Loading...
Valley R Plaza 2-CS 961002lam Wiy rhth A eeautlfW f P.O. BOX 478 233 PARKWAY BLVD. COPPELL, TX 73019 FAX NO. (214) 304,35 ENGINEERING DEPARTMENT FAX COVER SHEET T O: _ FIRM: FAX NO: TRANSMITTED B FROM: P i k /U14 PHONE NO.: DATE: - &l'/9 6 TEa: NUMBER OF PAGES (INCLUDING COVER SHEET) REMARKS rc i f & be ,, .4- d f „le /_, _ 1 _ t c/v! rA„'eU _ h e t, c CA& �,c at fs�� IF YOU DO NOT RECEIVE ALL OF THE G7�l 304 —3 69/ ZXCJ aNCS „� PAGES, PLEASE CALL (214) 304 -3679 BY DBStCN ^ \ PROJECT: DATE: 1012196 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): DEVELOPMENT FEE WORKSHEET 1 - 2 inch = 8 ESU's 1 - 2 inch = 8 ESU's ESU's 2 - 8 inch = 2.5 ESU's Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 4 Connections @ $50.00 ea. (Single fa ily due prior to issuance of building permit) (All otheelopments due prior to issuance of meter) $8,325.00 $ 200.00 Water Meter Fee (Domestic): C*, Total #: 1 Dom 9e Meter(s) @ $195.98 $195.98 (Single family due r to issuance of building permit) (All other developm due prior to issuance of meter) Water Meter Fee (Irrigation /Fireline): Total #: 1 Irrigation Meter(l $195.98 $195.98 Total #: 0 Additional Irrigatio ter(s) @ $0.00 Total #: 2 Fireline Meter(s) @ $2,580.90 $5,161.80 (100% due prior to issuance of meters) Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water met Irrigation /Fire Meter Deposit Fee: �. Total #: 3 Meter(s) @ $35.00 ea. $105.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESLI' 8 @ $450.00 ea. $3,600.00 Wastewater Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 1 Lots @ $50.00 ea. $50.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single- family @ $150.00 / Lot N/A Multi- family @ $75.00 /Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single- family @ $350.00/ Lot N/A Multi- family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) A * Preliminary plat approved aft %ober 26, 1993: N/A Single- family @ $1 / 's 0 /Lot N/A Multi- family @ $1285. Unit (100% paid prior to Cou pproval of final plat) Roadway Impact Fee: A- (See attached fee calculations) 0 Street Lighting Fees: 9 Assessed for lighting in the City's right -of -way. This fee cannot be assessed until after T.U. Electric submits / �X; the lighting plan for the proposed development. �f� Once the plans are submitted, $292.60 per light will be assessed. �� (100% due prior to final acceptance of development) ��- Street Sign Fees: Assessed for signage in the City's right -of -way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A N/A N/A N/A N/A N/A $27,475.20 Information not available at this time Information not available at this time Need submittal of development contracts Page 2 DEVELOPMENT FEE TABLE Project: Date: 1012196 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPR Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee �O $200.00 (100% due at Issua of Water Meter) Water Meter Fee (Domestic) $195.98 (100% due at Issuance 40vater Meter) Water Meter Fee (Irrigation/Fireline /y $5,357.78 (100% due at Issuance of As Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Me r) Irfigation/Fireline Meter Deposit O $105.00 (100% due at Issuance of Water Meteip Wastewater Impact Fee 0 2 $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee G $50.00 I ` (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $27,475.20 $27,475.20 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $45, 388.96 $39,400.20 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL 1- ROADWAY IMPACT FEE CALCULATIONS PROJECT: ? DATE: 1012196 A ROADWAY IMPACT FEE: Service Area * 73 Category ** Commercial Land Use ** Shopping Center Building Size (S q. Ft.) 19,200 Development Units ** 19.2 Vehicle Miles per Development Unit ** 4.77 Fee per Vehicle Mile * ** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) CI $27,475.20 * (Figure 2 -Roadway Imp cCFee Study) ** (Table 3 - Roadway Impact Fee Study) * ** (Schedule 2, Page 3 - Roadway Impact Fee Study)