Valley R Plaza 2-CS 961002lam Wiy rhth A eeautlfW f
P.O. BOX 478
233 PARKWAY BLVD.
COPPELL, TX 73019
FAX NO. (214) 304,35
ENGINEERING DEPARTMENT
FAX COVER SHEET
T O: _
FIRM:
FAX NO:
TRANSMITTED B
FROM: P i k /U14
PHONE NO.:
DATE: - &l'/9 6
TEa:
NUMBER OF PAGES (INCLUDING COVER SHEET)
REMARKS rc i f & be ,, .4- d f „le /_, _ 1 _
t c/v! rA„'eU _ h e t, c CA& �,c at fs��
IF YOU DO NOT RECEIVE ALL OF THE G7�l 304 —3 69/ ZXCJ aNCS „�
PAGES, PLEASE CALL (214) 304 -3679 BY DBStCN ^ \
PROJECT:
DATE: 1012196
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
DEVELOPMENT FEE WORKSHEET
1 - 2 inch = 8 ESU's
1 - 2 inch = 8 ESU's
ESU's
2 - 8 inch = 2.5 ESU's
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 4 Connections @ $50.00 ea.
(Single fa ily due prior to issuance of building permit)
(All otheelopments due prior to issuance of meter)
$8,325.00
$ 200.00
Water Meter Fee (Domestic): C*,
Total #: 1 Dom 9e Meter(s) @ $195.98
$195.98
(Single family due r to issuance of building permit)
(All other developm due prior to issuance of meter)
Water Meter Fee (Irrigation /Fireline):
Total #: 1 Irrigation Meter(l $195.98
$195.98
Total #: 0 Additional Irrigatio ter(s) @
$0.00
Total #: 2 Fireline Meter(s) @ $2,580.90
$5,161.80
(100% due prior to issuance of meters)
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
$30.00
(100% due prior to issuance of water met
Irrigation /Fire Meter Deposit Fee: �.
Total #: 3 Meter(s) @ $35.00 ea.
$105.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESLI' 8 @ $450.00 ea.
$3,600.00
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea. $50.00
(100% due prior to issuance of building permit)
Page 1
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single- family @ $150.00 / Lot
N/A Multi- family @ $75.00 /Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single- family @ $350.00/ Lot
N/A Multi- family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
A
* Preliminary plat approved aft %ober 26, 1993:
N/A Single- family @ $1 / 's 0 /Lot
N/A Multi- family @ $1285.
Unit
(100% paid prior to Cou pproval of final plat)
Roadway Impact Fee: A-
(See attached fee calculations) 0
Street Lighting Fees: 9
Assessed for lighting in the City's right -of -way.
This fee cannot be assessed until after T.U. Electric submits / �X;
the lighting plan for the proposed development. �f�
Once the plans are submitted, $292.60 per light will be assessed. ��
(100% due prior to final acceptance of development) ��-
Street Sign Fees:
Assessed for signage in the City's right -of -way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
N/A
N/A
N/A
N/A
N/A
N/A
$27,475.20
Information not
available at this time
Information not
available at this time
Need submittal of
development contracts
Page 2
DEVELOPMENT FEE TABLE
Project:
Date: 1012196
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
COUNCIL
APPR
Water Impact Fee
$8,325.00
$8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee �O
$200.00
(100% due at Issua of Water Meter)
Water Meter Fee (Domestic)
$195.98
(100% due at Issuance 40vater Meter)
Water Meter Fee (Irrigation/Fireline /y
$5,357.78
(100% due at Issuance of As Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Me r)
Irfigation/Fireline Meter Deposit O
$105.00
(100% due at Issuance of Water Meteip
Wastewater Impact Fee 0 2
$3,600.00
$3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee
G $50.00
I `
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Council Approval)
Roadway Impact Fee
$27,475.20
$27,475.20
(100% due prior to Council Approval)
Street Light Fee
Information not
(100% due prior to Acceptance of Project
available at this time
Street Sign Fee
Information not
(100% due prior to Acceptance of Project
available at this time
Construction Inspection Fee
Need submittal of
development contracts
TOTAL
$45, 388.96
$39,400.20
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL
1-
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: ?
DATE: 1012196 A
ROADWAY IMPACT FEE:
Service Area *
73
Category **
Commercial
Land Use **
Shopping Center
Building Size (S q. Ft.)
19,200
Development Units **
19.2
Vehicle Miles per Development Unit **
4.77
Fee per Vehicle Mile * **
$300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) CI $27,475.20
* (Figure 2 -Roadway Imp cCFee Study)
** (Table 3 - Roadway Impact Fee Study)
* ** (Schedule 2, Page 3 - Roadway Impact Fee Study)