Loading...
Securelock-CS030501 (2)T H E • C I T Y • O F P.O. Box 478 255 Parkway Blvd COFFELL Coppell, TX 75019 Phone: (972)304-3681 Fax: (972)304 -3570 T - o F x A ENGINEERING DEPARTMENT FAX COVER SHEET To: Andrew Smith From: Tere T Fax: 972 370 -1427 Date: 4/ Phone: Pag 9 ( in c l ud ing cov s heet) Re: Sew eloek Self Storage CC: Proj File ❑ Urgent ❑For Review ❑ Please Comment ❑ Please Reply 0 As Requested Andrew: Please see the attached preliminary fee estimate for the Securelock Self- Storage Project. I used the following assumptions: Office Space — 5,520 Sq. Ft. Storage Space — 51,280 Sq. Ft. 1— 2" Domestic Water Meter 1 — 2" Irrigation Meter 2 — 8" Fire Meters These fees may change somewhat depending on the engineering plan submittals If you have any questions, please contact me at 972 - 304 -3681. IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (9 72) 304 -3679 "City ofCoppell Engineering— Excellence By Design" DEVELOPMENT FEE TABLE Project: Securelock Self - Storage - Preliminary Date: 511103 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $5,180.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $200.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $205.28 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $4,390.16 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $90.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,240.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $10,153.44 $10,153.44 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $22,588.88 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $10,153.44 DEVELOPMENT FEE WORKSHEET PROJECT: Securelock Self - Storage - Preliminary DATE: 511103 Water Impact Fee: Domestic Meter(s): 1 - 2 inch = 8 ES U's Irrigation Meter(s): 1 - 2 inch = 8 ES U's Total #: 1 Irrigation Meter(s) @ $205.28 0 = 0 ES U's Fireline Meter(s): 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $280.00 ea. $5,180.00 (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. $200.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 1 Domestic Meter(s) @ $205.28 $205.28 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation /Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $205.28 $205.28 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 2 Fireline Meter(s) @ $2,092.44 $4,184.88 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total #: 3 Meter(s) @ $30.00 ea. $90.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 8 @ $280.00 ea. $2,240.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single - family @ $0.00 per lot $0.00 0 Multi- family @ $0.00 per unit $0.00 (50% paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEE WORKSHEET (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $10,153.44 Information not Available Information not Availab Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Securelock Self - Storage - Preliminary DATE: 511103 ROADWAY IMPACT FEE: Service Area * 9 Category ** Industrial Land Use ** Mini- Warehouse Building Area (so 51,280 Development Units ** 51.28 Vehicle Miles per Development Unit ** 0.66 Fee per Vehicle Mile * ** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $10,153.44 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - Roadway Impact Fee Study) 4 4;. DEVELOPMENT FEE TABLE Project: Securelock Office -Preliminary Date: 511103 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $0.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $6,607.44 $6,607.44 '(100% due prior to Council Approval) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $6,607.44 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $6,607.44 DEVELOPMENT FEE WORKSHEET PROJECT: Securelock Office - Preliminary DATE: 511103 Water Impact Fee: Domestic Meter(s): 0 = 0 ESU's Irrigation Meter(s): 0 = 0 ESU's 0 = 0 ESU's Fireline Meter(s): 0 = 0 ESU's Total #: 0 ESU's @ $280.00 ea. (Due prior to issuance of building permit) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) $0.00 $0.00 $0.00 Irrigation/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Additional Irrigation Meter(s) @ $0.00 $0.00 Total #: 0 Fireline Meter(s) @ $0.00 $0.00 (100 due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Irrigation /Fire Meter Deposit Fee: Total #: 0 Meter(s) @ $30.00 ea. $0.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $280.00 ea. $0.00 (Due prior to issuance of building permit) Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Park Fee (For Residential Developments Only): * Preliminary plat approved: After October 26, 1993 0 Single-family @ $0.00 per lot $0.00 0 Multifamily @ $0.00 per unit $0.00 (50 paid prior to Council approval of final plat) Page 1 DEVELOPMENT FEE WORKSHEET (50% paid at issuance of building permit) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) $6,607.44 Information not Available Information not Available Information not Available Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Securelock Office - Preliminary DATE: 511103 ROADWAY IMPACT FEE: Service Area * 9 Category ** Office Land Use ** General Office Bldg. Building Area (sf) 5,520 Development Units ** 5.52 Vehicle Miles per Development Unit ** 3.99 Fee per Vehicle Mile * ** t $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $6,607.44 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - Roadway Impact Fee Study) At1�l��Ilal'i'l�Z7E, $�r,�Q'7.94;i