Loading...
PA9702-LR 990729CONCRETE COMPRESS IVE STRENGTH TEST TH HBC ENGINEERING, INC. 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Dateof Service: 07/20/1999 Report No.: 9919635 Report Date 07/2911999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~3~id 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btain samp~es of fresh concrete at the p~acement ~ocations~ perform required ~e~d test and cast compressive strength samples. PROJECT DATA CONTnACTOn: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers pLACEMENT DATE: 07/20/1999 BATCH TIME: N/A r~Awr: N/A TE~E SAMPLED: 5:24am BY: Mario Garcia SPECIFICATION REQUIREMENTS WEATHER CONDmOSS: Night time w[ light breeze STRENGTH: 4000 psi @ 28 Days TEMPERATURE (v) - Am 74 F CONCRETE: 86 F SLUMP: 4-6" TRUCK NO: 1 lg TICKET NO: 75241 Am: 3-6% AmCONTENT(~): N/A UNrrwEIGffr(vcf): N/A TEST METHOD: ASTM C-143 pLACEMENT LOCATION: West half of pavement of parking lot ASTM C-172 ASTM C-39 SAMPLE LOCATION: West comer ,15' W & 6' N REPORT OF TESTS ACCUMULATIVE yARDS: 90 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE I I 7.50 07/27/1999 7 118940 4210 1 2 7.50 07/2711999 7 127780 4520 Avenge 4370 1 3 7.50 08/17/1999 28 1 4 7.50 0811711999 28 Sample taken from end of hose of pump. This repoa is exclusively for die USe of die client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. OILL Page 1 of 2 % ONCRETE COMPRE r IVE STRENGTH TES 8901 Carpenter Frwy., Suite #100 DaHa~ TH 75247 Date of Service: 07/20/1999 Report No.: 9919635 Report Date 07/29/1999 Client No.: COPPl~J.l. Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr 732 DeForest 300 Block of Parkway Blvd Coppell TX 75019 Coppell, Texas/Prj. 4~96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACtOr: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE stwPLmm Nelson Brothers PLACEMENT DATE: 07/20/1999 BATCH TnV~: N/A n. ARr: N/A TnVtESA~WLED: 7:00am BY: Mario Garcia SPECIFICATION REQUIREMENT8 WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEMeERATURE 0q- An 75 F CONCRETE: 86 F SLUMP: 4-6" TRUCK NO: 218 TICKET NO: N/A A!P~ 3-6% Am CONTEST (~): N/A urcrr VaCmHT (pet): N/A TEST METHOB: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: South comer, 30' W & 9' North REPORT OF TESTS ACCumn_ATB, E YARNS: 190 CYLINDER MEASURED MAXIMUM COMPRESSlYE MARICED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs, force) (psi) TYPE 2 I 6.00 07/2711999 7 88540 3130 2 2 6.00 07/27/1999 7 83600 2960 Average 3050 2 3 6.00 08/17/1999 28 2 4 6.00 08/17/1999 28 Slump taken from out of hose of pump. Teehnkian: Mario Garcia Started: 3:00am Finished: 8:00am ~ ~c Report Distribution: ' (1) City of CoppeH (1) City ofCoppell - Engineering (1) Brinkky Sargent Atchiteas (1) City ofCoppall - Bldg. lnsp. Eugene Harbour (1) Tuner Engineers (1) City of Coppell - Leisure Scrv Dept Vice President (1) Hisaw & Associates This rcpoa is exclusively for the use of she client indicated above and shall not be reproduced except in full without She written approval of HBC Engineering, Inc. 01LL Page 2 of 2