CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Arm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTaACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIXDESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 4:10am BATCH TIME: 3:42am
TEMPERATURE (F) - AIR 67 v CONCRETE: 70 F
n~UCK NO: 111 TICKET NO: 113794
AIR CONTENT (%): NA UNIT WEIGHT (pc0: .NA.
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line C.7 at 8.4
REPORT OF TE~qT~q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
1 1 4.75 04/25/2003 7 133515 4720 Unbonded Cap
1 2 4.75 05/16/2003 28 Unbonded Cap
1 3 4.75 05/16/2003 28 Unbonded Cap
1 4 4.75 06/13/2003 56 Unbonded Cap
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter pmvided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eng/neers, Ltd.
01DK Page 1 of 10
.oneEn g
Client:
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Duke Realty Services, LP
ARm Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freepor~ Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
M~X DESION 1.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER C~.ONDITIONS: Cloudy
TIME SAMPLED: 5:10am BATCH TIME: 4:48am
TEMPERATURE (F) - AIR 67 F CONCRETE: 76 F
TRUCK NO: 111 TICKET NO: 113804
AIR CONTENT (%): NA UNIT WEIGHT (pcf): .NA -
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line D.3 at 7.6
REPORT OF TEgTg
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 I 5.25 04/25/2003 7 116760 4130 Unbonded Cap
2 2 5.25 05/16/2003 28 Unbonded Cap
2 3 5.25 05/16/2003 28 Unbonded Cap
2 4 5.25 06/13/2003 56 Unbonded Cap
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 2 ofl0
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214)630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Arm: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACXOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
HA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-I064
ASTM C-138
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 6:20am BATCH TIME: 6:00am
TEMPERATURE C~ - AIR 68 F CONCRETE: 82 F
TRUCK NO: 104 TlCrd;T NO: 113814
AIR CONTENT (%): NA UNIT WEIGHT (pct'): ,NA.
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line E.2 at 8.2
REPORT 01~ TEgT,~
· ' r 6" 12" (area 28.27 sq. in.)
Concrete Compressive Cyhnde x
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
3 1 5.50 04/25/2003 7 115645 4090
3 2 5.50 05/16/2003 28
3 3 5.50 05/16/2003 28
3 4 5.50 06/13/2003 56
Water added at site: 10 gallons
F~URE
TYPE
Unbonded Cap
Unbonded Cap
Unbonded Cap
Unbonded Cap
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports am for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 3 of 10
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST MEIHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MlX DESmN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Partly cloudy
TIME SAMI~ED: 7:10am BATCH TIME: 6:49am
TEMPERATURE (F) - AIR 68 F CONCRETE: 8 1 F
TX~UCK NO: 104 TICm~T NO: 113824
AIR CONTENT (%): NA UNIT WEIGHT (PC0:. NA-
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line F.I at 8.4
REPORT 01~ TE~qT,q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 1 6.00 04/25/2003 7 98795 3490 Unbonded Cap
4 2 6.00 05/16/2003 28 Unbonded Cap
4 3 6.00 05/16/2003 28 Unbonded Cap
4 4 6.00 06/13/2003 56 Unbonded Cap
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, eppeamnce, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 4 of 10
8908 Ambassador Row, Dallas, TX 75247
~ · 2696 Gravel Drive, Fort Worth, TX 76118
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
cowrRAcrom Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIXDESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME S~;~ED: 8:50am BATC~ TIME: 8:38am
TEMPERATURE (F) - AIR 69 F CONCRETE: 80
TRUCK NO: 104 T~Crd~T NO: 113834
AIR CONTENT (%}: NA UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line G. 1 at 8.3
REPORT Ol~ TE~qTg
· ' 6" 12" (area 28.27 sq. in.)
Concrete Compressive Cyhnder x
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH
SET NO. (inches) TESTED (days) (lbs. force) (psi)
5 1 5.00 04/25/2003 7 111275 3940
5 2 5.00 05/16/2003 28
5 3 5.00 05/16/2003 28
5 4 5.00 06/13/2003 56
Water added at site: 10 gallons
FRACTURE
TYPE
Unbonded Cap
Unbonded Cap
Unbonded Cap
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 5 of 10
ROneEngineers.
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIXDESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAM~;LED: 9:55am IaATCH TIM~: 9:42am
TEMPERATURE (F) - AIR 73 F CONCRETE: 79 F
TRUCK NO: I 11 TICKET NO: 1 13844
AIR CONTENT (%): NA UNIT WEIGHT (Pc0:, NA_
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line H.3 at 8.7
REPORT Ol~ TEgT,q
.... x 12"
Concrete Compresstve Cyhnder 6 (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
6 1 5.25 04/25/2003 7 112735 3990 Unbonded Cap
6 2 5.25 05/16/2003 28 Unbonded Cap
6 3 5.25 05/16/2003 28 Unbonded Cap
6 4 5.25 06/13/2003 56 Unbonded Cap
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
· ' a arance erformance etc '~ or any other feature of similar subjeat matter provided by persons or conditions over which we have no control. Our letters and
(composttton~, p,pe · '.P --- ' ~' '~- - ~--- -~ ...... ~ .....~ and shall not be renroduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 6 of 10
RoneEn glneers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 FreepoR Parkway
CoppeR, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: OD site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
rLACEMENX DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 1 1:00am EATCH TIME: 10:44am
TEMPERATURE (F) - AIR 76 F CONCRETE: 79 F
TRUCK NO: 111 TICKET NO: 113854
AIR CONTENT (%): NA UNIT WEIGHT (PC0:, NA.
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line J.5 at 7.4
REPORT OF TE~T,q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. farce) (psi) TYPE
7 1 5.00 04/25/2003 7 118920 4210 Unbonded Cap
7 2 5.00 05/16/2003 28 Unbonded Cap
7 3 5.00 05/16/2003 28 Unbonded Cap
7 4 5.00 06/13/2003 56 Unbonded Cap
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 7 of 10
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIXDESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAMI~ED: 12:40pm BATCit XlM~: 12:21pm
TEMPERATURE 03) - AIR 78 F CONCRETE: 78 F
TRUCIC NO: 111 TICm~T NO: 113867
AIR CONTENT (%): NA UNIT WEIGHT (pct'):. NA_
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line K.5 at 7.2
REPORT OF TE,qTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
8 1 5.25
8 2 5.25
8 3 5.25
8 4 5.25
MAXIMUM
DATE AGE LOAD
TESTED (days) (lbs. force)
04/25/2003 7
05/16/2003 28
05/16/2003 28
06/13/2003 56
COMPRESSIVE
STRENGTH FRACTURE
(psi) TYPE
Water added at site: 5 gallons
107070 3790 Unbonded Cap
Unbonded Cap
Unbonded Cap
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 8 of 10
RoneEn g neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
At-tn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fxesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP On):
AIR (%):
TEST METHOD:
cowrRACTOm Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: Oil site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C- 143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 1:40pm SATC~ TIME: 1:16pm
TEMPERATURE (F) - AIR 81 F CONCRETE: 77
TRUC~ NO: 108 TICr,~X NO: 113877
AIR CONTENT (%): NA UNIT WEIGHT (pc0:. NA_
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at grid lines C-N at 7-9
SAMPLE LOCATION: Line L.6 at 6.8
REPORT OF TEgTg
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED
MARKED SLUMP
SET NO. (inches)
9 1 5.50
9 2 5.50
9 3 5.50
9 4 5.50
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH FRACTURE
TESTED (days) (lbs. force) (psi) TYPE
04/25/2003 7 113320 4010 Unbonded Cap
05/16/2003 28 Uilbonded Cap
05/16/2003 28 Unbonded Cap
06/13/2003 56
Water added at site: 5 gallons
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 9 of 10
RoneEn gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175207
Project No.: 037333
Date of Service: 04/18/2003
Report Date: 04/29/2003
Projeet:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/18/2003
WEATHER CONDITIONS: Cloudy
TIME SAMPLED: 2:25pm BATCnTIME: 2:16pm
TEMPERATURE (F) - AIR 8 1 F CONCRETE: 79
TRUCK NO: 105 TICKET NO: 113887
AIR CONTENT (%): NA UNIT WEIGHT (pet'):. NA-
OVERALL PLACEMENT LOCATION:
Area 2 and 5 at g~d lines C-N at 7-9
SAMPLE LOCATION: Linc M.3 at 7.2
ASTM C-39 REPORT OF TE,qTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM
MARKED SLUMP DATE AGE LOAD
SET NO. (inches) TESTED (days) (lbs. force)
10 1 5.25 04/25/2003
10 2 5.25 05/16/2003
10 3 5.25 05/16/2003
10 4 5.25 06/13/2003
7
28
28
56
COMPRESSIVE
STRENGTH
(psi)
100045 3540
FRACTURE
TYPE
Unbonded Cap
Unbonded Cap
Unbonded Cap
Unbonded Cap
Water added at site: 5 gallons
Please see report #175206 for technician time
Technician: Jeremy Watts
Report Distribution:
(1) Duke Realty Services, LP
(I) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Potter Concrete
Started: Finished:
(1) Pacheco Koch Consulting Engineera
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 10 of 10
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
s~tmples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: Oil site
SPECIFICATION REQUIREMENTS
sxmeNam: 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: Clear
TIME SAMI~ED: 4:15am BATCH TIME: 3:44am
TEMPERATURE (F) - AIR 60 F CONCRETE: 78 F
TRUCK NO: 103 TICm~T NO: 113899
AIR CONTENT (%): NA UNIT VCEIGHT (POD: NA.
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line C.2 at I0.1
REPORT OF TE~qT,q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
1 1 4.75 04/28/2003 7 109885 3890 Unbonded Cap
1 2 4.75 05/19/2003 28 Unbonded Cap
1 3 4.75 05/19/2003 28 Unbonded Cap
1 4 4.75 06/16/2003 56 Unbonded Cap
See report g175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 1 ofl0
R°neEn
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Stp. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
MR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: Clear
TIME SAMPLED: 5:55a!Tl BATCH Tiara: 5:48am
TEMPERATURE (F) - AIR 56 F CONCRETE: 79
TRUCK NO: 112 TICKET NO: 113909
AIR CONTENT (%): NA UNIT WEIGHT (Pc0: ,NA
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line D.3 at 9.7
REPORT OF TEgTS
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
2 1 5.00 04/28/2003 7 119530 4230 Unbonded Cap
2 2 5.00 05/19/2003 28 Unbonded Cap
2 3 5.00 05/19/2003 28 Unbonded Cap
2 4 5.00 06/16/2003 56 Unbonded Cap
See report #175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 2 of 10
R°neEn g
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rethway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fi'esh concrete at the placement locations, perform required field testing, east compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: SBHIIy
TIME SAMPLED: 6:50am BATCH ~ME: 6:42am
TEMPERATURE (F)-AIR 55 P CONCRETE: 77
TRUCK NO: 106 TIC~T NO: 113919
AIR CONTENT (%): NA UNIT WEIGHT (PC0:. NA
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line E.5 at 10.8
REPORT Ol~ TE~T~
Concrete Compressive Cylinder 6" x l 2" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
3 1 4.50 04/28/2003 7 111310 3940 Unbonded Cap
3 2 4.50 05/19/2003 28 Unbonded Cap
3 3 4.50 05/19/2003 28 Unbonded Cap
3 4 4.50 06/16/2003 56
Water added at site: 5 gallons
See report #175291 for technician time.
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leners and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers Ltd.
01DK Page 3 of 10
RoneEn g'
neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Atto: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
coz, rrancTom Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
6" maximum
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: SllBIly
TIME SAMPLED: 7:40am BATCH TIME: 7:30am
TEMPERATURE (F) - AIR 59 F CONCRETE: 79
TRUC~NO: 112 TICl~T NO: 1 13929
AIR CONTENT (%): NA UNIT WEIGHT (pcf):. NA_
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line F.4 at 10.5
REPORT OF TE,qT~q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
4 1 4.75 04/28/2003 7 117570 4160 Unbonded Cap
4 2 4.75 05/19/2003 28 Unbonded Cap
4 3 4.75 05/19/2003 28 Unbonded Cap
4 4 4.75 06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report #175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients m whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 4 of 10
8908 Ambassador Row, Dallas, TX 75247
2696 Grovel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Arm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP {in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: Sullrty
TIME SAMPLED: 8:35am BATCH TIME: 8116am
TEMPERAIURE (F) - AIR 63 F CONCaeTE: 79
TRUCK NO: 106 TICKET NO: 113939
A1RCONTENT (%): NA UNIT WEIGHT (pc0: .NA.
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line G.4 at 10.7
REPORT OF TE~qT~q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
5 1 4.75 04/28/2003 7 117580 4160 Unbonded Cap
5 2 4.75 05/19/2003 28 Unbonded Cap
5 3 4.75 05/19/2003 28 Unbonded Cap
5 4 4.75 06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report #175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repotts are for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 5 of 10
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Stp. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
ACm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratoD' for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: Oil site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP On): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C~231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE:
1VEATHER CONDITIONS:
TIME SAMPLED: 9:55anl
TEMPERATURE (F) - AIR
TRUCK NO: 845
AIR CONTENT (%}: NA
04/21/2003
Sunny
BATCH TIME: 9:3 lam
74 F CONCRETe: 78
TICKET NO: 113949
UNIT WEIGHT (pet'): .NA
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line H.2 at 10.4
REPORT OF TE~T~
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE
6 1 5.25 04/28/2003 7 ! 17110 4140 Unbonded Cap
6 2 5.25 05/19/2003 28 Unbonded Cap
6 3 5.25 05/19/2003 28 Unbonded Cap
6 4 5.25 06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report 9175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use &the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rune Engineers, Ltd.
01DK Page 6 of 10
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: OIl site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: Sol'lily
TIMESAM~ED: 10:50am BATCHTIME: 10:33am
TEMPERATURE (F) - AIR 88 V CONCRETE: 80 F
TRUCK NO: 764 TICKET NO: 113959
AIR CONTENT (%): NA UNIT WEIGHT (pcO:~ NA-
OVERALL PLACEMENT LOCATION:
Slab -Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line J.3 at 10.8
REPORT OF TESTS
Concrete Compressive Cylinder 6"x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
7 1 4.75 04/28/2003 7 109110 3860 Unbonded Cap
7 2 4.75 05/19/2003 28 Unbonded Cap
7 3 4.75 05/19/2003 28 Unbonded Cap
7 4 4.75 06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report %175291 for technician time.
LiMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports ate for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 7 of I0
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTaACTOm Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN LD.: 9349
PLACEMENT DATE: 04/2 1/2003
WEATHER CONDITIONS: StllHIy
TIME SAMPLED: ll:30am BATCHTIME: ll:19am
TEMPERATURE (F) - AIR 83 F CONCRETE: 79
TRUC~; NO: 112 ~rICKET NO: 113969
AIR CONTENT (%): NA UNIT WEIGHT (Pc0: .NA_
OVERALL PLACEMENT LOCATION:
Slab ~ Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line K.4 at 9.8
REPORT OF TE~T~
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
8 1 5.00 04/28/2003 7
8 2 5.00 05/19/2003 28
8 3 5.00 05/19/2003 28
8 4 5.00 06/16/2003 56
See report 9175291 for technician time.
115575 4090 Unbonded Cap
Unbonded Cap
Unbonded Cap
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 8 of 10
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
STRENGTm 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-3 !
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: Sunny
TIME SAMI~ED: 12:45pm BATCH TIME: 12:38pm
TEMPERATURE (F) - AIR 83 v CONCRETE: 80 F
TRUCK NO: 107 TICKET NO: 113983
AIR CONTENT (%): NA UNIT WEIGHT (pcl): NA_
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line L.4 at 9.3
REPORT OF TEgTg
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED MAXIMUM COMPRESSIVE
MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE
SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE
9 1 5.75 04/28/2003 7 106025 3750 Unbonded Cap
9 2 5.75 05/19/2003 28 Unbonded Cap
9 3 5.75 05/19/2003 28 Unbonded Cap
9 4 5.75 06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report #175291 for technician time.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, em.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eng/neers, Ltd.
01DK Page 9 of 10
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Stp. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Project:
Services:
Duke Realty Services, LP
Atto: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175292
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: On site
SPECIFICATION REQUIREMENTS
STRENGTH: 4000 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%):
TEST METHOD:
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
M~X DESmN I.D.: 9349
PLACEMENT DATE: 04/21/2003
WEATHER CONDITIONS: SLlnlly
TIME SAMPLED: 1:40pm BATCH TIME: 1:29pm
TEMPERATURE (F) - AIR 87 F CONC~T~: 79 F
TRUCK NO: 106 TIOOgT NO: 113994
AIR CONTENT (%): NA UNIT WEIGHT (pcf):. NA.
OVERALL PLACEMENT LOCATION:
Slab - Area 5 at grid lines C-N at 9-11
SAMPLE LOCATION: Line M.3 at 9.8
REPORT OF TEgTg
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED
MARKED SLUMP
SET NO. 0aches)
10 1 5.00
MAXIMUM COMPRESSIVE
DATE AGE LOAD STRENGTH FRACTURE
TESTED (days) (lbs. force) (psi) TYPE
04/28/2003 7 102055 3610 Unbonded Cap
10 2 5.00
10 3 5.00
05/19/2003 28 Unbonded Cap
05/19/2003 28 Unbonded Cap
10 4 5.00
06/16/2003 56 Unbonded Cap
Water added at site: 5 gallons
See report #175291 for technician time.
Technician: Jeremy Watts
Report Distribution:
(1) Duke Realty Services, L?
(1) Duke Realty Services, LP
(1) City of C oppell Building Dept.
(1) Poaer Concrete
Started:
Finished:
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 10 of 10
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Arm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 175654
Project No.: 037333
Date of Service: 04/26/2003
Report Date: 04/29/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP Standard Counts
Gauge: Troxler 3430 Moisture Density
Test Methods: ASTM D-2922
ASTM D-3017 Gauge Serial No: 32720 Current: 651 Current: 3094
Test Mode: DT
-~- Previous: 661 Previous: 3084
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Tannish Brown Sandy Clay (Lime Treated)
22.0 100.0 Optimum + ~5-100
FIELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) (pcf) (Pc0 (% max)
Lime Subgrade
1 Building pad, 1300' east by 200' north of 6" 1 22.4 117.6 96.1 96
southwest comer, £mal
Lime Subgrade
2 Building pad, 1300' east by 300' north of 6" 1 22.9 117.7 95.8 96
southwest comer, final
Lime Subgrade
3 Building pad, 1300' east by 400' notch of 6" 1 23.8 122.6 99.0 99
southwest comer, final
Lime Subgrade
4 Building pad, 1300' east by 500' north of 6" 1 22.5 116.6 95.2 95
southwest comer, final
Lime Subgrade
5 Building pad, 1300' east by 100' north of 6" 1 22.3 117.3 95.9 96
southwest comer, £mal
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 2
Report No.: 175654 RoneEngineera
Project No.: 037333 tll'll'l~tl
Client: Duke Realty Services, LP
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pachaco Koch Consulting Engineers
Test results on this report meet project specification. /
Started: 7:30am Finished: l:00pm Ro~
(l) Engineering Analyst ' I - ~-~
(1) City of Coppell Engineering Dept. K. Scott
atson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Arm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Drilled Pier Inspection
Report No.: 175433
Project No.: 037333
Date of Service: 04/23/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time: 6:30 a.m. - 4:15 p.m.
Page 1 of 7
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Servieas, LP
(1) City of Coppell Building Dept.
(1) Paeheco Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433
Project No.: 037333
Project: Freeport 10 Date of Service: 4/23/2003
500 Freeport Parkway Page 2 of 7
Driller: Liberty
Pier Identification V-11 V-12 U-12 T-12 S-12
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (it) 12.80 12.60 12.90 12.90 12.80
Depth of Pier After Underre~ming (ft)* 12.80 12.60 13.30 12.90 13.00
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 12.0 11.8 12.4 12.0 12.2
Time Drilling was Completed (am / pm) 8:25 AM 8:36 AM 8:50 AM 9:00 AM 9:14 AM
Time Concrete was Placed (am / pm) 10:00 AM 10:04 AM 10:09 AM 10:28 AM 10:33 AM
Depth of Pier From Top of Concrete (ft) 12.30 9.60 12.90 12.40 12.60
Elevation: Surface (it)** 99.50 99.50 99.40 99.50 99.40
Elevation: Top of Pier (it)** 99.00 96.50 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 86.70 86.90 86.10 86.60 86.40
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175434 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
Section 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433
Project No.: 037333
Project: Freeport l0 Date of Service: 4/23/2003
500 Freeport Parkway Page 3 of 7
Driller: Liberty
Pier Identification R-12 Q-12 P-12 P-13 Q-13
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.70 12.60 12.70 12.70 12.90
Depth of Pier After Underreaming (ft)* 12.70 13.00 12.90 12.90 13.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.8 12.1 12.0 12.0 12.4
Time Drilling was Completed (am / pm) 9:33 AM 9:30 AM 9:50 AM 10:12 AM 10:20 AM
Time Concrete was Placed (am / pm) 10:35 AM 10:56 AM 11:00 AM 11:04 AM 11:09 AM
Depth of Pier From Top of Concrete (ft) 12.20 12.60 9.90 9.90 12.90
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40
Elevation: Top of Pier (f0** 99.00 99.00 96.50 96.50 99.00
Elevation: Bottom of Pier (ft)** 86.80 86.40 86.60 86.60 86.10
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175434 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
P-12 and P-13 are Section 5 balance are Section 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433:
Project No.: 037333
Project: Freeport 10 Date of Service: 4/23/2003
500 Freeport Parkway Page 4 of 7
Driller: Liberty
Pier Identification R- 13 S- 13 T- 13 U- 13 V- 13
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.70 12.60 12.60 12.80 12.90
Depth of Pier After Underreaming (It)* 13.00 12.90 t3.00 12.80 13.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/$$6 6/$$6 6/#6 ' 6/$$6
Length of Reinforcing Steel (It) 12.2 12.0 12.0 12.0 9.8
Time Drilling was Completed (am / pm) 10:35 AM 11:00 AM 10:50 AM 11:24 AM 11:10 AM
Time Concrete was Placed (am / pm) 1:02 PM 1:08 PM 1:21 PM 1:27 PM 1:32 PM
Depth of Pier From Top of Concrete (It) 12.60 12.50 12.50 12.30 10.30
Elevation: Surface (It)** 99.40 99.40 99.50 99.50 99.50
Elevation: Top of Pier (It)** 99.00 99.00 99.00 99.00 96.50
Elevation: Bottom of Pier (It)** 86.40 86.50 86.50 86.70 86.20
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175434 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
Section 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing, We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433
Project No.: 037333
Project: Freeport 10 Date of Service: 4/23/2003
500 Freeport Parkway Page 5 of 7
Driller: Liberty
Pier Identification V-14 U-14 T-14 S-14 R-14
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.80 12.70 12.80 12.70 12.30
Depth of Pier After Underreaming (ft)* 12.80 12.90 13.50 12.90 13.00
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.9 12.0 12.6 12.0 12.2
Time Drilling was Completed (am / pm) 11:48 AM 12:00 PM 12:06 PM 1:00 PM 1:04 PM
Time Concrete was Placed (am / pm) 1:36 PM 1:40 PM 1:59 PM 2:07 PM 2:11 PM
Depth of Pier From Top of Concrete (ft) 12.30 12.50 13.00 12.50 13.00
Elevation: Surface (ft)** 99.50 99.40 99.50 99.40 99.50
Elevation: Top of Pier (fi)** 99.00 99.00 99.00 99.00 99.50
Elevation: Bottom of Pier (ft)** 86.70 86.50 86.00 86.50 86.50
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175434 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
Section 6
LIMITATIONS: The test results presented herein were prepared based upon the specific samples previded for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433
Project No.: 037333
Project: Freeport I0 Date of Service: 4/23/2003
500 Freeport Parkway Page 6 of 7
Driller: Liberty
Pier Identification Q- 14 P- 14 W-3 X-3 Y-3
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underre, ming (fi) 12.30 12.30 12.30 11.60 12.40
Deptk_of Pier After Underreaming (ft)* 12.70 12.30 13.10 11.60 12.90
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ' 6/#6
Length of Reinforcing Steel (ft) 11.8 11.4 12.0 10.5 12.0
Time Drilling was Completed (am / pm) 1:25 PM 1:28 PM 1:53 PM 2:05 PM 2:26 PM
Time Concrete was Placed (am / pm) 2:16 PM 2:20 PM 2:28 PM 2:40 PM 2:45 PM
Depth of Pier From Top of Concrete (fi) 12.20 11.90 12.60 11.10 12.40
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.80 87.10 86.40 87.90 86.60
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175434 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
P-14 is Section 5, Q-14 is Section 6 and the balance of piers is section 3
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similac subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175433
Project No.: 037333
Project: Freeport 10 Date of Service: 4/23/2003
500 Freeport Parkway Page 7 of 7
Driller: Liberty
Pier Identification Z-3 AA-3
Pier Diameter (in) 24 24
~ell Diameter (in) 66 66
Required Minimum Depth (ii) 12.00 12.00
Depth of Pier Prior to Underreamlng (ii) 12.70 13.00
Depth o£ Pier After Underreaming (ft)* 12.80 13.60
Condition of Bottom (wet / dry) Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6
Length of Reinforcing Steel (ii) 12.0 12.7
Time Drilling was Completed (am / pm) 2:30 PM 2:40 PM
Time Concrete was Placed (am / pm) 3:06 PM 3:10 PM
Depth of Pier From Top of Concrete (ft) 12.40 13.20
Elevation: Surface (ft)** 99.40 99.40
Elevation: Top of Pier (ft)** 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.60 85.80
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report # 175434 for Compressive Strength Test Specimens.
· Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
· * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom
of pier elevation data clculated using specified top of pier elevations as shown on the project drawings
and measurement of actual top of concrete from existing surface elevation.
Section 3
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RoneEn glneers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Atln: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 175284
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection . The results are attached.
Technician Time:
Page 1 of 7
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppetl Building Dept.
(1) Pacheco Koch Consulting Engineers
6:30 a.m. - 4:30 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
Ro s, !..
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of thc clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Service: 4/21/2003
500 Freeport Parkway Page 2 of 7
Driller: Liberty
Pier Identification P-7 Q-7 R-7 S-7 T-7
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (t~) l 1.50 11.70 12.00 11.70 11.80
Depth of Pier ARer Underreaming (f~)* 12.00 12.00 12.10 12.00 12.00
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (f0 NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ' 6/#6
Length of Reinforcin$ Steel (f0 10.8 10.8 11.0 11.0 11.1
Time Drilling was Completed (am / pm) 8:22 AM 8:30 AM 8:48 AM 9:03 AM 9:36 AM
Time Concrete was Placed (am / pm) 12:40 PM 12:32 PM 12:25 PM 12:20 PM 12:13 PM
Depth of Pier From Top of Concrete (ft) 11.70 11.60 11.70 11.60 11.50
Elevation: Surface (ft)** 99.30 99.40 99.40 99.40 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (R)** 87.30 87.40 87.30 87.40 87.50
Bearin~ Stratum (description) Tan & Gray Sandy Clay
Note: See report #175285 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
Piers are section 3 unless otherwise noted. Pier P-7 is Section 2
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Service: 4/21/2003
500 Freeport Parkway Page 3 of 7
Driller: Liberty
Pier Identification U-7 V-7 V-8 U-8 T-8
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreamlng (ft) 12.00 12.40 12.10 11.90 12.30
Depth of Pier After Underreamlng (fi)* 12.10 13.00 12.20 12.10 13.00
Cond{~ion of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 - 6/#6
Length of Reinforcing Steel (fi) 11.2 12.0 11.4 11.0 12.0
Time Drilling was Completed (am / pm) 9:14 AM 9:28 AM 9:53 AM 9:55 AM 10:30 AM
Time Concrete was Placed (am / pm) 12:08 PM 12:02 PM 1:17 PM 1:12 PM 1:09 PM
Depth of Pier From Top of Concrete (f0 11.60 12.60 11.70 11.80 12.60
Elevation: Surface (fi)** 99.50 99.40 99.50 99.30 99.40
Elevation: Top of Pier (fi)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (fi)** 87.40 86.40 87.30 87.20 86.40
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175285 for Compressive Strength Test Specimens.
· Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
Piers are section 3 unless otherwise noted.
· * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing strattun, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the spedfic samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Service: 4/21/2003
500 Freeport Parkway Page 4 of 7
Driller: Liberty
Pier Identification S-8 R~8 Q-8 P-8 P-9
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00. 12.00
Depth of Pier Prior to Underreaming (ft) 12.60 12.10 11.70 12.00 12.10
Depth of Pier Afier Underreaming (ft)* 13.00 12.70 12.20 12.20 12.60
Condi~-ion of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) I 12.0 11.8 11.3 11.3 11.7
Time Drilling was Completed (am / pm) 10:25 AM 10:49 AM 10:39 AM 11:02 AM 11:32 AM
Time Concrete was Placed (am / pm) 1:04 PM 1:00 PM 12:50 PM 12:44 PM 1:20 PM
Depth of Pier From Top of Concrete (fi) 12.70 12.30 11.70 11.70 12.20
Elevation: Surface (ft)** 99.30 99.40 99.50 99.50 99.40
Elevation: Top of Pier (f~)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.30 86.70 87.30 87.30 86.80
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175285 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/
Piers are section 3 unless otherwise noted. Pier P-8 is Section 2 and P-9 is Section 5.
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
:luality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Service: 4/21/2003
500 Freeport Parkway Page 5 of 7
Driller: Liberty
Pier Identification Q-9 R-9 S-9 T-9 U-9
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.50 12.40 12.50 12.50 12.60
Depth of Pier After Underreaming (it)* 13.00 12.60 12.90 12.80 13.20
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (It) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ° 6/#6
Length of Reinforcing Steel (It) 12.0 11.7 12.0 11.9 12.3
Time Drilling was Completed (am / pm) 11:23 AM 11:37 AM 11:45 AM 12:50 PM 12:57 PM
Time Concrete was Placed (am / pm) 2:00 PM 2:08 PM 2:14 PM 2:30 PM 2:34 PM
Depth of Pier From Top of Concrete (It) 12.60 12.20 12.60 12.40 12.80
Elevation: Surface (fi)** 99.40 99.40 99.30 99.40 99.40
Elevation: Top of Pier (fi)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (fi)** 86.40 86.80 86.40 86.60 86.20
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175285 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
Piers are section 3 unless otherwise noted.
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Serqice: 4/21/2003
500 Freeport Parkway Page 6 of 7
Driller: Liberty
Pier Identification V-9 V- 10 U- 10 T- 10 S- 10
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ii) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 13.00 13.00 13.00 12.80 12.50
Depth of Pier After Underreaming (ft)* 13.10 13.00 13.00 13.10 12.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 12.0 12.0 12.1 12.3 12.0
Time Drilling was Completed (am /pm) 1:10 PM 1:38 PM 1:26 PM 1:43 PM 2:08 PM
Time Concrete was Placed (am / pm) 2:40 PM 2:44 PM 2:48 PM 2:52 PM 3:00 PM
Depth of Pier From Top of Concrete (ti) 12.60 12.50 12.60 12.60 12.30
Elevation: Surface (ft)** 99.50 99.50 99.40 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.40 86.50 86.40 86.40 86.70
Beating Stratum (description) Tan & Gray Sandy Clay
Note: See report #175285 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
Piers are section 3 unless otherwise noted. Piers V-10, U-10, T-10, S-10, R-10 & Q-10 are Section 6
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
~IMITATIONS: The test results presented herein were prepared based upon the spedflc samples provided for testing. We assume no responsibility for variation in
!quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175284
Project No.: 037333
Project: Freeport 10 Date of Service: 4/21/2003
500 Freeport Parkway Page 7 of 7
Ddller: Liberty
Pier Identification R- 10 Q- 10 P- 10 Q- 11 R- 11
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (R) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 12.70 12.90 12.40 12.60 12.80
Depth of Pier After Underreaming (ft) * 13.00 13.30 13.10 12.90 13.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 12.0 12.4 12.2 12.0 12.2
Time Drilling was Completed (am / pm) 2:00 PM 2:17 PM 2:31 PM 2:42 PM 3:00 PM
Time Concrete was Placed (am / pm) 3:15 PM 3:21 PM 3:30 PM 3:36 PM 3:57 PM
Depth of Pier From Top of Concrete (ft) 12.60 12.90 12.80 12.50 12.80
Elevation: Surface (fi)** 99.40 99.40 99.30 99.40 99.30
Elevation: Top of Pier (ii)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.40 86.10 86.20 86.50 86.20
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report # 175285 for Compressive Strength Test Specimens.
· Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand
Piers are section 3 unless otherwise noted. Pier P-10 is Section 5.
· * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RoneEn gllneers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 175563
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time: 6:30 a.m. - 4:00 p.m.
Page 1 of 6
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pachaeo Koch Consulting Engineers
(I) Engineering Analyst
(1) City of Coppell Engineering Dept.
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc0 or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa.e 1 of I
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175563
Project No.: 037333
Project: Freeport 10 Date of Service: 4/25/2003
500 Freeport Parkway Page 2 of 6
Driller: Liberty
Pier Identification AA-4 Z-4 Y-4 X-4 W-4
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ii) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fl) 12.60 12.60 12.80 12.90 12.70
Depth of Pier Afler Underreaming (fl)* 12.60 12.60 13.50 12.90 13.00
Condiiion of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ti) NA NA NA NA NA
Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ' 6/#6
Length of Reinforcing Steel (ii) 11.8 11.7 12.1 12.0 12.0
Time Drilling was Completed (am / pm) 8:30 AM 8:33 AM 8:42 AM 9:01 AM 9:03 AM
Time Concrete was Placed (am / pm) 12:04 PM 12:12 PM 12:16 PM 12:58 PM 12:52 PM
Depth of Pier From Top of Concrete (ft) 12.20 12.20 13.00 12.50 12.60
Elevation: Surface (it)** 99.40 99.40 99.50 99.40 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (fl)** 86.80 86.80 86.00 86.50 86.40
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175564 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 3
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test resutts presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
:luality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contrct,
Dur letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175563
Project No.: 037333
Project: Freeport 10 Date of Service: 4/25/2003
500 Freeport Parkway Page 3 of 6
Driller: Liberty
Pier Identification W-5 X-5 Y-5 Z-5 AA-5
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 13.00 12.80 13.00 13.00 12.60
Depth of Pier After Underreaming (it)* 13.80 13.30 13.10 13.60 12.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Len~h (it) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 ° 6/#6
Length of Reinforcing Steel (it) 12.7 12.4 12.2 12.8 11.9
Time Drilling was Completed (am / pm) 9:22 AM 9:26 AM 9:49 AM 9:57 AM 10:09 AM
Time Concrete was Placed (am / pm) 1:10 PM 1:15 PM 1:19 PM 1:26 PM 1:30 PM
Depth of Pier From Top of Concrete (ft) 13.30 12.80 12.60 13.20 12.30
Elevation: Surface (it)** 99.50 99.50 99.50 99.40 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 85.70 86.20 86.40 85.80 86.70
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175564 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 3
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
· measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175563
Project No.: 037333
Project: Freeport 10 Date of Service: 4/25/2003
500 Freeport Parkway Page 4 of 6
Driller: Liberty
Pier Identification AA-6 Z-6 ¥-6 X-6 W-6
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 12.70 13.60 13.00 13.10 12.90
Depth of Pier After Underreaming (It)* 12.80 13.60 13.60 13.60 13.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (fi) 11.9 12.7 12.7 12.2 12.4
Time Drilling was Completed (am / pm) 10:40 AM 11:00 AM 10:46 AM 11:08 AM 11:22 AM
Time Concrete was Placed (am / pm) 1:34 PM 1:37 PM 1:42 PM 1:48 PM 1:52 PM
Depth of Pier From Top of Concrete (fi) 12.30 13.10 13.10 13.20 12.80
Elevation: Surface (It)** 99.50 99.50 99.50 99.40 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (it)** 86.70 85.90 85.90 85.80 86.20
'Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175564 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 3
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175563
Project No.: 037333
Project: Freeport 10 Date of Service: 4/25/2003
500 Freeport Parkway Page 5 of 6
Driller: Liberty
Pier Identification W-7 X-7 Y-7 Z-7 AA-7
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 12.40 12.60 12.60 12.60 12.70
Depth of Pier After Underreaming (ft)* 12.40 13.00 12.80 12.90 12.80
Condii-ion of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (fi) 11.5 12.2 12.0 12.0 12.0
Time Drilling was Completed (am / pm) 11:40 AM 11:43 AM 12:00 PM 1:08 PM 1:21 PM
Time Concrete was Placed (am / pm) 1:55 PM 2:00 PM 2:15 PM 2:18 PM 2:25 PM
Depth of Pier From Top of Concrete (ft) 12.00 12.60 12.30 12.40 12.30
Elevation: Surface (fi)** 99.40 99.40 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 87.00 86.40 86.70 86.60 86.70
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175564 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 3
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject m
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175563
Project No.: 037333
Project: Freeport 10 Date of Service: 4/25/2003
500 Freeport Parkway Page 6 of 6
Driller: Liberty
Pier Identification AA-8 Z-8
Pier Diameter (in) 24 24
Bell Diameter (in) 66 66
Required Minimum Depth (ft) 12.00 12.00
Depth of Pier Prior to Under,earning (~) 12.60 12.70
Depth of Pier A~er Underreaming (~t)* 13.30 12.80
Condition of Bottom (wet / dry) Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes
Casing Diameter (in) / Casing Length (~) NA NA
Number of Ba~s / Reinforcing Ba~ Size (#) 6/#6 6/#6
Lengtl~ of Reinforcing Steel (ft) 12.4 12.0
Time Drilling was Completed (am / pm) 1:50 PM 1:25 PM
Time Concrete was Placed (am / pm) 2:43 PM 3:00 PM
Depth of Pier From Top of Concrete (ft) 12.80 12.40
Elevation: Surface (ft)** 99.50 99.40
Elevation: Top of Pier (~)** 99.00 99.00
Elevation: Bottom o£Pier (~t)** 86.20 86.60
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #175564 for Compressive Stret~gth Test Specimens.
I* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 3
** - Elevation data not supplied to Rone Engineers. Noted surface, top o£bearing stratum, and bottom of
pier elevation data calculated using speci~ed top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
.IMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
!quality (composition, appearance, performance, etc.} or any other feature of similar subject m
RoneEng neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport I0
500 Freeport Parkway
C0ppell, TX
Services: Drilled Pier Inspection
Report No.: 175346
Project No.: 037333
Date of Service: 04/22/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time: 6:30 a.m. - 11:00 a.m.
Page 1 of 2
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(i) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quali~y
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Page 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 175346
Project No.: 037333
Project: Freeport 10 Date of Service: 4/22/2003
500 Freeport Parkway Page 2 of 2
Driller: Liberty
Pier Identification P-11 S-11 T-11 U-I 1
Pier Diameter (in) 24 24 24 24
Bell Diameter (in) 66 66 66 66
Required Minimum Depth (12) 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (f0 12.40 12.70 12.50 12.70
Depth of Pier After Underreaming (12)* 12.70 12.90 12.80 12.80
Condition of Bottom (wet / dry) Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes
Casing Diameter (in) / Casing Length (12) NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6
Length of Reinforcing Steel (ft) 11.7 12.0 12.0 12.0
Time Drilling was Completed (am / pm) 8:40 AM 8:36 AM 9:15 AM 9:11 AM
Time Concrete was Placed (am / pm) 9:45 AM 9:58 AM 10:06 AM 10:25 AM
Depth of Pier From Top of Concrete (ft) 12.30 12.60 12.30 12.30
Elevation: Surface (ft)** 99.40 99.30 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (R)** 86.70 86.40 86.70 86.70
Bearinl~ Stratum (description) Tan & Gray Sandy Clay
Note: See report #175347 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: 12' minimum depth or top of sand/Section 5
** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual top of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
)ur IErtters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
neers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175285
Project No.: 037333
Date of Service: 04/21/2003
Report Date: 04/29/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fi'esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: . On site
SPECWICATION REQUIREMENTS
4000 psi ~ 28 Days
5" - 7"
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-138
ASTM C-39
PROJECT DATA
MIXDESIGN I.D.: 9261
PLACEMENT DATE: 04/21/2003
WEATHER ~CONDITIONS: Clear
TIME SAMPLED: 12:55pm BATCH TIME: 12:22pm
TEMPERATURE (F) - AIR 81 F CONCRETE: 80 F
TRUCKNO: 854 TIC~T NO: 113980
AIR CONTENT (%): NA UNIT WEIGHT (pcO:, NA-
OVERALL PLACEMENT LOCATION:
See pier inspection report #175284
SAMPLE LOCATION: Piers P-7, Q-7 and Q-8
REPORT OF? TEgT~q
Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.)
CYLINDER MEASURED
MARKED SLUMP DATE AGE
SET NO. Ouches) TESTED (days)
1 3 6.25 05/19/2003 28
1 4 6.25 05/19/2003 28
1'* 1 6.25 04/28/2003 7
1'* 2 6.25 05/19/2003 28
MAXIMUM COMPRESSIVE
LOAD STRENGTH
Obs. force) (psi)
See report #175284 for technician time.
**Test specimens 1-1 and 1-2 were destroyed on the jobsite.
Technician: Rick Smith
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Potter Concrete
Started: Finished:
(1) Pacheco Koch Consulting Engineers
(1) Engineering Analyst
(1} City of Coppell Engineering Dept.
FRACTURE
TYPE
Unbonded Cap
Unbonded Cap
Unbonded Cap
K. Icott Watson
CMT (3 ~erations Manager
Unbonded Cap
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01DK Page 1 of 1
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Reinforcing Steel Inspection
Report No.: 175472
Project No.: 037333
Date of Service: 04/23/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 1
Technician: Larmy Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
6:30 a.m. - 9:00 a.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature ofsimilar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written eppmval of Rone Engineers, Ltd.
99DD Pa£e 1 of 1
RoneEn ineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Report of
Reinforcing Steel Inspection
Client: ~ ~, g ~ Report No.: /
Project No.: c9 3 '7333
Date of Service:
Page
Project: Free p~ r ~ ! O
c1' 23 o3
/L~ of ~-
Locations and Items Inspected: '7"-t'~' ~/~ ~ / ,',~ e P
Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non
Conforming Conforming 'Conforming
Placing Drawings Bar Length Column Ties Properly
Approved ~ and Shape ~ lied and Spaced ~
Bar Size ~ Proper Bar Placement ~ Stirrup Spacing and Type ~
Bar Grade ~ Properly Tied ~ Lapped Splices ~
Bars Clean ~ Dowel Bars in Place ~ Welded Splices ~
Form Clean ~ Proper Bar Supports ~ Mechanical Splices ~
qumber Bars ~ proper Cover ~
Inspector's Signature: Z, (.~, 5'/ Time: to
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Reinforcing Steel Inspection
Report No.: 175625
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 2
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1} Pacheco Koch Consulting Engineers
2:30 p.m. - 3:00 p.m.
(1) Engineering Analyst
(1) City of Coppetl Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1
gineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Report of
Reinforcing Steel Inspection
Client: f) ._, g: .~ Report No.:
Project No.:
Project: · .tff'~eapo/¢ Io Date of Service:
Page
Locations and Items Inspected:
Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non
Conforming Conforming .Conforming
Placing Drawings Bar Length Column Ties Properly
Approved ~ and Shape ~ Fled and Spaced -'
Bar Size ~ Proper Bar Placement ~ Stirrup Spacing and Type
Bar Grade t...,.-/ Properly Tied k--- Lapped Splices
Bars Clean ~ Dowel Bars in Place ~ Welded Splices
Form Clean ~ Proper Bar Supports L.---- Mechanical Splices
Number Bars ~ Proper Cover ~-~
Discrepancies/Comments:
Inspector's Signature:
L . G ;)./. Time:
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
C0ppell, TX
Services: Reinforcing Steel Inspection
Report No.: 175626
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 1
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of'Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
2:00 p.m. - 2:30 p.m.
(1) Engineering Analyst
(I) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa-e 1 of 1
ROneEn gineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Report of
Reinforcing Steel Inspection
Client: ~'~ ¢ ~ Report No.:
Project No.: 037
Project: ~'~ e ~ oo: --t / o Date of Service:
Page
Locations and Items Inspected:
Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming o Non
Conforming Conforming ' Conforming
Placing Drawings ~ Bar Length 2olumn Ties Properly
Approved and Shape ~ Tied and Spaced .....
Bar Size ~ Proper Bar Placement ~..~'- Stirrup Spacing and Type ~
Bar Grade ~ Properly Tied ~ Lapped Splices ~
Bars Clean I~" Dowel Bars in Place ~ Welded Splices ----'-'
Form Clean ~ Proper Bar Supports (.-'""~ Mechanical Splices
Number Bars ~ Proper Cover
Discrepancies/Comments:
Inspector's Signature:
fi- ~; 5,~ Time: 07
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No
RoneEng ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF REINFORCING STEEL INSPECTION
Client:
Duke Realty Services, LP
Arm: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Reinforcing Steel Inspection
Report No.: 175624
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
Report of Inspection
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Reinforcing Steel Inspection. The results are attached.
Technician Time:
Page 1 of 1
Technician: Lanny Gist
Report Distribution:
(I) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
3:00 p.m. - 4:00 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, em.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa,e 1 of I
gineers
8908 Ambassador Row
Dallas, Texas 75247
(214) 630-9745
121 North Rayner
Fort Worth, Texas 76111
(817) 831-6211
Project:
Report of
Reinforcing Steel Inspection
Repon
Project No.: 03 '7
Date of Service:
Page ~- of
Locations and Items Inspected:
Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming - Non
Conforming Conforming Conforming
Placing Drawings Bar Length Column Ties Properly
Approved ~ and Shape ~ Tied and Spaced
Bar Size ~ Proper Bar Placement ~ Stirrup Spacing and Type
Bar Grade ~ Properly Tied ~ Lapped Splices ~
Bars Clean ~ Dowel Bars in Place ~ Welded Splices --
Form Clean ~ Proper Bar Support~ ~ Mechanical Splices ~
Number Bars ~ Proper Cover
Discrepancies/Comments:
Inspector's Signature:
Time:
Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DALLY ACTIVITIES
Client:
Duke Realty Services, LP
Arm: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Daily Activities
Report No.: 175471
Project No.: 037333
Date of Service: 04/23/2003
Report Date: 04/29/2003
Report of Activities
On this date, a Rone Engineers, Ltd. representative(s) arrived on site for
concrete and reinforcing steel inspection. One set of compressive strength
cylinders was made on a tie beam. Further testing was cancelled for the day due
to inclement weather. Please see report #175472 and 175473 for test results.
Page t of 1
Technician: Lanny Gist
Report Distribution:
(I) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheeo Koch Consulting Engineers
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 175623
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP Standard Counts
Gauge: Troxler 3430 Moisture Density
Test Methods: ASTM D-2922
ASTM D-3017 Gauge Serial No: 32720 Current: 661 Current: 3084
Test Mode: DT ~- Previous: 659 Previous: 3090
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Tan Grayish Brown Clay w/Traces of Sand 21.5 103.5 Optimum +4 ~5 min
2 Dark Brown Clay 19.5 104.5 Optimum +4 95 min
FIELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) (PC0 (pc0 (% max)
Backfill
1 Office area, elevator pit walls, northwall, 6" 1 22.9 126.3 102.8 99
3rd lift
Backfill
2 Office area, elevator pit walls, south wall, 6n 1 24.1 129.1 104.0 100
4th lift
Backfill
3 Plumbing trench, sanitary sewer, main line, 6" 2 20.8 121.3 100.4 96
column line C, 1' below grade
Backfill
4 Plumbing trench, sanitary sewer, main line, 6n 2 21.6 125.4 103.1 99
column line C, 2' below grade
LIMITATIONS: The test results presented heroin were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 2
Report No.: 175623 RoneEngineers
Project No.: 037333 m~m~n$1
Client: Duke Realty Services, LP
TEST
NO
TEST LOCATION
PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
DEPTH No. (%) (pcf) (pcf) (% max)
Backf'fll
5 Plumbing trench, sanitary sewer, main line,
column line E, 1' below grade
Backfill
6 Plumbing trench, sanitary sewer, main line,
column line E, 2' below grade
Backf'fll
7 Plumbing trench, sanitary sewer, main line,
column line H, 1' below grade
Backf'dl
8 Plumbing trench, sanitary sewer, main line,
column line H, 2' below grade
Technician: Lanny Gist
Report Distribution:
(I) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Paeheco Koch Consulting Engineers
6" 2 19.9 122.3 102.0 98
6" 2 20.5 123.4 102.4 98
6" 2 22.2 126.7 103.7 99
6" 2 19.6 123.3 103.1 99
Test results on this report meet project specification.
Started: 6:30am Finished: 2:00pm
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Eng/neers, Ltd.
07DD Page 2 of 2
glneers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Attn: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance with ASTM Standards.
Report No.: 175562
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 04/29/2003
PROJECT DATA
CONTRACTOR: Duke Realty Services, LP
Test Methods: ASTM D-2922
ASTM D-3017
Gauge: Troxler 3430
Gauge Serial No: 32720
Test Mode: DT
Moisture
Current: 661
Previous: 659
M/D No. Description
MOISTURE DENSITY RELATIONS
Maximum
Moisture % Density pcf
1 Tannish Brown Sandy Clay (Lime Treated)
22.0 100.0
Standard Counts
Density
Current: 3084
Previous: 3090
Project Requirements
Moisture Density
Optimum + ~5 rain
FIELD DENSITY TESTS
TEST PROBE
NO TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) (pc0 (pc0 (% max)
Lime Subgrade
1 Building pad, 1100' east by 100' north of 6" 1 23.0 117.3 95.4 95
southwest comer, final
Lime Subgrade
2 Building pad, 1100' east by 200' north of 6" 1 22.6 118.8 96.9 97
southwest comer, final
Lime Subgrade
3 Building pad, ! 100' east by 300' north of 6" 1 24.1 119.1 96.0 96
southwest comer, f'mal
Lime Subgrade
4 Building pad, 1100' east by 400' north of 6" 1 22.4 116.6 95.3 95
southwest comer, final
Lime Subgrade
5 Building pad, 1200' east by 500' north of 6" 1 24.6 121.7 97.7 98
southwest comer, final
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they am addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 1 of 2
Report No.: 175562 RoneEngineers
Project No.: 037333 ~l
Client: Duke Realty Services, LP
TEST
NO TEST LOCATION
PROBE
DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) ~cO (pc0 (% ma~
Lime Subgrade
6 Building pad, 1200' east by 400' north of
southwest corner, final
Lime Subgrade
7 Building pad, 1200' east by 300' north of
southwest corner, final
Lime Subgrade
8 Building pad, 1200' east by 200' north of
southwest corner, final
See report #175623
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheco Koch Consulting Engineers
6" 1
24.3 119.3 96.0 96
6" 1
23.1 120.5 97.9 98
6" 1
23.2 121.7 98.8 99
Test results on this repo~ meet project specification.
for technician time
Started: Finished:
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, eppeamnce, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2