Loading...
PA9702-LR 990819UONCRETE COMPRESC' VE STRENGTH TEST 8901 Carpenter Frwy, Suite #100 Dallas, Texas 75247 Date of Service: 07/20/1999 Report No.: 9919635 Report Date Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~PReid 732 DeForest 300 Block of Parkway Blvd Coppcll TX 75019 Coppell, Texas/Prj. ~)6051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw &/~SSOC. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/20/1999 BATCH TIME: N/A p~A~rr: N/A TIME SAMPLED: 5:24am BY: Marie Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Night time w/light breeze STRESOTH: 4000 psi @ 28 Days TEMPERATeRE (F) - AIR 74 F CONCRETE: 86 F SLUMP: 4-6" TRVCK NO: 118 TICKET NO: 7524 AIR: 3-6% AIRCONTENT(%): N/~, UNITWEIGHT(pC0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: West half of pavement of parking lot ASTM C- 172 ASTM SAMPLE LOCATION: West corner ,15' W & 6' N REPORT OF TESTS ACCUMULATIVE YARDS: CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (clays) (lbs. force) (psi) TYPE 1 i 7.50 07/27/1999 7 118940 4210 1 2 7.50 07/27/1999 7 127780 4520 Average 4:370 1 3 7.50 08/17/1999 28 139440 4930 1 4 7.50 08/17/1999 28 143120 5060 Average 5000 5araple taken ~rora end e~ hose e£ This repo~t is exclusively for the use of the client inclicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 2ONCRETE COMPRE 2" IVE STRENGTH TES( 8901 Carpenter Frwy, $uit~ #10~ Dall~% Texas 75247 )ateofService: 07/20/1999 Report No.: 9919635 Report Date 08/19/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ctr Attn: Bra~FReid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. 4~96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressire strength samples. PROJECT DATA CONTRACTOR: ~-~isaw & fissoc. CONCRETE CLASS: N/,~ CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/20/1999 BATCH TIME: PLANT: N/fi TllVIESAM~LED: 7:00am EV: Mario Garcia SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 86 F sLtn~': 4-6" TRUCK NO: 218 TICKETr~O: N/A AIR: 3-6% AmCO~n~NT(~): N/A UNITWEIGffr(pcf): N/A TEST METHOD: ASTM C-143 PLACEh4ENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: South comer, 30' W & 9' North REPORT OF TESTS ACCtr 4VLAT V ¥AnDS: 190 CYLINDER MEASURED MA~ CO1VIPRES$1VE MARKED SLUIVIP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) T*ZPE 2 1 6.00 07/27/1999 7 88540 3 130 2 2 6.00 07/27/1999 7 83600 2960 Average 3050 2 3 6.00 08/1711999 28 136830 4840 2 4 6.00 08/1711999 28 130110 4600 Avenge 4720 S3. ump taken frox~ out o£ hose of pun~p. Technician: MarioGarcia Started: 3:00am Finished: 8:00am ~ E ineerlng, Inc. (1) City of Coppell (1) City of Coppell - Englneedng (I) Brlnklcy S~rgent Architects (1) City of Copp¢ll - Bldg. Insp. Eugene Hatbout (I) Turner Engineers (1) Ciiy of Coppell - Leisure Serv Dept Vice President (I) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wfiizen approval of HBC Engineering, inc.