Andrew:
Please see the attached preliminary fee estimate for the Securelock Self- Storage Project. I used the
following assumptions:
Office Space — 5,520 Sq. Ft.
Storage Space — 51,280 Sq. Ft.
1— 2" Domestic Water Meter
1 — 2" Irrigation Meter
2 — 8" Fire Meters
These fees may change somewhat depending on the engineering plan submittals
If you have any questions, please contact me at 972 - 304 -3681.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (9 72) 304 -3679
"City ofCoppell Engineering— Excellence By Design"
DEVELOPMENT FEE TABLE
Project: Securelock Self - Storage - Preliminary
Date: 511103
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee
$5,180.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$200.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$205.28
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$4,390.16
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$90.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$2,240.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Council Approval)
Roadway Impact Fee
$10,153.44
$10,153.44
'(100% due prior to Council Approval)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL $22,588.88
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $10,153.44
DEVELOPMENT FEE WORKSHEET
PROJECT: Securelock Self - Storage - Preliminary
DATE: 511103
Water Impact Fee:
Domestic Meter(s):
1 - 2 inch
= 8
ES U's
Irrigation Meter(s):
1 - 2 inch
= 8
ES U's
Total #: 1 Irrigation Meter(s) @ $205.28
0
= 0
ES U's
Fireline Meter(s):
2 - 8 inch
= 2.5
ESU's
Total #: 18.5 ESU's @ $280.00 ea. $5,180.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea. $200.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $205.28
$205.28
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation /Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $205.28
$205.28
Total #: 0 Additional Irrigation Meter(s) @ $0.00
$0.00
Total #: 2 Fireline Meter(s) @ $2,092.44
$4,184.88
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
$30.00
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $30.00 ea.
$90.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 8 @ $280.00 ea.
$2,240.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0 Single - family @ $0.00 per lot
$0.00
0 Multi- family @ $0.00 per unit
$0.00
(50% paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$10,153.44
Information not Available
Information not Availab
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Securelock Self - Storage - Preliminary
DATE: 511103
ROADWAY IMPACT FEE:
Service Area *
9
Category **
Industrial
Land Use **
Mini- Warehouse
Building Area (so
51,280
Development Units **
51.28
Vehicle Miles per Development Unit **
0.66
Fee per Vehicle Mile * **
$300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $10,153.44
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
4 4;.
DEVELOPMENT FEE TABLE
Project: Securelock Office -Preliminary
Date: 511103
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee
$0.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$0.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Council Approval)
Roadway Impact Fee
$6,607.44
$6,607.44
'(100% due prior to Council Approval)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL $6,607.44
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,607.44
DEVELOPMENT FEE WORKSHEET
PROJECT: Securelock Office - Preliminary
DATE: 511103
Water Impact Fee:
Domestic Meter(s):
0
= 0
ESU's
Irrigation Meter(s):
0
= 0
ESU's
0
= 0
ESU's
Fireline Meter(s):
0
= 0
ESU's
Total #: 0 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
$0.00
$0.00
$0.00
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00
Total #: 0 Fireline Meter(s) @ $0.00 $0.00
(100 due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation /Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea. $0.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0 Single-family @ $0.00 per lot $0.00
0 Multifamily @ $0.00 per unit $0.00
(50 paid prior to Council approval of final plat)
Page 1
DEVELOPMENT FEE WORKSHEET
(50% paid at issuance of building permit)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
$6,607.44
Information not Available
Information not Available
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Securelock Office - Preliminary
DATE: 511103
ROADWAY IMPACT FEE:
Service Area *
9
Category **
Office
Land Use **
General Office Bldg.
Building Area (sf)
5,520
Development Units **
5.52
Vehicle Miles per Development Unit **
3.99
Fee per Vehicle Mile * **
t $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,607.44
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - Roadway Impact Fee Study)
At1�l��Ilal'i'l�Z7E, $�r,�Q'7.94;i