Coppell Comm 1R3-CS030403DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
TEM: Coppell Commerce Center, Lot IlL Block 3, Replat, to allow the construction
of an approximate 106,000 square-foot office/warehouse building on
approximately 7.3 acres of property located at the southeast corner of Burns
and Freeport Parkway, at the request of Brian Jaffee, Jones & Carter, Inc.
Project ID # RP-03-0044
STAFF REP: Marcie Diamond
DRC DATE: March 27, 2003 andApril 3, 2003
CONTACT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681
COMMENT STATUS: ~ ,/FINAL P. EX.~SED
No Commems.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: Coppell Commerce Center~ Lot IRt Block 3~ Site Plan, to allow the
construction of an approximate 106,000 square-foot office/warehouse
building on approximately 7.3 acres of property located at the southeast
corner of Burns and Freeport Parkway, at the request of John Taylor,
Azimuth Architecture, Inc. Project ID # SPA-03-0043
STAFF REP: Marcie Diamond
DRC DATE: March 27, 2003 and.4pril 3, 2003
CONTA CT: Teresa M. Turner, E.I.T., Graduate Engineer (972)304-3681
COMMENT STATUS: ~ ./FINAL P.E~.~£ED
While sidewalks are not required at this time, ADA ramps must be constructed at the driveways
and street intersections.