Freeport NIP(7.0)-LR030423 8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 175013
Project No.: 037333
Date of Service: 04/16/2003
Report Date: 04/23/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
Test Methods: ASTM D-2922
ASTM D-3017
Standard Counts
Density
Current: 3075
Previous: 3081
Gauge: Troxler 3430 Moisture
Gauge Serial No: 32720 Current: 667
Test Mode: DT Previous: 655
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Tarmish Brown Sandy Clay (Lime Treated)
22.0 100.0 Optimum + 9Y- 100 min
FIELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) OeO OeO (%max)
Lime Subgrade
1 Building pad, 900' East by 100' North of 6" 1 22.7 118.0 96.2 96
southwest comer, final
Lime Subgrade
2 Building pad, 900' East by 200' North of 6" 1 23.5 119.4 96.7 97
southwest comer, final
Lime Subgrade
3 Building pad, 900' East by 300' North of 6" 1 24.2 118.6 95.5 96
southwest comer, final
Lime Subgrade
4 Building pad, 900' East by 400' North of 6" 1 22.3 116.4 95.2 95
southwest comer, final
Lime Subgrade
5 Building pad, 900' East by 500' North of 6" 1 25.1 121.8 97.4 97
southwest comer, final
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 2
Report No.: 175013 RoneEngineers
Project No.: 037333
Client: Duke Realty Services, LP
Technician Time:
Technician: Larmy Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineem
Test results on this repo~ meet pr~ect specification.
6:30 a.m. - 2:30 p.m. and
3:00 p.m. - 6:30 p.m.
Started: Finished:
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2
RoneEngineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houstoo, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Arm: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport I 0
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 174820
Project No.: 037333
Date of Service: 04/14/2003
Report Date: 04/23/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
Test Methods: ASTM D-2922
ASTM D-3017
Standard Counts
Density
Current: 3081
Previous: 3084
Gauge: Troxler 3430 Moisture
Gauge Serial No: 32720 Current: 655
Test Mode: DT
Previous: 653
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Tannish Brown Sandy Clay (Lime Treated)
22.0 100.0 Optimum + 95 rain
FIELD DENSITY TESTS
TEST
NO TEST LOCATION
PROBE MfD MOISTURE WET DENSITY DRY DENSITY DENSITY
DEPTH No. (%) (pcf) (pet') (% max)
Lime Subgrade
1 Building pad, 800' East by 100' North of 6" 1 23.3 118.2 95.9 96
southwest comer, final
Lime Subgrade
2 Building pad, 800' East by 200' North of 6" 1 23.7 118.9 96.1 96
southwest corner, final
Lime Subgrade
3 Building pad, 800' East by 300' North of 6" 1 24.1 118.0 95.1 95
southwest comer, final
Lime Subgrade
4 Building pad, 800' East by 400' North of 6" 1 22.0 115.9 95.0 95
southwest comer, final
Lime Subgrade
5 Building pad, 850' East by 500' North of 6" I 24.8 120.4 96.5 97
southwest comer, final
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
are addressed and shall not be
reports are for the exclusive use of the clients to whom they reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page
1
of
2
Report No.: 174820
Project No.: 037333
Client: Duke Realty Services, LP
RoneEngineers
TEST
NO
TEST LOCATION
PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
DEPTH No. (%) (pcf) (pc0 (% max)
Lime Subgrade
6 Building pad, 850' East by 400' North of
southwest corner, final
Lime Subgrade
7 Building pad, 850' East by 300' North of
southwest corner, final
Lime Subgrade
8 Building pad, 850' East by 200' North of
southwest corner, final
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheeo Koch Consulting Engineers
6" 1 25.0 118.9 95.1 95
6" 1 23.2 119.5 97.0 97
6" 1 23.5 121.4 98.3 98
Test results on this report meet project specification.
Finished: l:30pm
Started: 6:30am
(1) Engineering Analyst
(1) City of Coppefi Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2
glneers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 175196
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/23/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 7
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(I) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
6:30 a.m.
- 5:30 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175196
Project No.: 037333
Project: Freeport I0 Date of Service: 4/18/2003
500 Freeport Parkway Page 2 of 7
Driller: Liberty Drilling
Pier Identification P-3 Q-3 R-3 S-3 T-3
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth o£Pier Prior to Underreaming (ft) 11.30 10.80 10.90 11.70 11.70
Depth of Pier After Underreaming (f0* 11.70 10.80 11.10 12.00 11.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 10.8 9.9 10.2 11.0 11.0
Time Drilling was Completed (am / pm) 8:17 AM 9:05 AM 9:01 AM 9:25 AM 9:39 AM
Time Concrete was Placed (am / pm) 11:50 AM 12:04 PM 12:11 PM 12:20 PM 12:26 PM
Depth of Pier From Top of Concrete (ft) 11.20 10.40 10.70 I 1.50 11.30
Elevation: Surface (fi)** 99.50 99.40 99.40 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (fi)** 87.80 88.60 88.30 87.50 87.70
Bearing Stratum (description) Tan and Gray Sandy Clay
Note: See report #175197 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
P-3, P-4, P-5 and P-6 are section 2, balance of piers this date are for section 3.
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surfact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided f(~r testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175196
Project No.: 037333
Project: Freeport 10 Date of Service: 4/18/2003
500 Freeport Parkway Page 3 of 7
Driller: Liberty Drilling
Pier Identification U-3 V-3 V-4 U-4 T-4
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 11.80 11.80 11.80 11.80 11.70
Depth of Pier After Underreaming (fi)* 12.00 11.80 11.90 11.80 11.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ' 6/#6
Length of Reinforcing Steel (ft) 11.0 10.9 11.0 11.0 11.0
Time Drilling was Completed (am / pm) 9:51 AM 9:58 AM 10:13 AM 10:33 AM 10:41 AM
Time Concrete was Placed (am / pm) 12:33 PM 12:40 PM 12:46 PM 12:52 PM 12:58 PM
!Depth of Pier From Top of Concrete (ft) 8.50 8.30 8.50 8.30 8.40
Elevation: Surface (ft)** 99.50 99.50 99.40 99.50 99.40
Elevation: Top of Pier (ft)** 96.00 96.00 96.00 96.00 96.00
Elevation: Bottom of Pier (ft)** 87.50 87.70 87.50 87.70 87.60
Bearing Stratum (description) Tan and Gray Sandy Clay
Note: See report #175197 for Compressive Strength Test Specimens.
* Additional P~netration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surfact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175196
Project No.: 037333
Project: Freeport 10 Date of Service: 4/18/2003
500 Freeport Parkway Page 4 of 7
Driller: Liberty Drilling
:Pier Identification S-4 R-4 Q-4 P-4 P-5
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.10 12.00 11.80 11.60 11.70
Depth of Pier After Underreaming (ft)* 12.10 12.00 12.40 11.60 12.20
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.2 11.0 11.5 10.7 11.4
Time Drilling was Completed (am / pm) 10:59 AM II:07AM I:12PM 11:32 AM 11:58 AM
Time Concrete was Placed (am / pm) 1:06 PM 2:55 PM 3:01 PM 3:07 PM 3:14 PM
Depth of Pier From Top of Concrete (ft) 11.60 11.50 12.00 11.10 11.70
Elevation: Surface (ft)** 99.50 99.50 99.40 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (f~)** 87.40 87.50 87.00 87.90 87.30
Beating Stratum (description) Tan and Gray Sandy Clay
Note: See report #175197 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing suffact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
:lualtiy (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175196
Project No.: 037333
Project: Freeport 10 Date of Service: 4/18/2003
500 Freeport Parkway Page 5 of 7
Driller: Liberty Drilling
Pier Identification Q-5 R-5 S-5 T-5 U-5
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 11.90 11.70 12.20 11.90 11.70
Depth of Pier After Underreaming (ft)* 12.10 11.70 12.40 12.50 12.40
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
:Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.2 10.9 11.5 11.5 11.5
Time Drilling was Completed (am / pm) 12:54 PM 1:21 PM 1:35 PM 1:51 PM 1:57 PM
Time Concrete was Placed (am / pm) 3:20 PM 3:25 PM 3:29 PM 3:34 PM 3:40 PM
Depth of Pier From Top of Concrete (ft) 11.70 11.20 11.90 12.00 12.00
Elevation: Surface (ft)** 99.40 99.50 99.50 99.50 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 87.30 87.80 87.10 87.00 87.00
Bearing Stratum (description) Tan and Gray Sandy Clay
Note: See report #175197 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surfact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175196
Project No.: 037333
Project: Freeport 10 Date of Service: 4/18/2003
500 Freeport Parkway Page 6 of 7
~riller: Liberty Drilling
Pier Identification V-5 V-6 U-6 T-6 S-6
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 11.70 11.70 12.30 12.30 12.20
Depth of Pier After Underreaming (ft)* 11.80 11.80 12.80 12.50 12.40
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinfoming Steel (ft) 10.9 11.0 11.7 11.6 11.5
Time Drilling was Completed (am / pm) 2:13 PM 2:36 PM 2:07 PM 2:30 PM 2:44 PM
Time Concrete was Placed (am /pm) 3:25 PM 3:31 PM 3:38 PM 3:42 PM 3:47 PM
Depth of Pier From Top of Concrete (ft) 11.40 11.30 12.30 12.10 12.00
Elevation: Surface (ft)** 99.40 99.50 99.50 99.40 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 87.60 87.70 86.70 86.90 87.00
Bearing Stratum (description) Tan and Gray Sandy Clay
Note: See report # 175197 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing sm'fact elevation.
LIMfTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Repo~t No.: 175196
Project No.: 037333
Project: Freeport 10 Date o£Service: 4/18/2003
500 Freeport Parkway Page 7 of 7
Driller: Liberty Drilling
Pier Identification R-6 Q-6 P-6
Pier Diameter (in) 24 24 24
Bell Diameter (in) 66 66 66
~Required Minimum Depth (ft) 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.00 11.70 11.00
Depth of Pier After Underreaming (12)* 12.50 12.30 11.20
Condition of Bottom (wet / dry) Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA
Number of Bars / Reinforcing Bar Size (#), 6/#6 6/#6 6/#6
Length of Reinforcing Steel fit) 11.6 11.4 10.3
Time Drilling was Completed (am / pm) 3:12 PM 3:03 PM 3:10 PM
Time Concrete was Placed (am / pm) 3:54 PM 4:13 PM 4:20 PM
Depth of Pier From Top of Concrete (ft) 12.10 11.80 10.80
Elevation: Surface (ft)** 99.40 99.50 99.40
Elevation: Top of Pier fit)** 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.90 87.20 88.20
Bearing Stratum (description) Tan and Gray Sandy Clay
Note: See report #175197 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing suffact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subiect m
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214} 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 175014
Project No.: 037333
Date of Service: 04/16/2003
Report Date: 04/23/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 5
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(I) Pacheco Koch Consulting Engineers
6:30 a.m. - 4:15 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa£e 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175014
Project No.: 037333
Project: Freeport 10 Date of Service: 4/16/2003
500 Freeport Parkway Page 2 of 5
Driller: Liberty
Pier Identification N-11 M-11 L-11 K-11 J-11
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 11.20 10.00 10.90 10.40 10.30
Depth of Pier After Underreaminl~ (ft)* 11.50 10.50 11.00 11.10 10.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (It) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (it) 10.6 9.5 10.0 10.0 9.4
Time Drilling was Completed (am / pm) 8:30 AM 8:48 AM 9:06 AM 10:00 AM 10:22 AM
Time Concrete was Placed (am / pm) 11:18 AM 11:33 AM 11:48 AM 12:00 PM 12:09 PM
Depth of Pier From Top of Concrete (it) 11.10 10.00 10.60 10.60 9.80
Elevation: Surface (it)** 99.40 99.50 99.40 99.50 99.50
Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 87.90 89.00 88.40 88.40 89.20
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175015 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12~ minimum depth or top of sand, whichever is first.
Section 5
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no respansibility for variation in
:luality (nomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175014
Project No.: 037333
Project: Freeport 10 Date of Service: 4/16/2003
500 Freeport Parkway Page 3 of 5
Driller: Liberty
Pier Identification H-11 G-11 F-11 E-11 D-11
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (f~) 10.90 10.30 10.90 10.70 10.70
Depth of Pier After Underreaming (ft)* 11.00 10.40 11.10 11.10 10.70
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
!Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (f0 10.0 9.5 10.0 10.0 9.9
Time Drilling was Completed (am / pm) 10:41 AM 11:05 AM 11:21 AM 11:37 AM 12:01 PM
Time Concrete was Placed (am / pm) 12:15 PM 12:40 PM 12:47 PM 12:56 PM 1:20 PM
Depth of Pier From Top of Concrete (ft) 10.50 10.00 10.60 10.60 10.30
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40
Elevation: Top of Pier (f~)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88.50 89.00 88.40 88.40 88.70
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report # 175015 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first.
Section 5
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top &pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test .suits presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175014
Project No.: 037333
Project: Freeport 10 Date of Service: 4/16/2003
500 Freeport Parkway Page 4 of 5
Driller: Liberty
Pier Identification D- 12 E- 12 F- 12 G- 12 H- 12
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (It) 10.30 11.00 11.20 10.60 10.90
Depth of Pier After Underreaming (it)* 10.50 11.20 11.50 10.80 11.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 9.5 10.4 10.7 9.9 10.4
Time Drilling was Completed (am / pm) 12:51 PM 1:05 PM 1:29 PM 1:03 PM 1:32 PM
Time Concrete was Placed (am / pm) 1:28 PM 1:34 PM 2:00 PM 2:09 PM 2:17 PM
Depth of Pier From Top of Concrete (f0 10.00 10.80 11.00 10.40 10.90
Elevation: Surface (it)** 99.50 99.40 99.50 99.40 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 89.00 88.20 88.00 88.60 88.10
Bearing Stratum (description) Tan & Gray Sandy Clay
INote: See report #175015 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first.
Section 5
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete Yom existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vadafion in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175014
Project No.: 037333
Project: Freeport 10 Date of Service: 4/16/2003
500 Freeport Parkway Page 5 of 5
Driller: Liberty .,
Pier Identification J- 12 K- 12 L- 12 M- 12 N- 12
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 ~66 66'
Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 11.10 10.40 10.90 11.50 10.50
Depth of Pier After Underreaming (f0* 11.50 10.70 10.90 12.00 10.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA. NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 10.5 9.9 10.0 11.0 9.9
Time Drilling was Completed (am / pm) 1:52 PM 2:12 PM 2:35 PM 2:00 PM 2:30 PM
Time Concrete was Placed (am / pm) 2:40 PM 2:50 PM 3:02 PM 3:10 PM 3:30 PM
Depth of Pier From Top of Concrete (fi) 11.00 10.30 10.40 11.50 10.40
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88.00 88.70 88.60 87.50 88.60
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175015 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first.
Section 5
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete fi.om existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject rn
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 174916
Project No.: 037333
Date of Service: 04/15/2003
Report Date: 04/23/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 5
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Paeheeo Koch Consulting Engineers
6:30 a.m. - 4:15 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174916
Project No.: 037333
Project: Freeport 10 Date of Service: 4/15/2003
500 Freeport Parkway Page 2 of 5
Driller: Liberty
Pier Identification N-9 M-9 L-9. K-9 J-9
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (It) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 11.50 10.50 10.50 10.40 10.60
Depth of Pier After Underreaming (ft)* 12.00 11.00 10.80 11.00 10.90
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.0 I 0.0 9.9 10.0 9.8
Time Drilling was Completed (am / pm) 8:33 AM 9:02 AM 9:18 AM 9:35 AM 9:51 AM
Time Concrete was Placed (am / pm) 10:20 AM 10:28 AM 11:00 AM 11:06 AM 11:12 AM
Depth of Pier From Top of Concrete (ft) 11.50 10.60 10.20 10.50 10.40
Elevation: Surface (it)** 99.50 99.40 99.60 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (fi)** 87.50 88.40 88.80 88.50 88.60
Bearing Slzatum (description) Tan & Gray Sandy Clay
Note: See report #174918 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, andbottom of
pier elevation data calculated using specified top of pier elevations as show on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
uality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
~)ur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
~one Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174916
Project No.: 037333
Project: Freeport 10 Date of Service: 4/15/2003
500 Freeport Parkway Page 3 of 5
Driller: Liberty
Pier Identification H-9 G-9 F-9 E-9 D-9
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (It) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 10.40 10.20 11.60 10.50 10.30
Depth of Pier After Underreaming (it)* 10.50 10.40 11.90 10.50 10.50
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
?lumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (it) 9.6 9.6 10.8 9.6 9.7
Time Drilling was Completed (am / pm) 10:55 AM 11:15 AM 11:36 AM 11:53 AM 12:50 PM
Time Concrete was Placed (am / pm) 11:20 AM 1:36 PM 1:41 PM 1:49 PM 1:55 PM
Depth of Pier From Top of Concrete (it) 10.20 10.00 11.50 10.10 10.00
Elevation: Surface (It)** 99.30 99.40 99.40 99.40 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99:00 99.00 99.00
Elevation: Bottom of Pier (It)** 88.80 89.00 87.50 88.90 89.00
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #174918 for Compressive Strength Test. Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as show on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174916
Project No.: 037333
Project: Freeport 10 Date of Service: 4/15/2003
500 Freeport Parkway Page 4 of $
Driller: Liberty
Pier Identification D- 10 E- 10 F- 10 G- 10 H- 10
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 10.10 10.60 10.40 10.40 10.70
Depth of Pier After Underreaming (ft)* 10.30 10.60 10.50 10.90 10.70
Condition of Bottom (wet/dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes 'Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 - 6/#6
Length of Reinforcing Steel (ft) 9.4 9.7 9.7 10.0 9.8
Time Drilling was Completed (am / pm) 1:20 PM 1:40 PM 1:37 PM 1:58 PM 2:02 PM
Time Concrete was Placed (am / pm) 2:24 PM 2:30 PM 2:48 PM 2:54 PM 3:00 PM
Depth of Pier From Top of Concrete (ft) 9.90 10.20 10.00 10.40 10.20
Elevation: Surface (it)** 99.40 99.40 99.50 99.50 99.50
Elevation: Top of Pier (~t)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 89.10 88.80 89.00 88.60 88.80
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report # 174918 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as show on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject rn
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174916
Project No.: 037333
Project: Freeport 10 Date of Service: 4/15/2003
500 Freeport Parkway Page 5 of 5
Driller: Liberty
Pier Identification J-10 K- 10 L- 10 M-10 N-10
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 11.00 10.40 11.40 11.50 10.30
Depth of Pier After Underrearning (it)* 11.30 10.70 11.50 11.90 10.60
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (it) 10.5 10.0 10.5 11.0 9.6
Time Drilling was Completed (am / pm) 2:26 PM 2:29 PM 2:53 PM 2:40 PM 3:00 PM
Time Concrete was Placed (am / pm) 3:05 PM 3:11 PM 3:18 PM 3:35 PM 3:40 PM
Depth of Pier From Top of Concrete (it) 10.90 10.40 11.00 11.40 10.10
Elevation: Surface (ft)** 99.40 99.30 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88.10 88.60 88.00 87.60 88.90
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report # 174918 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: * 12' minimum depth or top of sand, whichever is first
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as show on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vadation in
quality (composition, appearance, performance, etc.) or any ether feature of similar subject m
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 174821
Project No.: 037333
Date of Service: 04/14/2003
Report Date: 04/23/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 4
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheeo Koch Consulting Engineers
6:30 a.m. - 3:45 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for vatiation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa.e 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174821
Project No.: 037333
Project: Freeport 10 Date of Service: 4/14/2003
500 Freeport Parkway Page 2 of 4
Driller: Liberty
Pier Identification B-5.5 B-6.3 A.3-5.5 A.3-6.3
Pier Diameter (in) 30 30 30 30
Bell Diameter (in) 84 84 84 84
Required Minimum Depth (It) 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 11.00 11.10 10.60 11.50
Depth of Pier After Underreaming (It)* 11.30 11.40 10.80 11.60
Condition of Bottom (wet / dry) Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 8/#6 8/#6 8/#6 8/#6
Length of Reinforcing Steel (it) 10.4 10.5 9.9 10.5
Time Drilling was Completed (am / pm) 9:11 AM 9:42 AM 10:17 AM 12:49 PM
Time Concrete was Placed (am / pm) 10:32 AM 10:47 AM 11:00 AM 1:28 PM
Depth of Pier From Top of Concrete (it) 10.80 11.00 10.40 11.00
Elevation: Surface (it)** 99.50 99.40 99.40 99.60
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88.20 88.00 88.60 88.00
Bearing Stratum (description) Tan Sandy Clay
Note: See report # 174822 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand, whichever is first
Section 2
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174821
Project No.: 037333
Project: Freeport 10 Date of Service: 4/14/2003
500 Freeport Parkway Page 3 of 4
Driller: Liberty
Pier Identification D-8 E-8 F-8 G-8 H-8
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 10.50 11.90 10.40 10.00 10.20
Depth of Pier After Underreaming (it)* 11.30 12.10 10.60 I0.10 10.20
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (it) 10.5 11.1 9.5 9.0 9.0
Time Drilling was Completed (am / pm) 11:57 AM 12:53 PM 1:21 PM 1:44 PM 1:28 PM
Time Concrete was Placed (am/pm) 12:48 PM 1:16 PM 1:51 PM 2:03 PM 2:18 PM
Depth of Pier From Top of Concrete (it) 10.90 11.60 10.10 9.50 9.70
Elevation: Surface (it)** 99.40 99.50 99.50 99.60 99.50
Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 88.10 87.40 88.90 89.50 89.30
Bearing Stratum (description) Tan Sandy Clay
Note: See report #174822 for C6mpressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand, whichever is first
Section 2
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 174821
Project No.: 037333
Project: Freeport 10 Date of Service: 4/14/2003
500 Freeport Parkway Page 4 of 4
Driller: Liberty
Pier Identification J-8 K-8 L-8 M-8 N-8
Pier Diameter (in) 24 24 24 24 ' 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 10.40 10.70 11.00 I 0.80 11.10
Depth of Pier After Underreaming (ft)* 10.80 11.10 11.20 11.10 11.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 '6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 9.7 10.2 10.2 10.0 10.1
Time Drilling was Completed (am / pm) 2:18 PM 1:55 PM 2:34 PM 2:21 PM 2:47 PM
Time Concrete was Placed (am / pm) 2:40 PM 2:48 PM 3:00 PM 3:05 PM 3:10 PM
Depth of Pier From Top of Concrete (ft) 10.30 10.70 10.70 10.60 10.60
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.50'
Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88.70 88.30 88.30 88.40 88.40
Bearing Stratum (description) Tan Sandy Clay
Note: See report #174822 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12~ minimum depth or top of sand, whichever is first
Section 2
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the spec/fie samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, pen~ormance, etc.) or any other feature of similar subject m
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Drilled Pier Inspection
Report No.: 175101
Project No.: 037333
Date of Service: 04/17/2003
Report Date: 04/23/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time: 6:30 a.m. - 3:30 p.m.
Page 1 of 3
Technician: Arty Nickonov
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no msponsibilily for variation in quality
(composition, appearance, performance, etc.) or any other feaiure of similar subject matter pmvided by persons or conditions over which we have no contml. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page I of 1
RONE ENGINEERS, Ltd.
REPORT O~
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175101
Project No.: 037333
Project: Freeport 10 Date of Service: 4/17/2003
500 Freeport Parkway Page 2 of 3
Driller: Liberty
Pier Identification N- 13 M- 13 L- 13 K- 13 J- 13
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 10.80 10.30 I 1.10 10.60 10.30
Depth of Pier After Underreaming (it)* 11.30 10.80 11.40 10.80 10.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (it) 10.5 9.8 10.6 9.5 9.4
Time Drilling was Completed (am / pm) 8:15 AM 8:50 AM 11:42 AM 11:59 AM 1:41 PM
Time Concrete was Placed (am / pm) 12:54 PM 1:09 PM 1:27 PM 1:49 PM 2:07 PM
Depth of Pier From Top of Concrete (fl) 10.90 10.30 11.00 10.30 9.80
Elevation: Surface (it)** 99.40 99.50 99.40 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 88. I 0 88.70 88.00 88.70 89.20
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175102 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: Section 5/12' minimum depth or top of sand whichever is first
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surfact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175101
Project No.: 037333
Project: Freeport 10 Date of Service: 4/17/2003
500 Freeport Parkway Page 3 of 3
Driller: Liberty
Pier Identification H- 13 G- 13 F- 13 E- 13 D- 13
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 10.40 11.20 11.40 11.30 11.40
Depth of Pier After Underreaming (ft)* 10.70 11.40 I 1.50 11.30 11.60
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Rein£oming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 9.9 10.5 10.5 10.5 10.6
Time Drilling was Completed (am / pm) 12:58 PM 1:16 PM 1:50 PM 1:24 PM 2:07 PM
Time Concrete was Placed (am / pm) 2:19 PM 2:33 PM 2:41 PM 2:56 PM 2:48 PM
Depth of Pier From Top of Concrete (ft) 10.20 11.00 11.00 10.90 11.10
Elevation: Surface (ft)** 99.50 99.40 99.50 99.40 99.50
Elevation: Top of Pier (ft) ** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (f0 ** 88.80 88.00 88.00 88.10 87.90
Bearing Stratum (description) Tan & Sandy Clay
Note: See report # 175102 for Compressive Strength Test Specimens.
*Additional Penetration not requested unless noted.
Remarks: Section 5/12' minimum depth or top of sand whichever is first.
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing suffact elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houstoo, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 175283
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/23/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
Test Methods: ASTM D-2922
ASTM D-3017
Standard Counts
Density
Current: 3090
Previous: 3081
Gauge: Troxler 3430
Moisture
Gauge Serial No: 32720 Current: 659
Test Mode: DT
Pre*ious: 655
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Tarmish Brown Sandy Clay (Lime Treated) 22.0 100.0 Optimum + ~5-100
FlELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
NO. (%) (pcf) (PCO (% max)
Lime Subgrade
1 Building Pad, 950' east by 100' north of 6" 1 22.1 116.1 95.1 95
southwest comer, final
Lime Subgrade
2 Building Pad, 950' east by 200' north of 6" 1 22.5 116.9 95.4 95
southwest comer, final
Lime Subgrade
3 Building Pad, 950' east by 300' north of 6" 1 23.0 120.9 98.3 98
southwest comer, final
Lime Subgrade
4 Building Pad, 950' east by 400' north of 6" 1 22.9 117.7 95.8 96
southwest comer, final
Lime Subgrade
5 Building pad, 1000' east by 500' north of 6" 1 22.4 119.6 97.7 98
southwest comer, final
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of sireilar subject reatter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 2
Report No.: 175283 RoneEngineers
Project No.: 037333 ~ll~
Client: Duke Realty Services, LP
TEST
NO TESTLOCATION
PROBE
DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
NO. (%) (pcf) (pcf) (% max)
Lime Subgrade
6 Building pad, 1000' east by 400' north of 6" 1 24.7 123.2 98.8 99
southwest corner, final
Lime Subgrade
7 Building pad, 1000' east by 300' north of 6" 1 22.9 117.4 95.5 96
southwest comer, fma!
Lime Subgrade
8 Building pad, 1000' east by 200' north of 6" 1 22.0 116.4 95.4 95
southwest comer, final
Test results on this report meet project specification.
Report Distribution: /~/ b(,~.,_~__..~/
(1) Duke Realty Services, LP (1) Engineering Analyst
(1) Duke Realty Services, LP (1) City of Coppell Engineering Dept.
(1) City of Coppell Building Dept.
(I) Pacheco Koch Consulting Engineers
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2