 1 19.3 1 20.0 1 19.9 1 20.6 1 18.9 1 19.6 107 6 108 1 107 1 106 2 107 1 106 3 99.0 99.4 98.5 97.7 98.5 97.8 1 20.1 106.2 97.7 1 20.3 105.9 97.4 REMARKS: Ail tests passed. Minimum Compaction Required: FG = Final Grade 95% PROCTORS: 1. Tn & Brn Silty Sandy Clay 2. Dk Brn Silty Sandy Clay 108.7 PCF @ 18.3% MOISTURE 99.2 PCF @ 23.7% MOISTURE Chris Quentin Technician