Loading...
ST0202-CS030430April 30, 2003 cOP?ELL Kristi Thomas, President Accessology 302 E. Church Street Lewisville, TX 75057 RE: Bethel School Road at Denton Tap Project # ST02-02 Dear Ms. Thomas: These plans are being submitted for an initial review to determine compliance with the provisions of the Texas Accessibility Act. In essence, the project is a reconstruct of an existing street with the inclusion of an additional lane near the intersection of Denton Tap Road to provide for a left-turn lane. The limits of the project include from curb to curb, however on two side streets, Hidden Valley and Oakbrook, we will be reconstructing small portions of the street back to the limits of the curb return. This section of Bethel School Road is not ADA accessible at this time. Adjacent to the Post Office there is a portion of the sidewalk that stops, and on the north and south sides at the driveway and street there are no accessible ramps. The estimated cost of the project is approximately $350,000. This request tbr review is submitted prior to construction to ensure that it will not be my responsibility during the reconstruction to install ADA accessible ramps at all intersections and driveways or to construct sidewalks along the entire section of the project to bring it into compliance with ADA requirements. Also, I am unsure if the current configuration at Heartz and Bethel School is ADA compliant; however, we are stopping our project short of that intersection. Once you have received this letter, if you will contact this office to let us know the fee and provide an invoice for this review we will process the paperwork for a check to be mailed to you. If you have any questions please feel free to contact to me at your convenience. Sincerely, Kenneth M Griffin, P.E. Director of Engineering/Public Works Office 972/304-3686 Fax 972/304-7041