Freeport NIP(7.0)-LR030506RoneEngi eers
8908 Ambassador Row, Dullus, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
IN-PLACE DENSITY TESTING
Client:
Project:
Services:
Duke Realty Services, LP
Atto: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Freeport 10
500 Freeport Parkway
Coppell, TX
Perform In-Place Density Test in accordance wffh ASTM Standards.
Report No.: 176017
Project No.: 037333
Date of Service: 05/01/2003
Report Date: 05/06/2003
PROJECT DATA
CONTRACTOR:
Test Methods:
Duke Realty Services, LP
ASTM D-2922
ASTM D-3017
Gauge: Troxler 3430
Gauge S~rial No: 32720
Test Mode: DT
No.
Description
Moisture
Current: 661
Previous: 652
MOISTURE DENSITY RELATIONS
Maximum
Moisture % Density pcf
Tannish Brown Sandy Clay (Lime Treated)
Standard Counts
Density
Current: 3087
Previous: 3066
Project Requirements
Moisture Density
22.0 100.0 Optimum + 95-100
FIELD DENSITY TESTS
TEST
NO
PROBE
TEST LOCATION DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
~qo. (%) (pcf) (l)c0 (% max)
Lime Subgrade .
Building pad, 1300' east by 100' north of 6" 1 22.3 119.0 97.3 97
southwest comer, final
Lime Subgrade
Building pad, 1300' east by 200' north of 6" 1 22.4 120.7 98.6 99
southwest comer, final
Lime Subgrade
Building pad, 1300' east by 300' north of 6" I 22.7 117.4 95.7 96
southwest comer, ~mal
Lime Subgrade
Building pad, 1300' east by 400' north of 6" 1 22.8 116.7 95.0 95
southwest comer, final
Lime Subgrade
Building pad, 1400' east by 500' north of 6" 1 23.4 118.7 96.2 96
southwest comer, final
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(coroposi'don, appearance, perfonnance, etc.) or any other feature of similar subj eot roatter provided by persons .or condi.fi, ons over w.hich we have no control. ~ letto~s, ,a, nd
reports are for the exclusive use of the clients to whoro they are addressed and shall not be reproduced except ro full without the whiten approval of Rone Engineers, l~m.
07DD Page 1 of 2
Report No.: 176017
Project No.: 037333
Client: Duke Realty Services, LP
RoneEngineers
TEST
NO TEST LOCATION
PROBE
DEPTH
M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
No. (%) (pc0 (pc0 (% max)
Lime Subgrade
6 Building pad, 1400' east by 400' north of
southwest comer, final
Lime Subgrade
7 Building pad, 1400' east by 300' north of
southwest comer, final
Lime Subgrade
8 Building pad, 1400' east by 200' north of
Southwest comer, final
Technician: Lanny Gist
Report Distribution:
(1) Duke Realty Services, LP
(1) Duke R~mlty Services, LP
(1) City of Coppell Building D~t.
(1) Pacheco Koch Consulting Engineers
6" 1
22.1 119.4 97.8 98
6" 1
23.8 118.2 95.5 96
6" I
22.3 121.1 99.0 99
Test results on this report meet project specification.
Started: 6:30am Finished: 2:30pm
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, perfunnanee, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they ave addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
07DD Page 2 of 2
RoneEn g nee s
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel DHve, Fort Worth, TX 76118
6300 Rothway, StP. 1.50, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE BEAM FLEXURAL STRENGTH
Client:
Duke Realty Services, LP
Arm: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175577
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 05/05/2003
Project:
Services:
Freeport 10
500 Freeport Parlovay
Coppell, TX
Obtain samples of fi:esh concrete at the placement locations, perform required field testing, cast flexural sltength samples and bring samples
back to the laboratory for curing and testing in accordance with applicable standards.
coNTaAcrom Duke Realty Services, LP
CONCRETE SUPPLIER: Pot~er
PLANT: OD site
SPEClVICArION REQUnU~smwrs
STRENGTH: 650 psi ~ 28 Days
SLt~P (in): 6" max]mum
AIR (%): NA
TEST METHOD: ASTM C-172
ASTM C-143
ASTM C-1064
ASTM C-78
PROJECT DATA
MIX DESIGN I.D.: 9349
PLACEMENT DATE: 04/25/2003
WEATHER CONDITIONS: Clear
TIME SAMPLED: 4:05SD1 BATCH TL~: 3:42am
TEMPEanT~RE09-AIH 63 F CONC~TE: 80 F
T~UCK NO: 108 TIC~C~T NO: 114019
AIR CONTEWr (%): NA t~T wEIGHT (pcf): NA
PLACEMENT LOCATION: Slab at grid lines C~N at 11-13, Area 5
ASTM C-31
ASTIvl C-231
SAMPLE LOCATION:
ASTM C-138
REPORT OF TESTS
Line C.3 ut 12.7
Concrete Flexural Strength 6" x 6" Beams Span Length 18"
BEAM MEASURED MAXIMUM MODULUS OF AVG AVG
MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH
SET NO. 0nches) TESTED (days) Obs. force) (psi) On) (in)
1 1 6.00 05/02/2003 7 6830 570 6.03 5.98
1 2 6.00 05/23/2003 28
1 3 6.00 05/23/2003 28
Water added at site: 5 gallons
See report %175576 for technician time.
LIMITATIONS: The mt results presented hm~in were prepared based upon the specific samples provided for testing We assume no responsibility for variation ia quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con,roi. Our letters and
reports are for the exclusive use of the clients to whom they are sddr~sed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
02DK Page 1 of 5
gineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE BEAM FLEXURAL STRENGTH
Client:
Project:
Services:
Duke Realty Services, LP
At~: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175577
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 05/05/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, p~form required field testing, ca~t flexural strength samples and bring samples
back to the laboratory for curing and testing in aeeordanc~ with applicable standards.
CONX~CTOR: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
P~Awr: On site
SPECIFICATION REQUIREMENTS
STRENGTm 650 psi ~ 28 Days
SLUMP (iD): 6" rnaximum
Am (%): NA
TEST METHOD: ASTM C-179
ASTM C-143
ASTM C-1064
ASTM C-78
PROJECT DATA
~XDESIGN I~.: 9349
PLAC~MEwr DATE: 04/25/2003
W~R Co~omONS: Cle~
T~E S~LgD: 5:20~ BAT~ ~g: 5:14~
~MPE~TU~ ~ - ~ 60 V CONC~TE: 81 g
~VCK~O: 112 TIC~ ~O: 114039
AIR CO~ (%): NA ~T ~IG~ ~0: NA
P~CE~ L~ATIOW: Slab ~ ~d l~es C-N at 11-13, ~ea ~
ASTM C-31
ASTM C-231
SAMPLE LOCATION:
ASTM C-138
REPORT OF TESTS
Line E. 1 at 11.5
Concrete Flexural Strength 6" x 6" Beams Span Length 18"
BEAM MEASURED MAXIMUM MODULUS OF AVG AVG
MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH
SET NO. (inches) TESTED (days) 01~. force) (psi) (in) On)
2 1 4.75 05/02/2003 7 7500 610 6. l ! 6.02
2 2 4.75 05/23/2003 28 ·
2 3 4.75 05/23/2003 28
Beam specimen's moisture condition was wet at the time of testing, all speclmenz
were ground as needed and tested with the use of leather shims.
Water added at site: 5 gallons
See report #175576 for technician time:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other fesatre of similar subject matter provided by persons or conditions over which we have no control Our letters and
~ports a~ for the exclusive use of the diems to whom they are addrossed and shall not be wproduced except in full without the wtit~m approval of Rone Engineers, Ltd.
02DK Page 2 of 5
R ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel DHve, Fort Worth, TX 76118
6300 Rothway, StD. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE BEAM FLEXURAL STRENGTH
Client:
Project:
Services:
Duke Realty Services, LP
At~: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175577
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 05/05/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples offi'esh concrete at the placement locations, perform required field testing, cast flexural strength samples and bring samples
back to the laboratory for curing and testing in accordance with applicable standards.
co~r~cro~ Duke Real~y Services, LP
CONCRETE SUPPLIER: Potter
PLA~T: On site
SPECIFICATION REQUIREMENTS
STRENGTm 650 psi ~ 28 Days
SLUMP On): 6" maximum
nm (%): NA
TEST METHOD: ASTM C-172
ASTM C-143
ASTM C-1064
ASTM C-78
PROJECT DATA
MIX DESIGN I.D.: 9349
PLAC~ME~Cr DATE: 04/25/2003
WEATHER CONDITIONS: Sunny
TIME SAMPLED: 7:20am BATCH TIM~: 6:54am
TEMPEaA~.U~0O-Am 60 F CONC~: 80 F
TRUCKNO: 110 TICg~X NO: 114059
nm CONT~N~ (%): NA ~T WEIGHT CmO: NA
PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, Area 5
ASTM C-31
ASTM C-231
SAMPLE LOCATION:
AS'I'M C-138
REPORT OF TESTS
Line G. 1 at 12.9
Concrete Flexural S~rength 6" x 6" Beams Span Length 18"
BEAbi
MARKED
SET NO.
MEASURED MAXIMUM MODULUS OF AVG AVG
SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH
Ouches) TESTED (days) Obs. force) (psi) (in) On)
3 1 5.00 05/02/2003 7 7250 590 6.06
3 2 5.00 05/23/2003 28
3 3 5.00 05/23/2003 28
Beam specimen's moisture condition was wet at the time of testing, all specimens
were ground as needed and tested with the use of leather shims.
Water'added at site: 5 gallons
See report %175576 for technician time.
LIMITATIONS: The t~st results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conU'ol. Our leUers and
reports are for the exclusive use of thc clients to whom they are addressed and shall not be reproduced except in full without the wri~en approval of Rone Engineers, Ltd.
02DK Page 3 of 5
,RoneEngineers
8908 Ambnssedor Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630=9745
CONCRETE BEAM FLEXURAL STRENGTH
CHeat:
Pro;eet:
Services:
Duke Realty Services, LP
Attn: Mr. Jeff Langston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175577
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 05/05/2003
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast flexo.mi strength samples and bring samples
back to the laboratory for curing and testing in accordance with applicable standards.
CONTRACTOR: D%lke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: OD site
SPECmICATION REQt~REM~Wrs
STRENGTH: 650 psi ~ 28 Days
SLUMP (in): 6" maximum
AIR (%): NA
TEST METHOD: ASTM C- ! 72
ASTM C-143
ASTM C-1064
ASTM C-78
PROJECT DATA
MIX DESIGN I.D.: 9349
~LACEM~NT DATE: 04/25/2003
WEATHER CONDITIONS: Sunay
X~m SAMVCZD: 9:00am SATCat ~nvm: 8:53am
TEMPERATURE (F) - AIR 64 F CONCRETE: 82 F
TaVCK NO: 108 TICE~T~O: 114079
AiR cowTEwr (%): NA tr~x v~ta~rr (pc0: NA
PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, Area 5
ASTM C-31
ASTM C-231
SAMPLE LOCATION:
ASTM C-138
REPORT OF TESTS
Line J.2 at 12.4
Concrete Flexural Strength 6" x 6" Beams Span Length 18"
BEAM MEASURED MAXIMUM MODULUS OF AvG
MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH
SET NO. Ouches) TESTED (days) Obs. force) (pal) On)
4 1 4.00 05/02/2003 7 7330 600 6,11
4 2 4.00 05/23/2003 28
4 3 4.00 05/23/2003 28
Beam specimen's moisture condition was wet at the time of testing, all specimens
were ground as needed and tested with the use of leather shims.
Water added at site: 5 gallons
See report #175576 for technician time.
AVG
DEPTH
(in)
6.00
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for teming. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other fnsmre of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addres.~d and shall not be reproduced except in fifll w/thout the written approval of Rone Engineers, L~i.
02DK Page 4 of 5
ineers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE BEAM FLEXURAI, STRENGTH
Client:
Duke Realty Services, LP
Atl~: Mr. JeffLangston
5495 Belt Line Road, Suite 360
Dallas TX 75254
Report No.: 175577
Project No.: 037333
Date of Service: 04/25/2003
Report Date: 05/05/2003
Project:
Services:
Freeport 10
500 Freeport Parkway
Coppell, TX
Obtain samples of fresh concrete at the placement locations, perform required field testing, east flexural strength samples and bring samples
back to the laboratory for curing and testing in accordance with applicable standards.
com~.ncroa: Duke Realty Services, LP
CONCRETE SUPPLIER: Potter
PLANT: O11 site
SPECIFICATION REQUIREMENTS
STm~NGX~I: 650 psi ~ 28 Days
SLUMP On): 6" maximum
Am (%): NA
TEST METHOD: ASTM C-172
ASTM C-143
ASTM C- 1064
ASTM C-78
PROJECT DATA
MIX DESIGN I.D.: 9349
p[~nOZMV~NT ~)AX[: 04/25/2003
WEATHER CONDITIONS: Sunny
xram SAM~LEn: 12:00pm SATCa T~: 1 l:49am
TEMPEaATtat~ 0~- Ara 79 F CONCRETE: 83 l~
TRVCKNO: 110 TICm~TNO: 114101
Am CONTENT (%): NA . UNIT WEIGHT (pc0:' NA
PLACEMENT LOCATION: Slab at g~d lines C-N at 11-13, Area 5
ASTM C-31
ASTM C-231
SAMPLE LOCATION:
ASTM C-138
REPORT OF TESTS
Line L.2 at 11.8
Concrete Flexural S~ength 6" x 6" Beams Span Length 18"
BEAM MEASURED MAXIMUM MODULUS OF AVG AVG
MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH
SET NO. /Inches) TESTED (days) (lbs. force) (psi) (in) (in)
5 1 4.00 05/02/2003 7 7510 610 6.06 6.05
5 2 4.00 05~3/2003 28
5 3 4.00 05~3~003 28
Beam specimen's moisture condition was wet at the time of testing, all specimens
were ground as needed and tested with the use of leather shims.
See report #175576 for technician time.
Teelmleinn: Jeremy Watts
Report Distribution:
(1) Duke Renlty S~ LP
(1) Duke Rmlty Se~,icex, LP
(1) City of Coppell Building Dept.
(1) Potm' Coacm'te
Started: Finished:
(1) Pacheco Koch Consulting Engine~n~
(1) City of Coppeli Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results preheated herein were prepared basedupon the specific sampleaprovided for testing We assume no responsibility for vafiatlonin quality
(composition, appearance, performance, eic.) or any other feature of similar subject matter provided by persons or conditions over which we have no conu'ol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
OiDK Page 5 of 5
neem
RoneEngi_____
·
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
REPORT OF DRILLED PIER INSPECTION
Client:
Duke Realty Services, LP
At-m: Mr. JeffLangston
5495 Belt Linc Road, Suite 360
Dallas TX 75254
Project: Freeport 10
500 Freeport Parkway
Coppell, TX
Services: Drilled Pier Inspection
Report No.: 176095
Project No.: 037333
Date of Service: 05/02/2003
Report Date: 05/06/2003
Report of InspectiOn
On this date, a Rone Engineers, Ltd. representative(s) was on site to perform
Drilled Pier Inspection. The results are attached.
Technician Time:
Page 1 of 6
Technician: Rick Smith
Report Distribution'.
(1) Duke Realty Ser~cea, LP
(1) Duke Realty Services, LP
(1) City of Coppell Building Dept.
(1) Pacheeo Y~ch Consulting Engineers
6:30 a.m. - 3:15 p.m.
(1) Engineering Analyst
(1) City of Coppell Engineering Dept.
K. Scott Watson
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific sample~ Provided for tes~g. We assume no respousibility for variation in quality
(comlmaifion, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
99DD Pa~e 1 of 1
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, 12 Report No.: 176095
Project No.: 037333
Project: Freeport 10 Date of Service: 5/2/2003
500 Freeport Parkway Page 2 of 6
Driller: Liberty
Pier Identification HH-9 GG-9 FF-9 EE-9 DD-9
Pier Diameter (in) 24 24 24 24 ' 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreamin~ (ft) 12.60 12.90 12.80 12.30 13.00
Depth of Pier After Underreamin~ (ft)* 12.80 13.50 12.80 12.80 13.30
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance 0~es / no) Yes Yes Yes Yes Yes
Casinl~ Diameter (in) / Casing Length (ft) NA NA NA NA NA
Number of Bars / Reinfominl~ Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6
Len~h of Reinforcin~ Steel (ft) 11.7 12.5 11.9 12.0 12.2
Time Drilling was Completed (am / pm) 8:35 AM 8:46 AM 8:57 AM 9:20 AM 9:26 AM
Time Concrete was Placed (am / pm) 10:00 AM 10:13 AM I0:20 AM 10:42 AM 10:46 AM
Depth of Pier From Top of Concrete (f0 12.30 13.00 12.30 12.40 12.80
Elevation: Surface (ft)** 99.50 99.50 99.50 99.40 99.50
Elevation: Top of Pier (f~)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (f~)** 86.70 86.00 86.70 86.60 86.20
iBearin~ Stratum (description) Tan & Gray Sandy Clay
Note: See report #176096 for Compressive Strength Test Specimens.
* Additional Penetration not r,quested unless noted.
Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual to of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upo~ the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, pan'ormance, etc.) or any other feature of similar subject matter provided by parsons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not he reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 176095
Project No.: 037333
Project: Freeport 10 Date of Service: 5/2/2003
500 Freeport Parkway Page 3 of 6
Driller: Liberty
Pier Identification CC-9 BB-9 BB-10 CC-10 DD-10
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (ft) 13.10 13.00 12.50 12.50 12.90
Depth of Pier After Underreaming (ft)* 13.30 13.60 12.80 12.60 13.00
Condition of Bottom (wet / dry) Dr7 I)r7 Dry Dry Dry
Plumb Within Tolerance ()'es / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Len~h (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/~6 6/~6 6/#6 6/#6 6/~6
Len~h of Reinforcing Steel (ft) 12.3 12.7 12.0 11.7 12.1
Time Drilling was Completed (am / pm) 9:42 AM 10:06 AM 10:16 AM 10:35 AM 10:44 AM
Time Concrete was Placed (am / pm) 10:52 AM 11:05 AM ll:12AM 11:23 AM 11:29 AM
Depth of Pier From Top of Concrete (ft) 12.80 13.20 12.30 12.10 12.60
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.20 85.80 86.70 86.90 86.40
Bearing Stratum (description) Tan & Gray Sandy Clay
Note: See report #176096 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual to of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for tesUng. We assume no responsibility for variation in
quality (composition, appearance, performance, eto.) or any other feature of simller subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the cJients to whom they are addressed and shell not be reproduced except In full without the wdtten approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 176095
Project No.: 037333
Project: Freeport 10 Date of Service: 5/2/2003
500 Freeport Parkway Page 4 of 6
Driller: Liberty
Pier Identification EE-10 FF-10 GG-10 HH-10 HH-11
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (f~) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underreaming (fi) 12.80 13.00 12.40 12.70 12.80
Depth of Pier After Underreaming (ft)* 13.00 13.00 12.50 12.70 13.00
Condition of Bottom (wet / dry) D~ Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Casing Diameter (in) / Casing Len~h (ft) NA NA NA NA NA
Number of Bars / Reinforcing Bar Size (#) 6/#6 6/~a5 6/#6 6/#6 6/#6
Len~h of Reinforcing Steel (f0 11.8 12.0 11.5 11.8 12.0
Time Drilling was Completed (am / pm) 11:01 AM 11:18 AM 11:35 AM 1:01 PM 11:54 AM
Time Concrete was Placed (am / pm) 1:20 PM 1:25 PM 1:36 PM 1:49 PM 1:54 PM
Depth of Pier From Top of Concrete (ft) 12.60 12.50 12.00 12.30 12.50
Elevation: Surface (ft)** 99.40 99.50 99.50 99.40 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (f~)** 86.40 86.50 87.00 86.70 86.50
Bearing Stratum (description) ' Tan & Gray Sandy Clay
qote: See report #176096 for Compressive Strength Test Specimens.
* Additional Penetration not requested unless noted.
Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual to of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shell not be reproduced except in full without the written approval of
Rone Engineers, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 176095
Project No.: 037333
Project: Freeport 10 Date of Service: 5/2/2003
500 Freeport Parkway Page 5 of 6
Driller: Liberty
Pier Identification GG-11 FF-11 EE-11 DD-11 CC-11
Pier Diameter (in) 24 24 24 24 24
Bell Diameter (in) 66 66 66 66 66
Required Minimum Depth (fl) 12.00 12.00 12.00 12.00 12.00
Depth of Pier Prior to Underream[ng (ft) 12.70 12.80 12.60 12.80 13.00
Depth of Pier After Underreaminl~ (fl)* 13.00 12.80 13.10 12.90 13.10
Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry
Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes
Cas[n[[ Diameter (in) / Cas[nl~ Len~h (ft) NA NA NA NA NA
Number of Bars / Reinforcinl~ Bar Size (#) 6/#6 6/#6 6/#6 6/g6 6/#6
Length of Re[nforcing Steel (fi) 12.1 12.0 12.2 12.0 12.2
Time Drill[nl~ was Completed (am / pm) 1:32 PM 1:27 PM 1:40 PM 1:52 PM 2:06 PM
Time Concrete was Placed (am / pm) 2:00 PM 2:06 PM 2:19 PM 2:23 PM 2:28 PM
Depth of Pier From Top of Cencrete (ft) 12.50 12.40 12.60 12.40 12.60
Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.50
Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00
Elevation: Bottom of Pier (ft)** 86.50 86.60 86.40 86.60 86.40
Bearing Stratum (description) Tan & Gray Sandy Clay
blote: See report gl 76096 for Compressive Strength Test Specimens.
*Additional Penetration not requested unless noted.
~Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bear[n# stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual to of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specffic samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engine~, Ltd.
RONE ENGINEERS, Ltd.
REPORT OF
BELLED PIER INSPECTION
Client: Duke Realty Services, LP Report No.: 176095
Project No.: 037333
Project: Freeport 10 Date of Service: 5/2/2003
500 Freeport Parkway Page 6 of 6
Driller: Liberty
Pier Identification BB- 11
Pier Diameter (in) 24
Bell Diameter (in) 66
Required Minimum Depth (It) 12.00
Depth of Pier Prior to Underreaming (ft) 12.80
Depth of Pier After Underreaming (it)* 13.00
Condition of Bottom (wet / dry) Dry
Plumb Within Tolerance (yes / no) Yes
Casing Diameter (in) / Casing Len~h (it) NA
Number of Bars / Reinforcing Bar Size (#) 6/#6
Len~h of Reinforcing Steel (it) 12.1
Time Drilling was Completed (am / pm) 2:12 PM
Time Concrete was Placed (am / pm) 2:35 PM
Depth of Pier From Top of Concrete (It) 12.60
Elevation: Surface (it)** 99.40
Elevation: Top of Pier (It)** 99.00
Elevation: Bottom of Pier (It)** 86.40
Bearinl~ Stratum (description) Tan & Gray Sandy Clay
Note: See report #176096 for Compressive Strength Test Specimens.
· Additional Penetration not requested unless noted.
Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of
pier elevation data calculated using specified top of pier elevations as shown on the project drawings and
measurement of actual to of concrete from existing surface elevation.
LIMITATIONS: The test results presented herein were prepared based upon the specific sample~ provided for testing. Wa assume no responsibility for variation in
:lual/ty (composition, appearance, performance, etc.) or any other feature of similar subJect matter provided by pamorts or conditions over which we have no control.
~)ur letters and reports are fo~ the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of
Rone Engineers, Ltd.