Loading...
Freeport NIP(7.0)-LR030505: R°neEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175564 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppcll, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples end bring samples back to the laboratory for curing and testing in accordance with applicable standards. connectOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTa: 4000 psi ~ 28 Days SLUMP (in): 5" - 7" ~ (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9361 PLACEMENT DATE: 04/25/2003 WEATHER CONDITIONS: Clear · n~mS~LED: l:00pm BATCHTIME: 12:29pm TEMPERATLrRE keF) - AIR 80 F CONCRETE: 81 F :mutt No: 108 TIC~T NO: 114110 Am coNTgwr (%): NA UNIT WEIGFIT (peri: NA OVERALL PLACEMENT LOCATION: See pier inspection report #175563 SAMPLE LOCATION: Piers X-4, W-4 and W-5 REPORT Ol~ TERTR Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. Ouches) TESTED (days) Obs- force) (psi) TYPE 1 1 6.25 05/02/2003 7 1 2 '6.25 05/23/2003 28 1 3 6.25 05/23/2003 28 1 4 6.25 06/20/2003 56 See report #175563 for technician time. Technician: Rick Smith Report Distribution: (1) Duke Realty Servieee, LP (1) Duke Realty Service, LP (1) City of Coppell Building Dept. (1) Potter Concrete Started: Finished: (I) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. 113510 4010 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samplez provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written eppmval of Rone Engineers, Ltd. 01DK Page 1 of 1 RoneEn gineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Reinforcing Steel Inspection Report No.: . 175919 Project No.: 037333 Date of Service: 04/29/2003 Report Date: 05/05/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Reinforcing Steel Inspection. The results are attached. Technician Tiroe: 3:00 AM - 4:00 AM Page 1 of 2 Technician: Ben Weaverling Report Distribution: (1) Duk~ R~lty Services, LP (1) Duke Renlty Serviens, LP (1) City of Coppell Building Dept. (l) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples pwvided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~rol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DF PaRe 1 of 1 gineers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-621! Client: Report of Reinforcing Steel Inspection Project: tCr~, ~o r+ tO Report No.: / 7..Cq Project No.: 0 g 7.?.72' Date of Service: q- 7 q- 0.7 Page '~- of Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming No~ Items InspecIed: Conforming Non Conforming Conforming Conforming Placing Drawings Bar Length Column Ties Property Approved ~ and Shape ~ Tied and Spaced Bar Size ~ Proper Bar Placement ~' Stirrup Spacing and Type Bar Grade ~ Properly Tied ,~' Lapped Splices Bars Clean ~ Dowel Bars in Place ~ Welded Splices Form Clean ~. Proper Bar Supports ~ Mechanical Splices Number Bars ~ Proper Cover Discrepancies / Comments: Inspector's Signature: ,..~-- Time: to Client/Contractor Signature: ~ Client/Contractor Copied with Results: Yes / No ,RoneEn g jne : ers:: Client: Project: Services: Duke Realty Services, LP At'm: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Perform In-Place Density Test in accordance with ASTM Standards. 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste+ lS0, Houston, TX 77040 Corporate Phone: (214) 630-9745 IN-PLACE DENSITY TESTING Report No.: 175776 Project No.: ' 037333 Date of Service: 04/29/2003 Report Date: 05/05/2003 PROJECT DATA CONTRACTOR: Duke Realty services, LP Test Methods: ASTM D-2922 ASTM D-3017 Gauge: Troxler 3430 Gauge Serial No: 32720 Test Mode: DT Moisture Current: 652 Previous: 651 Standard Counts Density Current: 3066 Previous: 3094 MOISTURE DENSITY RELATIONS Maximum Project Requirements No. Description Moisture % Density pcf Moisture Density 1 Tannish Brown Sandy Clay (Lime Treated) 22.0 100.0 Optimum + 95-100 FIELD DENSITY TESTS TEST PROBE NO TEST LOCATION DEPTH M/D MOISTURE WET DENSITY DRY DENSITY DENSITY No. (%) (pc0 (pe0 (% max) Lime Subgrade 1 Building pad, 1250' east by 100' north of 6" 1 22.7 118.2 96.3 96 southwest comer, final Lime Subgrade 2 Building pad, 1250' east by 200' north of 6" 1 23.6 118.7 96.0 96 southwest comer, final Lime Subgrade 3 Building pad, 1250' east by 300' north of 6" 1 23.8 123.3 99.6 100 southwest comer, final Lime Subgrade 4 Building pad, 1250' east by 400' north of 6" 1 22.3 118.5 96.9 97 southwest comer, final Lime Subgrade 5 Building pad, 1250' east by 500' north of 6" 1 23.9 121.9 98.4 98 southwest comer, final LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation ia quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no contwl. Our letters and reports are for the exclusive use of the chents to whom they are edd~essed and shall not be reproduced except in fifll without the written approval of Rone Engineers, Ltd. 07DD Page 1 of 2 Report No.: 175776 RoneEngineers Project No.: 037333 Client: Duke Realty Services, LP Technician: Lanny Gist Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers Test results on this report meet project specification. Started: 6:~Oam Finished:ll;30a R~C~ C~ ~fiom M~er LIMITATIONS: The test results presented herein were prepared based upon the specific samples pwvided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, e/c.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 07DD Page 2 of 2 Ro neEng neers 8908 Ambassador Row, Dalla% TX 75247 2696 Gravel Drive, Fori Worth, TX 76118 6300 Rothway, Stp. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrele at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETe. St~PPLIER: Potter r~: ~ site SPECI~CA~ON ~Q~NTS sT~: 4000 psi ~ 28 Days SL~ (in): 6" ~imm Affi (%): ~ST ~OD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN LD.: 9349 PLACEMENT DATE: 04/26/2003 WEA'rHI~R CONDITIONS: Clear TIME SAMPLED: 4' 10am BATCH TIME: 3'43arll TEMPE~T~JRE(V)-Am 60 r CONCRETE: 83 · RVCK NO: 103 ~C~mT NO: 114130 Am coNTEwr (%): NA t~IT WEIGHT (pc0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line N. 1 at 4.8 REPORT OF TE~TR Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.75 05/03/2003 7 116805 4130 Unbonded Cap 1 2 5.75 05/24/2003 28 Unbonded Cap i 3 5.75 05/24/2003 28 Unbonded Cap I 4 5.75 06/21/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: Thetest resultspr~,~,anted herein were prepared based uponthe apecific samples provided for te~ng. We assume no responsibility for variation inqualiW (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and rapom ~ for the exclusive use of the clienis lo whom they are addre/~sed and shall not be reproduced except in full without the wriaen approval of Rone Engineers, Ltd. 01DK Page 1 of 10 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214} 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Arm: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: ' 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locat/cms, perform required field testing, cast compressive strength samples and bring samples back to the laborato~ for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Duke' Realty Services, LP CONCRETE SUPPLIER: Potter pL~rr: On site SPECIFICATION REQUIREMENTS STRE~Tm 4000 psi ~ 28 Days SLUMP (in): 6" maximum AIR (%): TEST blETHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN LD.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 5' 15aIn BATCH TUn~: 5:03am TEMPERATURE (F)- AIR 58 F CONCRETE: 82 F T~VCK NO: 104 TICKET NO: 114139 ,UR co~x~rr (%): NA UNIT WEIGHT (pc0:' NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line P.2 at 3.4 REPORT OF TE~T~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (d~ys) Obs. force) (psi) TYPE 2 1 5.0 05/03/2003 7 123795 4380 Unbonded Cap 2 2 5.0 05/24/2003 28 Unbonded Cap 2 3 5.0 05/24/2003 28 Unbonded Cap 2 4 5.0, 06/21/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other fimture of similar subject marter provided by persons or conditions over wMch we have no conU'ol. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wrlrten approval of Rone Engineers, Ltd. 01DK Page 2 of 10 :RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Linc Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Freepor~ 10 500 Freeport Parkway Coppell, TX , Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive s~ength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOt~: Duke Realty SerVices, LP CONCRETE SUPPLIER: Potter Pta~rr: On site SPECIFICATION REQUIREMENTS STP.~NGTH: 4000 psi ~ 28 Days SLUMP (in): 6" l~aximul~ Am (%): T~ST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.O.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 6:10a122 BATCH TIM~: 6:02am TEMPERATURE (F) - AIR 55 F CONCRETE: 82 'fRUCKNO: 103 TICKETNO: 114150 niR Co,trENT (%): NA UmT W~IaHT (Pc0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line Q.3 at 3.7 RF~PORT OF Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARleD SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bk. force) (psi) TYPE 3 1 5.25 05/03/2003 7 119450 4220 Unbonded Cap 3 2 5.25 05/24/2003 28 Unbonded Cap 3 3 5.25 05/24/2003 28 Unbonded Cap 3 4 5.25 06/21/2003 56 Unbonded Cap LRVlITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other festurc of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports arc for thc exclusive use of thc clients to whom they arc add~ssed end shall not be reproduced except in full without thc written approval of Rone Engineers, Ltd. 01DK Page 3 of 10 gineers 8908 Ambassador Row, DaRns, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corpornte Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Dote: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, east compressive strength samples and bring samples back to the laborato~ for curing end testing in accordance with applicable standards. coNTa~cro~ Duke Realty Services, LP CONCRETE SUPPLIER: Potter pi~vr: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP (in): 6" maximum Am (%): TEST METHOD: NA ASTM C-172 ASTIVl C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MLX OESIGN I.D.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 7:45am BATCH T~M~: 7:36am ~MPERATURE09-Am 62 V CONCRETE: 83 ?RUCX NO: 103 TIGHT NO: 114159 Ara CON~NT (%): NA ~T W~IGHT (pc0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3~5 SAMPLE LOCATION: Line R.5 at 4.2 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 4.75 05/03/2003 7 119930 4240 Unbonded Cap 4 2 4.75 05/24/2003 28 Unbonded Cap 4 3 4.75 05/24/2003 28 Unbonded Cap 4 4 4.75 06/21/2003 56 Unboaded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over wh/ch we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except ia full without the written approval of Rone Engineers, Ltd. 01DK Page 4 of 10 RoneEn g: : · : ineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houstan, TX 77040 Cnrporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CHent: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive s~'ength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. coNTRAcrom Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRE~GTm 4000 psi ~ 28 Days SLUMP (in): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MLX D~,S~GN I~.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 8:25aH1 BATCH TIME: 8128am TEMPERATURE (F) - AIR 68 F CONCRETE: 82 F ~ucxNo: 103 TIC~a~TNO: 114169 Am CONTENT (%): NA UNIT V~[G~-rr (oct): NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line R.9 at 3.7 RF~PORT OF TE,qT,q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH . FRAcTuI~ SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 5 1 4.5 05/03/2003 7 116185 4110 Unbonded Cap 5 2 4.5 05/24/2003 28 Unbonded Cap 5 3 4.5 05/24/2003 28 Unbonded Cap 5 4 4.5 06/21/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results presented he~.in were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and repons are for the exclusive use of the clients to whom they am addressed and shall not be ~produced except in foil without the written approval of Rone Engineem, Ltd. 01DK Page $ of 10 RoneEngineers 8908 Ambassador Raw, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: {214} 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Aah: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRnCTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter P~NT: On site SPECIFICATION P~QUIILEMENTS STRENGTm 4000 psi ~ 28 Days SLUMP (in): 6" maximum Am (%): T~ST M~THOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 10:15am BATCHTIME: 10:02am TEMPERATURE(Ig-AIR 80 F CONCRETE: 82 TRUCK NO: 114 TICI~T NO: 114179 AIR CONTENT (%): NA UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line T. 2 at 4.8 REPORT Oi~ TEgTg Concr~e Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MARKED SET NO. 6 1 6 2 6 3 6 4 MEASURED ~ COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRAc'I'IJRE (inches) TESTED (days) Obs. force) (psi) TYPE 5.0 05/03/2003 7 110755 3920 Unbonded Cap 5.0 05/24/2003 28 Unbonded Cap 5.0 05/24/2003 28 Unbonded Cap 5.0 06/21/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no ~sponsibillty for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our laters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 6 of 10 8908 Ambassador Row, Dnlla% TX 75247 2696 Grnvel Drive, Fort Worth, TX 76118 6300 Rothwny, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 FreePort Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENG~: 4000 psi ~ 28 Days SLU~t~ O-): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: ll:10am nATCnT~m: 10:54am TEMPERATURE (F} - AIR 87 F CONCRETE: 83 F ~ucx No: 109 XlC~T NO: 114189 AIR coNTE~rr (%): NA Cn~aT v~ic~rr (pc0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Line U.I at 3.9 REPORT oN TF. qT q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0lin force) (psi) TYPE 7 1 - 5.0 05/03/2003 7 107330 3800 Unbonded Cap 7 2 5.0 05/24/2003 28 Unbonded Cap 7 3 5.0 05/24/2003 28 Unbonded Cap 7 4 5.0 06/21/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The mst results presented herein were prepam, d based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similer subject matter provided by persons or conditions over which we have no control. Our letters and ~ports are for thc exclusive usc of the clients to whom they are addressed and shall not be ~'produced except in full w/thout the written approval ofRone Engineem, Ltd. 01DK Page 7 of l0 RoneEngi:n:eers: 8908 Ambassador Row, Daflas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 650=9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Arm: Mr. JcffLangston 5495 Belt Linc Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. coNT~croa: Duke Realty Services, LP CONCRETK SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS S~NGTa: 4000 psi ~ 28 Days SLtnVn, 0n): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN LD.: 9349 P~CE~ENT OATE: 04/26/2003 WEATHER CO~I~ONS: Sunny ~S~P~D: 11:45~ BAT~T~: ll:38am TE~g~-~R 85 F CO~: 83 XUUC~ ~O: 111 X~C~X ~O: 114199 ~R CO~ (%): NA ~x ~IGHT ~0: NA O~L P~CE~ LO~TION: Slab - ~d SAMPLR LOCATION: Line V. 1 at 3.4 REPORT OF TE~T~ Concrete Compressive Cylinder 6" x IT' (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 8 1 5.5 05/03/2003 7 105265 3720 Unbonded Cap 8 2 5.5 05/24/2003 28 Unbonded Cap 8 3 5.5 05/24/2003 28 Unbonded Cap 8 4 5.5 06/21/2003 '56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results p~sented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~rol. Our letters and ~potts are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written appwval of Rone Engineers, Ltd. 01DK Page 8 of 10 RoneEng neers 8908 Ambassador Row, DaUas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CHant: Duke Realty Services, LP Atta: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive s~rength samples and bring samples hack to the laboratory for curing and testing in accordance with applicable standards. CO~CTOR: Duke Realty Se~ices, LP CONCRETE SUPPLIER: Potter ~LANT: On site SPECIFICATION REQUIREMENTS STKENaTH: 4000 psi ~ 28 Days SLUMP (in): 6" maximum AIR (%): TEST METHOD: PROJECT DATA ~nx DESIGN LO.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Clear T~SAmI'LED: l:00pm EATCHTIME: 12:40pm TEMPERATtnU~ ~- AiR 89 ~ CONCRETE: 84 V NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 AST~ C- 13 8 SAMPLE LOCATION: Line W.4 at 4.4 ASTM C-39 REPORT OF TE,~T,~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) TRUCK NO: 104 TICKET NO: 114209 AIR CONTENT (%): NA V~T W~IC~tT (Pc0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 CYLINDER MEASURED MAXLMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (Inches) TESTED (days) , Obs. force) (psi) TYPE 9 1 5.0 05/03/2003 7 107270 .3790 Unbonded Cap 9 2 5.0 05/24/2003 28 Unbonded Cap 9 3 5.0 05/24/2003 28 Unbonded Cap 9 4 5.0 06/21/2003 56 Unbondcd Cap Water added at site: 5 gal,lons LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are fi~r the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OlDK Page 9 of 10 RoneEngineers 8908 Ambassador Row, DaHa~, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Arm: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175656 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locatiops, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. coNxancrom Duke Realty Services, LP CONCRETE SUPPLIER: Potter Ptoa~r: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLtWrP 0.): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 1:40pm BATCH r~m: 1:28pm TEMPERATURE (F) - AIR 87 F CONCRETE: 84 F ~vc~cNo: 114 rlCX~?No: 114218 Am CONTZNT (%): NA t~x W~lCH~ (p~0: NA OVERALL PLACEMENT LOCATION: Slab - grid lines N-Y at 3-5 SAMPLE LOCATION: Linc X.8 at 3.3 I~EPORT (}g TE,RT,q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER, MEASURED MARKED SLUMP SET NO. 0riches) 10 1 5.25 10 2 5.25 10 3 5.25 10 4 5.25 DATE AGE TESTED (days) 05/03/2003 7 05/24/2003 28 05/24/2003 28 06/21/2003 56 Water added at site: 5 Gallons MAXIMUM COMPRESSIVE LOAD STRENGTH FRACTURE 0lin force) (psi) TYPE 109745 Technician: Jeremy Watts Report Distribution: (1) Duke Realty ~vic~, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pota~r Conch-re Star,ed: 3:15am Finished: 2:30pm (1) Pachcco Koch Consulting Engineers (1) Enginc~xing Analyst (I) City of Coppeli Engineering Dept. 3880 Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap CMT Operations Manager LIMITATIONS: The test ~uits presented herein were prepared based upon the specific samples pwvided for testing. We assume no responsibility fl~r variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mater provided by persons or condit/ons over which we have no con,roi. Our letters and reports are for the exclusive use of the clients ~o whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 10 of 10 RoneEn gineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE BEAM FLEXURAL STRENGTH Client: Project: Services: Duke Realty Services, LP Aria: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175657 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway CoppeR, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, east flexural strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOm Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTm 650 psi ~ 28 Days SLUMP On): 6" maximum ~m (%): NA TEST METHOD: ASTM C-172 ASTM C-143 ASTM C-1064 ASTM C-78 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEME~cr DATE: 04/26/2003 WEATHER CONDITIONS: Clear TIME SAmPLED: 4:10am BATCHTIME: 3:43am TEMPERATURE (F} - AIR 60 P CONCRETE: 83 F THUC~(NO: 103 TICKET NO: 114130 Am COWrENT (%): NA U~T WEIGHT (pc0: NA PLACEMENT LOCATION: Slab - grid lines N-X at 3-5 ASTM C-31 ASTM C-231 SAI~PLE LOCATION: ASTM C-138 REPORT OF TESTS Line W. 1 at 4.8 Concrete Flexural Strength 6" x 6" Beams Span Length 18" BEAM MARKED SET NO. MEASURED MAXIMUM MODULUS OF AVG AVG SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH (inches) TESTED (days) Obs. force) (psi) (in) (in) 1 I 5.75 05/03/2003 7 1 2 5.75 05/24/2003 28 1 3 5.75 05/24/2003 28 Water added at site: 5 gallons See report 9175655 for technician time. 6550 540 6.05 6.01 LIMITATIONS: The ~est results prcscnted herein were prepared based upon the specific samplea provided for testing. We assume no rcsponsibflity for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conu'ol. Our letters and reports are for the exclusive use of the clients to whom they arc addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 02DK Page 1 of 5 gineers 8908 Ambassador Row, Dallas, TX '/5247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE BEAM FLEXURAI, STRENGTH Client: Project: Services: Duke Realty Services, LP Attn: Mr. Jeff`Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175657 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain satnples of fresh concrete at the placement locations, perform required field testing, cast flexural strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPEClIqCATION REQUIREMENTS STRENGTH: 650 psi ~ 28 Days SLUMP (in): 6" maximum Am (%): NA TEST METHOD: ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-78 MIX DESIGN I.D.: 9349 PLACEMENT DATE: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 6:10am BATCH X~ME: 6:02am ~ERAT~-nm 55 F CONCRE~: 82 F TRUCK NO: 103 TICKET NO: 114150' AIR CONTENT (%): NA UNIT w~m~r (pc0: NA PLACEMENT LOCATION: Slab - grid lines N-X at 3-5 SAMPLE LOCATION: Line Q.3 at 3.7 REPORT OF TESTS Concrete Flexural Strength 6" x 6" Beams Span Length 18" BEAM MEASURED MAXIMUM MODULUS OF AVG AVG MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH SET NO. (Inches) TESTED (days) Obs. force) (psi) (in) (in) 2 1 5.25 05/03/2003 7 6670 550 6.07 6.00 2 2 5.25 05/24/2003 28 2 3 5.25 05/24/2003 28 Beam specimen's moisture condition was wet at the time of testing, all specimens were ground as needed and tested with the use of leather shims. See report #175655 for technician time. LIMITATIONS: The test n~m presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 02DK Page 2 of 5 RoneEngineers 8908 Ambassador Row, DnHa~, TX 75247 2696 Gravel DHve, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Honston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE BEAM FLEXURAL STRENGTH Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175657 Project No.: 037333 Date of Service: 04/26/2003 . Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast flexural strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Dukc Realty Services, LP CONCRETE SUPPLIER: Potter PCA~T: On site SPECIFICATION REQUIREMENTS STRENGTH: 650 psi ~ 28 Days SLUMP (in): 6" maximt~l MR (%): NA TEST M~THOD: ASTM C- 172 ASTM C-143 ASTM C-1064 ASTM C-78 pI OJECT DATA ~ DESIGN LO.: 9349 PLAC~.M~Wr DATE: 04/26/2003 WEATHER CONDITIONS: SllImy TIME SAMPLED: 8.'25am BATCH TIME: 8:28am TEMPERATUP~(F)-AIR 68 ~ CONCE~TE: 82 F ~UCKNO: 103 TIC~mTNO: 114169 AZR co,TEar (%): HA UNIT wg~Gtrr (pc0: NA PLACEMENT LOCATION: Slab - grid lines N-X at 3-5 ASTM C-31 ASTM C-231 SAMPLE LOCATION: ASTM C-138 REPORT OF TESTS Line IL9 at 3.7 Concrete Fiexural Strength 6" x 6" Beams Span Length 18" BEAM MEASURED MAXIMUM MODULUS OF AVG MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH SET NO. (inches) TESTED (days) (lbs. force) (psi) (in) 3 1 4.5 05/03/2003 7 7700 625 6.10 3 2 4.5 05/24/2003 28 3 3 4.5 05/24/2003 28 Beam specimen's moisture condition was wet at the time of.testing, all specimens were ground as needed and tested with the use of leather shims. Water added at site: 5 gallons See report %175655 for technician time. AVG DEPTH (in) 6.03 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for varlation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repons are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 02DK Page 3 of $ gineers 0908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE BEAM FLEXURAL STRENGTH Client: Duke Realty Services, LP At'tn: Mr. leffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175657 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast flexural strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA co~r~crOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENCTH: 650 psi ~ 28 Days SLUMP (in): 6" maximum Am (%): NA TEST METHOD: ASTM C- 172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-78 MIXDESIGN LD.: 9349 PLACESmNT DATE: 04/26/2003 WEATHER CONDITIONS: Sllllny TIME SAMPLED: 1 l:10am BATCH ~IME: 10:54am TEMPERATURE {F) -AIR 87 F CO~CRETE: 83 F ~VCKNO: 109 TICK~TNO: 114189 AIR CONTENT (%): NA U~T w~ia[rr (pc0: NA PLACEMENT LOCATION: Slab - grid lines N-X at 3-5 SAMPLE LOCATION: Line U. 1 at 3.9 REPORT OF TESTS Concrete Flexural Strength 6" x 6" Beams Span Length 18" BEAM MEASURED MAXIMUM MODULUS OF AVG AVG MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH SET NO, (inches) TESTED (days) Obs. force) (psi) (in) (in) 4 1 5.0 05/03/2003 7 6350 520 6.08 4 2 5.0 05~4/2003 28 4 3 5.0 05~4/2003 28 Beam specimen's moisture condition was wet at the time of testing, all specimens were ground as needed and tested with the use of leather shims. Water added at site: 5 gallons See report 4175655 for technician time. 6.01 LIMITATIONS: The tezt results presented he~n were prepared based upon the specific samples provided fur testing. We assume no responsibility for variation in quality (compezition, appearance, performance, cie.) or any other fenmre of similar subject matter provided by persons or conditions over which we have no contwl. Our letters and ~ports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engheers, Ltd. 02DK Page 4 of 5 8908 Ambassador Pow, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214} 630-9745 CONCRETE'BEAM FLEXURAL STRENGTH Client: Duke Realty Services, LP Atto: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175657 Project No.: 037333 Date of Service: 04/26/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast flexural streagth samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. co~n~.AcroR: 'Duke Realty Services, LP CONCRETE SUPPLIER: Potter PL~Cr: ' On site SPEClWCATION REQVIRESmNTS STRENGTH: 650 psi ~ 28 Days SLUMP (in): 6" maximum Am (%): NA TEST METHOD: ASTM C-172 ASTM C-143 ASTM C-1064 ASTM C-78 pROJECT DATA MIX DESIGN I.D.: 9349 pLACEMENT DATg: 04/26/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 1 :(}Opm BATCH rlM~: 12:40pm TEMPERATURE(I~-AIR 89 F CONCRETE: 84 v TaUCKNO: 104 TIC~T NO: 114209 nm cowr~r (%): NA t~aX w~la~rr (pc0: NA PLACEMENT LOCATION: Slab - grid lines N-X at 3-5 ASTM Co31 ASTM C-231 SAMPLE LOCATION: ASTM C-138 REPORT OF TESTS Line W.4 at 4.4 Concrete Flexural Strength 6" x 6" Beams Span Length 18" BEAM MEASURED MAXIMUM MODULUS OF AVG AVG MARKED SLUMP DATE AGE LOAD RUPTURE WIDTH DEPTH SET NO. (inches) TESTED (days) Obs. force) (PSO On) On) 5 1 5.0 05/03/2003 7 6200 505 6.08 6.03 5 2 5.0 05/24/2003 28 5 3 5.0 05/24/2003 28 Beam specimen's moisture condition was wet at the time of testing, all specimens were ground as needed and tested with the use of leather shims. Water added at site: 5 gallons See Report #175655 for technician time Technician: Ben Weaverliag Report Distribution: (1) Duke Realty Service% LP (1) Duke Realty Service% LP (1) City of Coppell Build~ng Dept. (l) Potter Conc,~e Started: Finished: (1) Pacheco Koch Consulting Engines~ (l) Engineering Analyst (1) City of Coppoll Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for tesEng. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subje~ matWr provided by persons or conditions over which we have no control. Our leUe~ and r~ports are for the exclusive use of the cl!ents to whom they are addressed and shall not be reproduced except in full without the written approval of Roue Engineers, Ltd. 02DK Page 5 of 5 RoneEngmneers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fart Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630=9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke RealVj Services, LP Attn: Mr. JeffLangsWn 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CO~CrOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PJ~r: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLt~P 0a): 6" maximum A~R (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLaCEMeNT DATE: 04/25/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 4:05al~t BATCH ~M~: 3:42am TEMPERATURE (F) - AIR 63 F CO:~CRETE: 80 TEUCK~O: 108 TICRE-? NO: 114019 AIR CONTENT (%): NA VmT wEm~? ~0:. NA OVERALL PLACEMENT LOCATION: Slab at g~id lines C-N at 11-13, 3xea 5 SAMPLE LOCATION: Line C.3 at 12.7 R1E, PORT Ol~ TF,~T~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs- force) (psi) TYPE 1 1 6.00 05/02/2003 7 113870 4030 Unbonded Cap 1 2 6.00 05/23/2003 28 Unbonded Cap 1 3 6.00 05/23/2003 28 Unbonded Cap 1 4 6.00 06/20/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The ~ results presented herein were prepared based upon the specific samples provided for testing. We assume aa responsibility for variation in quality (composition, appearance, performance, e~c.) or any other feature of similar subject matter provided by persons or conditions over wh/ch we have no control. Our letters and reports arc for the exclusive use of the clients W whom they are addressed and shall not be reproduced except in full without thc written approval of Rone Engineers, Ltd. 01DK Page 1 of 10 RoneEngineers 0908 Ambassador Row, Dallas, TX 75247 2696 Gravel DHve, Port Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CHeat: Project: Services: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA coNTancrom Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS sxRENaant: 4000 psi ~ 28 Days SLUMP (la): 6" maximum AIR (%): TEST METHOD: ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX DESIGN I.D.: 9349 PLACEM~F DATE: 04/25/2003 WEATI~R CONDITIONS: Clear TIME SAMPLED: 4:45am BATCH ~M~: 4:30am TEMPERATUREiFJ-AIR 60 v CONCRETE: 82 TRUCK NO: 110 TIC~CT NO: 114029 AIR CONTENT (%): ~k~'A UNIT WEIGHT (_oeO: NA OVERALL PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, A~en 5 SAMPLE LOCATION: Line D.2 at 12.8 REPORT OF TEgTg Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. force) (psi) TYPE 2 1 6.00 05/02/2003 7 113265 4010 Unbonded Cap 2 2 6.00 05/23/2003 28 Unbonded Cap 2 3 6.00 05/23/2003 28 Unbonded Cap 2 4 6.00 06/20/2003 ,56 Unbonded Cap LIMITATIONS: The test results presented haein were prepan~l based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, em.) or any other feature of s'unilar subject matter provided by persons or conditions over which we have no con,roi. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be ~produced except in foil without the written approval of Rone Engineers, Ltd. 01DK Page 2 of 10 R gineers 8908 Ambassador Row, Dallas, TX 7S247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, sra. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVe. STRENGTH TEST Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive S~ugth samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTrACtOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STl~NGTm 4000 psi ~ 28 Days SLCnvn, 0n): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN I.D.: 9349 PLACEMENT DATE: 04/25/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 5:20am BATCHTIME: 5:14am TEMPERATURE (F) - AIR 60 F CONCRETE: 81 F TRUCK NO: 112 TICKET No: 114039 AIR CONTENT (%): NA trmT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, Area 5 SAMPLE LOCATION: Line E.I at ! 1.5 REPORT OF TE~T,~ ~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs, force) (psi) TYPE 3 1 4.75 05/02/2003 7 127985 4530 Unbonded Cap 3 2 4.75 05/23/2003 28 Unbonded Cap 3 3 4.75 05/23/2003 28 Unboaded Cap 3 4 4.75 06/20/2003 56 Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results pr~ntad h~'ein were p~pared based upon the specific samples provided for testing. We assume no ~sponsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our l~m:rs and repor~ are for thc exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 3 of 10 RoneEn g,neers 8908 Ambassador Row, Dallas, TX 7524'/ 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Cotgornt~ Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CHent: Project: Services: Duke Realty Services, LP Atto: Mx. SeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report bio.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell,.TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for cuxing and testing in accordance with applicable standards. co~rraxCrOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECUmCATION m~Q~,~N~S STRENCT'a: 4000 psi ~ 28 Days SLUMP (in}: 6" maximum AIR (%): TEST M~THOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGN'I.D.: 9349 PLACEMENT DATE: 04/25/2003 Wff~'rHi~R CONDITIONS: Sunny TIME SAMPLED: 6'05am BATCH T~m: 6:00am TEMPERATURE (F) - AIR 59 F CONCRETE: 81 F ~UCK NO: 108 WICKET lqO: 114049 AIR CONrENT (%): NA UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Slab at grid lines C-lq at 11-13, Area 5 SAMPLE LOCATION: Line F.4 at 11.8 REPORT O17 TE,qT,~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. 0nches) TESTED (days) Obs. force) (psi) TYPE 4 1 5.50 05/02/2003 7 117450 4150 Unbonded Cap 4 2 ' 5.50 05/23/2003 28 Unbonded Cap 4 3 5.50 05/23/2003 28 Unbonded Cap 4 4 5.50 06/20/2003 56 Unbonded Cap LIMITATIONS: The test results presented herein were pmpered based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and tepor~ are for the exclusive use of the clients to whom they are addrezsed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 4 of 10 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST CHent: Project: Services: Duke Realty Services, LP At'tn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of flesh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CO~r~CTOR: Duke Realty Services, LP CONCP~TE SUPPLIER: Potter PLAWr: On site SPECIFICATION REQUIREMENTS S~nGTm 4000 psi ~ 28 Days SLUMP (in): 6" maximum AI~ (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTlVI C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIX DESIGn I.D.: 9349 PLACEMENT DATE: 04/25/2003 W~ATIt~R CONDITIONS: Sunny TIME SAMPLED: 7:20am BATCH TI~: 6:54am TEM~ERA~tn~09-AIR 60 V CONCRETE: 80 ~UCIC nO: 110 TICm~T nO: 114059 Am cowrEwr (%): NA ~t ~G~ ~0: NA O~LL P~CE~ LO~ON: Slab at ~d ~n~ C-N at 11-13, ~ 5 SAMPLE LOCATION: Line G. 1 at 12.9 REPORT 01~ TI~,RTg Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER ~D SET NO. 5 MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE. LOAD STRENGTH 0nchea) TESTED (days) (lb~. force) (pM) 5.00 05/02/2003 7 118295 4180 5 2 5.00 5 3 5.00 5 4 5.00 05/23/2003 28 05/23/2003 28 06/20/2003 56 Water added at site: 5 gallons TYPE Unbonded Cap Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test reanlm presented bemin were prepai~ based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leRers and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full w/thout the written approval of Rone Engineers, Lid. 01DK Page 5 of 10 neers 8908 AmbaHador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Arm: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Du~e Realty Services, LP CONCRETE SUPPLIER: Potter r~rr: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi ~ 28 Days SLUMP 0n): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA MIXDESIGN I.D.: 9349 PLACEMENT DATE: 04/25/2003 WEATHER CONDITIONS: Sunny TIME SAMPLED: 8:10am BATCH TISm: 7:54am TEMPERATURE (F) - AIR 62 F CONCRETE: 83 F TRUCK NO: 112 TICKET NO: 114069 AIR CONTENT (%): NA UNIT WEIGHT (pet}: NA OVERALL' PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, Area 5 SAMPLE LOCATION: Line H.4 at 11.6 REPORT Oi~ TESTS Coner~te Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) Obs. fore. e) (psi) TYPE 6 1 4.75 05/02/2003 7 116180 4110 Unbonded Cap 6 2 4.75 05/23/2003 28 Unbonded Cap 6 3 4.75 05/23/2003 28 Unbonded Cap 6 4 4.75 06/20/2003 56 , Unbonded Cap Water added at site: 5 gallons LIMITATIONS: The test results presented he,in were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 6 of 10 RoneEng'meers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel DHve, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 BeR L'me Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA co~r~.AcroR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: OH site SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi ~ 28 Days SLUMP (in): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 S~LE LOCATION: Line 1.2 at 12.4 ASTM C-39 REPORT OF TE~T~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) M~X DESIGN ]3.: 9349 PLACEMENT DATE: 04/25/2003 WEATHER CONDITIONS: Sulmy TIMESmW. PLZD: 9:00am BAT~: 8:53m ~MPE~Tm~-~ ~ ~ CONC~: 82 ~v~ ~o: 108 TIc~ ~o: 114079 ~ co~ (%): NA ~T ~c~ ~0: NA O~ P~NT LOCA~ON: SI~ at ~d ~ C-N at 11-13,~5 CYLINDER MEASURED MARKED SLUbIP DATE SET NO. 0nches) TESTED 7 1 4.00 05/02/2003 7 2 4.00 05/23/2003 7 3 4.00 05/23/2003 7 4. 4.00 06/20/2003 Water added at site: 5 gallons MAXIMUM COMPRESSIVE AGE LOAD STRENGTH FRACTURE (days) Obs. force) (psi) TYPE 7 126875 4490 Unbonded Cap 28 UnbondedCap 28 UnbondedCap 56 Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~,ol. Our letters and repo~s are for the exclusive use of thc clients to whom they are addressed and shall not bo reproduced except in full without the written sppwval of Reno Engineers, Ltd. 01DK Page 7 of 10 RoneEng, 8908 Ambasmdor Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Homton, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Project: 'Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samplas of fresh concrete at the plaeem=nt locations, perform required field t~sting, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRAcrom Duke Realty Services, LP CONCRETE SUPPLIER: Potter PL.4~T: On site SP~.CnnCATtON REQUmESmNTS STRENGTH: 4000 psi ~ 28 Days SLUMP 0n): 6" maximum AIR (%): TEST M~THOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 PROJECT DATA ~ux DESIGN ~.: 9349 PLACEMENT DATE: 04/25/2003 WEATIIER CONDITIONS: Sunny TlYmSAM~ED: ll:00am BATCHTIM~: 10:54am TEMPERATURE (F) - AlP. 79 v CONCRETE: 80 ~muc~c NO: 110 TICI~T NO: 114089 AIR CONTENT (%}: NA UNIT WEIGHT (.oeO: NA OVERALL PLACEMENT LOCATION: Slab at grid lines C-N at 11-13, Area 5 SAMPLE LOCATION: Line K. 1 at 12.7 RF, PORT OF TE~qT~q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MARKED SET NO. MEASURED MAXIMUM COMPRESSIVE SLUMP DATE AGE LOAD STRENGTH FRACTURE (inches) TESTED (days) 0bs. force) (psi) TYPE 1 5.50 05/02/2003 7 106130 3750 Unbonded Cap 2 5.50 05/23/2003 28 Unbonded Cap 3 5.50 05/23/2003 28 Unbonded Cap 4 5.50 06/20/2003 56 Unbonded Cap LIMITATIONS: The test results presmted herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of sirnilar subject matter pwvided by persons or conditions over.which we have no conirol. Our lettem and repor/s are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full w/thout the written appwval of Rone Engineers, Ltd. 01DK Page 8 of 10 RoneEngineers 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Project: Services: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Freepor~ 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOm Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENaTH: 4000 psi ~ 28 Days SLtnvn, (in): 6" maximum AIR (%): TEST lV~THOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 trax DESIGN LD.: 9349 PLACEMENT DATE: 04/25/2003 WEATIIER CONDITIONS: Sunny TrM~SAMVLED: 12:00pm BATC~ITIME: lh49am TEMPERATURE (F) - AIR 79 F CONCRETE: 83 TRUCKNO: 110 TIC~TNO: 114101 Am COUNT (%): NA tr~ w~ia~rr CocO: HA OVERALL PLACEMENT LOCATION: Slab at grid line~ C-N at 11-13, Area 5 SAMPLE LOCATION: Line L.2 at 11.8 REPORT Ol~ TE~T~ Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRAL'r ~ SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 9 1 4.00 05/02/2003 7 121850 4310 Unbonded Cap 9 2 4.00 05/23/2003 28 Unbonded Cap 9 3 4.00 05/23/2003 28 Unbonded Cap 9 4 4.00 06/20/2003 56 Unbonded Cap LIMITATIONS: The teat results presented herein were prepared based upon the specific semplez provided for testing. We assume no reeponsibility for vatiation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no con~rol. Our letters and repom are for the exclusive use of the clients to whom they are addressed and shah not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 9 of I0 8908 Ambassador Row, Dallae, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: Duke Realty Services, LP Atln: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Report No.: 175576 Project No.: 037333 Date of Service: 04/25/2003 Report Date: 05/05/2003 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laborato~ for curing and testing in accordance with applicable standards. PROJECT DATA CO~RACrOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLAXr: On site SPECifiCATION REQtnRE~NTS S~GXH: 4000 psi ~ 28 Days SLUMP 0n): 6" maximum AIR (%): TEST METHOD: NA ASTM C-172 ASTM C-31 ASTM C-143 ASTM C-231 ASTM C-1064 ASTM C-138 ASTM C-39 MIX D~S~G~ L~.: 9349 PLACE~m~rr DAT~: 04/25/2003 WEATHER CONDITIONS: Surlily TIM~ SAMPLED: 12:5~m BAT~ ~: 12:37pm ~E~T~ ~ - ~ 87 F coNc~: 83 F · av~o: 110 ~c~x~o: 114~12 ~a co~TE~ (%): NA ~x ~IG~ ~: NA O~L P~NT LOCA~ON: S~b at ~d lin~ C-N at 11-13, ~ 5 SAMPLE LOCATION: Line M.4 at 11.3 REPORT OF TE~qT~q Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) CYLINDER MARKED SET NO. 10 1 10 2 10 3 10 4 MEASURED SLUMP ' (inche~) 5.00 5.00 5.00 5.00 Technician: Jeremy Watts Report Distribution: (1) Duke Realty S~rvices, LP (1) Duke Realty Services, LP (I) City of Coppell Building Dept. (1) Potte~ Concrete bIAXIMUbi DATE AGE LOAD TESTED (days) Ob~. force) COMPRESSIVE STRENGTH FRA~'t'tIRE (mO TYPE 05/02/2003 7 05/23/2003 28 05/23/2003 28 06/20/2003 56 121940 Started: 3:15am Flninhed: 2:00pm (1) Pacl~co Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. 4310 Unbonded Cap Unbonded Cap Unbonded Cap Ro · Scott atson ' CMT Operations Manager LIMITATIONS: The test r~mlta presented herein were p~pared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appenrance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporm are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 10 of 10 RoneEngi ers: Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Drilled Pier Inspection 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, St~ 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Report No.: 176018 Project No.: 037333 Date of Service: 05/01/2003 Report Date: 05/05/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on si~e to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Paeheco Koch Consulting Engineam 6:30 a.m. - 4:45 p.m. (1) Engincerln~g Analyst (1) City ofCoppell Enginecxing Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: Thc test results presen~xl herein were prepared based upon the specific samples pwvided for testing. We assume no responsibility f~r variation in quality (composition, appearance, performance, etc.) or ony other feature of similar subject matter provided by persons or conditions over which we have no conirol. Our letters and ~'pons are for the exclusive use of thc clients u) whom they are addressed and shall not be r~produced except in full without the written approval of Ron¢ Engineers, Ltd. 99DD Pac~e 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 176018 Project No.: 037333 Project: FreePort 10 ~ Date of Service: 5/1/2003 500 Freeport Parkway Page 2 of 6 Driller: Liberty Pier Identification FF-5 GG-5 HH-5 HH-6 GG-6 Pier Diameter (in) 24 24 24 24 24 .Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.70 13,00 13.00 12.80 12.90 Depth of Pier After Underreaminl~ (ft)* 12.90 13.40 13.00 13.00 12.90 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (),es / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforein~ Bar Size (#) 6/g6 6/#6 6/#6 6/g6 6/g6 Length of Reinforcing Steel (ft) 12.0 12.5 12.1 12.0 12.0 Time Dfillinl~ was Completed (am / pm) 8:58 AM 9:09 AM 9:30 AM 9:37 AM 10:06 AM Time Concrete was Placed (am / pm) 10:47 AM 10:52 AM 10:59 AM 11:20 AM 11:26 AM Depth of Pier From Top of Concrete (ft) 12.50 13.00 10.00 12.60 12.40 Elevation: Surface (ft)** 99.40 99.40 99.50 99.40 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 96.50 99.00 99.00 .Elevation: Bottom of Pier (ft)** 86.50 86.00 86.50 86.40 86.60 Beafin~ Stratum (description) Tan & Gray Sandy Clay Note: See report #176019 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete f~om existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, porrormance, etc.) or any other feature of slmtlar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive usa of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE 'ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 176018 Project No.: 037333 Project: Freeport 10 Date of Service: 5/1/2003 500 Froepott Parkway Page 3 of 6 Driller: Liberty Pier Identification FF-6 EE-6 DD-6 CC-6 BB-6 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Recluired Minimum Depth (f~) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Unde~reaming (R) 12.80 13.30 13.10 12.60 12.90 , Depth of Pier After Underreaming (ft)* 12.90 13.60 13.30 13.20 12.90 Condition of Bottom (wet / dry) Dry Dry Dry I~ Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Len[Ch (fl) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 . 6/#6 6/#6 6/g6 6/#6 Length of Reinforcing Steel (fi) 12.0 12.7 12.5 12.3 12.0 Time Dfillin$ was Completed (am / pm) 10:34 AM 10:44 AM 10:17 AM ll:21 AM 11:06 AM Time Concrete was Placed (am / pm) 11:35 AM 11:41 AM 12:16 PM 12:24 PM 12:34 PM Depth of Pier From Top of Concrete (ft) 12.40 13.10 12.90 12.80 12.40 Elevation: Surface (fi)** 99.50 99.50 99.40 99.40 99.50 Elevation: Top of Pier (t~)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 86.60 85.90 86.10 86.20 86.60 Bearing Stratum (description) Tan & Gray Sand~/Clay Note: See report #176019 for Compressive Strength Test Specimens. · Additional Pene~ation not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided fo*'testing. We assume no responsibility for variation in ~ual~y (composition, appearance, pedormance, etc.) or any other feature of similar subject metter provided by parsons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 176018 Project No.: 037333 Project: Freeport 10 Date of Service: 5/1/2003 500 Freeport Parkway Page 4 of 6 Driller: Liberty Pier Identification BB-7 CC-7 DD-7 EE-7 FF-7 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.80 12.80 12.70 12.90 13.10 Depth of Pier After Underreaming (f~)* 12.80 12.90 12.70 14.00 13.10 Condition of Bottom (wet/~dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Len[Cda (R) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/g6 6/#6 6/#6 6/#6 6/g6 Len~h of Reinforcing Steel (ft) 11.9 12.0 11.8 13.1 12.2 Time Drilling was Completed (am / pm) 1~1:37 AM 11:53 AM 12:01 PM 1:01 PM 1:07 PM Time Concrete was Placed (am / pm) 1:35 PM 1:39 PM 1:45 PM 1:51 PM 2:32 PM Depth of Pier From Top of Concrete (ft) 12.40 12.50 12.20 13.60 12.70 Elevation: Surface (ft)** 99.40 99.40 99.50 99.40 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (f~)** 86.60 86.50 86.80 85.40 86.30 Bearing Stratum (description) Tan & Gray Sandy Clay Note: See report #176019 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. UMITATIONS: The test results presented herein were prepared based upon the specific samples pmvlfled for testing. We assume no responsibility for vaflatico In quality (composition, appearance, performance, etc.) or any other feature of similar subJect matter provided by parsons or condit;ons over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 176018 Project No.: 037333 Project: Freeport 10 Date of Service: 5/1/2003 500 Freeport Parkway Page 5 of 6 Driller: Liberty Pier Identification GG-7 HH-7 HH-8 GG-8 FF-8 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (f0 12.00 12.00 12.00 12.00 1Z00 Depth of Pier Prior to Underreamin$ (f0 12.90 12.60 12.90 12.80 13,00 Depth of Pier After Underreamin~ (f0 * 13.00 12.60 13.20 13.00 13.20 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casinl~ Diameter (in) / Casinl~ Len~h (f0 NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Len~, h of Reinforein~ Steel (f0 12.1 11.8 12.3 12.1 12.4 Time Drillin$ was Completed (am / pm) 1:46 PM 2:17 PM 2:04 PM 2:43 PM 3:12 PM Time Concrete was Placed (am / pm) 2:56 PM 3:00 PM 3:20 PM 3:27 PM 3:33 PM Depth of Pier From Top of Concrete (~) 12.50 12.10 12.80 12.50 12.70 Elevation: Surface (f0** 99.50 99.50 99.40 99.50 99.50 Elevation: Top of Pier (rD** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (f0** 86.50 86.90 86.20 86.50 86.30 Bearin~ Stratum (description) Tan & Gray sandy Clay Note: See report #176019 for Compressive Strength Test,Specimens. · Additional Penetration not requested unless noted. Remarks: ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete ~om existing surface elevation. iLIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for te~ng. We assume no responsibility for variation in quality (composition, appearance, performance, atc.) or any other feature of similar subject matter provided by perso~ls or conditions over which we have no control. Our letters and reports are for the exclusive usa of the clients to whom they are addressed and shall not be reproduced except In full w'~hout the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 176018 Project No.: 037333 ProjeCt: Freeport 10 Date of Service: 5/1/2003 500 Freeport Parkway Page 6 of 6 Driller: Liberty Pier Identification EE-8 DD-8 CC-8 BB-8 Pier Diameter (in) 24 24 24 24 Bell Diameter (in) 66 66 66 66 Required Minimum DePth (ft) 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (fi) 12.60 12.70 12.80 13.20 Depth of Pier After Ur~derreaming (ft)* 13.30 13.10 12.90 13.90 Condition of Bottom (wet / dry) Dry Dry Dry DOt Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 Length 0f Reinforcing Steel (ft) 12.4 12.2 12.0 13.0 Time Drilling was Completed (am / pm) 2:52 PM 2:55 PM 3:20 PM 3:27 PM Time Concrete was Placed (am / pm) 3:39 PM 3:46 PM 3:50 PM 3:58 PM Depth of Pier From Top of Concrete (fi) 12.80 12.60 12.40 13.50 Elevation: Surface (ft)** 99.50 99.50 99.50 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (fi)** 86.20 86.40 86.60 85.50 Bearin~ Stratum (description) Tan & Gray Sandy Clay Note: See report #I 76019 for Compressive Strength Test Specimens. * Additional Pcn¢lxafion not requested unless noted. Remarks: ** - Elevation data not supplied to.Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provk:led for testing. We assume no responsibility for variation in quality (composition, appearance, performance, ®W,,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. Ineers 8908 Ambassador Row, Dalin~, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate ]Phone: (214) 630-9745 REPORT OF DRILLED PIER INSPECTION Client: Duke Realty Services, LP Attn: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Drilled Pier Inspection Report No.: 175777 Project No.: 037333 Date of Service: 04/29/2003 Report Date: 05/05/2003 Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 6 Technician: Rick Smith Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Pacheco Koch Consulting Engineers 6:30 a.m. - 4:45 p.m. (1) Engineering Aaalyst (1) City of Coppell Engineering DepL K. Scott Watson CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99DD Pa~e I of I RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175777 Project No.: 037333 Project: Freeport l0 Date of Service: 4/29/2003 500 Freeport Parkway Page 2 of 6 Driller: · Liberty Pier Identification W-13 W-14 X-14' Y-14 Z-14 Pier Diameter (ia) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreamia~ (ft) 12.60 13.00 13.20 12.80 12.70 Depth of Pier After Underreaming (ft)* 13.10 13.10 13.30 13.20 13.00 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (ft) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/g6 6/g6 l. xm~h of Reinforciag Steel (ft) 12.2 12.2 12.4 12.4 12.2 Time Drilling was Completed (am / pm) 9:46 AM 10:03 AM 10:00 AM 10:16 AM 10:30 AM Time Concrete was Placed (am / pm) 11:45 PM 11:51 PM 11:55 PM 12:00 PM 12:16 PM Depth of Pier From Top of Concrete (ft) 12.60 12.70 12.80 12.70 12.60 Elevation: Surface (ft)** 99.50 99.40 99.50 99.50 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 86.40 86.30 86.20 86.30 86.40 Bearing Stratum (description) Tan & Cn'a~, Sandy Clay Note: See report #175778 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand Section 6 ** - Elevation data not supplied to Roue Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented hamln were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pemons or conditions over which we have no control. Our letters and reports am for the exclusive use of the clients to whom they are addressed and shall not he reproduced except in full without the written approval of Rone Engineers, Ltd. ~RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175777 Project No.: 037333 Project: Freeport 10 Date of Service: 4/29/2003 500 Freeport Parkway Page 3 of 6 Driller: Liberty Pier Identification AA- 14 BB-3 CC-3 DD-3 EE-3 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (tt) 12.00 12.00 1 ZOO 1 ZOO 12.00 Depth of Pier Prior to Undcrreamint~ (11) 13.20 12.90 12.80 13.10 13.10 Depth of Pier After Underreamin~ (fi)* 13.30 13.20 13.00 13.10 13.30 Condition of Bottom (wet / dry) Dry Dry Dry Dry DDt Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casin~ Diameter (in) / Casin~ Length (fi) NA NA NA NA NA Number of Bars / Reinforein~ Bar Size (#) 6/#6 6/#6 6/#6 6/g6 6/#6 Len~h of Reinforcin~ Steel (11) 12.4 12.4 12.1 12.1 12.4 Time Drillin~ was Completed (am / pm) 10:18 AM ll:10 AM 11:32 AM ll:00 AM 11:37 AM Time Concrete was Placed (am / pm) 12:20 PM 12:26 PM l:l 2 PM 1:17 PM 1:22 PM Depth of Pier From Top of Concrete (11) 12.90 12.70 12.50 12.70 12.90 Elevation: Surface (11)** 99.40 99.50 99.50 99.40 99.40 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (11)** 86.10 86.30 86.50 86.30 86.10 Bearin~ Stratum (description) Tan & Gray Sandy Clay Note: See report #175778 for Compressive S~'ength Test Specimens. * Additional Penemition not requested unless noted. Remarks: 12' minimum depth or top of sand ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. AA-14 is Section 6, BB-3 is Section 3 the balance are Section 4. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subJect m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report bio.: 175777 Project NO.: 037333 Project: Freeport 10 Date of Service: 4/29/2003 500 Freeport Parkway Page 4 of 6 Driller: Liberty Pier Identification FF-3 GG-3 ' HH-3 HH-4 GG4 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (It) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreamin$ (ft) 13.20 12.90 12.40 12.50 12.70 Depth of Pier After Underreamin~ (ft) * 13.20 12.90 12.60 12.80 12.70 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casin~ Diameter (in) / Casin~ Lan~h (It) NA NA NA NA NA Number of Bars / Reinfomin~ Bar Size (#) 6/#6 6/#6 6/g6 6/g6 6/#6 Len~h of Reinforeinl~ Steel (ft) 12.1 12.0 11.6 11.9 11.8 Time Drillin~ was Completed (am / pm) 12:14 PM '12:35 PM 12:50 PM 1:15 PM 12:55 PM Time Concrete was Placed (am / pm) 1:26 PM 1:40 PM 1:44 PM 1:49 PM 2:20 PM Depth of Pier From Top of Conerete (ft) 12.80 12.40 12.20 9.80 12.20 Elevation: Surface (It)** 99.40 99.50 99.40 99.50 99.50 Elevation: Top of Pier {ft)** 99.00 99.00 99.00 96.50 99.00 Elevation: Bottom of Pier (it)** 86.20 86.60 86.80 86.70 86.80 Bearin~ Stratum (description) Tan & Gray Sandy Clay Note: See report #175778 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand Section 4 · * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevatibns as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation In :lcelity (composition, appearance, performance, etc.) or any other feature of similar.subject m RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175777 Project No.: 037333 Project: Freeport 10 Date of Service: 4/29/2003 500 Freeport Parkway Page 5 of 6 Driller: Liberty Pier Identification FF-4 EE-4 DD-4 CC-4 BB-4 Pier Diameter (in) , 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.70 12.90 12.90 12.70 12.80 Depth of Pier After Underreaming (fi)* 12.70 13.00 13.00 12.90 13.40 Condition of Bottom (wet / dry) Dry D~ Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA NA, NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/g6 6/#6 6/#6 Length of Reinforcing Steel (fi) 11.8 12.0 12.1 12.0 12.4 Time Drilling was Completed (am / pm) 1:28 PM 1:38 PM 2:07 PM 2:14 PM 2:34 PM Time Concrete was Placed (am / pm) 2:30 PM 2:37 PM 2:42 PM 2:47 PM 2:54 PM Depth of Pier From Top of Concrete (ft) 12.20 12.60 12.50 12.50 10.40 Elevation: Surface (fi)** 99.50 99.40 99.50 99.40 99.50 Elevation: Top of Pier (fi)** 99.00 99.00 99.00 99.00 96.50 Elevation: Bottom of Pier (fi)** 86.80 86.40 86.50 86.50 86.10 Bearing Stratum (description) Tan & Gray Sand~, Clay Note: See report #175778 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. BB-4 is Section 3 the balance are Section 4 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided fo~ testing. We assume no responsibility for vaflaflon in quality (composition, appearance, pedormance, etc.) or any other feature of similar subJect rn RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175777 Project No.: 037333 Project: Freeport 10 Date of Service: 4/29/2003 500 Freeport ParkwaY Page 6 of 6 Driller: Liberty Pier Identification BB-5 CC-5 DD-5 EE-5 Pier Diameter (in) 24 24 24 24 Bell Diameter (in) 66 66 66 66 Required Minimum Depth (ii) 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (fi) 12.10 13.00 12.90 12.90 Depth of Pier After Underreaming (ti)* 12.30 13.10 13.70 13.60 Condition of Bottom (wet / dry) D~ Dry Dr7 Dr~ Plumb Within Tolerance ()'es / no) Yes Yes Yes Yes Casing Diameter (in) / Casing Len~ah (ii) NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 Len~h of Reinforcing Steel (ii) 11.4 12.2 12.6 12.7 Time Drilling was Completed (am / pm) 2:43 PM 3:12 PM 2:47 PM 2:16 PM Time Concrete was Placed (am / pm) 3:29 PM 3:33 PM 3:37 PM 3:55 PM Depth of Pier From Top of Concrete (ii) 9.40 12.70 13.20 13.10 Elevation: Surface (ii)** 99.40 99.40 99.50 99.50 Elevation: Top of Pier (It)** 96.50 99.00 99.00 99.00 Elevation: Bottom of Pier (ii)** 87.10 86.30 85.80 85.90 Bearing Stratum (description) Tan & Gray Sand)' Clay Note: See report #175778 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. BB-5 is Section 3 the balance are Section 4 LIMITATIONS: The test resdlts presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject m R°neEngine6 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214} 630=9745 REPORT OF DRILLED PIER INSPECTION CHent: Duke Realty Services, LP Atto: Mr. JeffLangston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Drilled Pier Inspection Report No.: 175689 Project No.: 037333 Date of Service: 04/28/2003 Report Date: 05/05/2003 Report of Inspection On this date, a Rone Engineers, Ltd..representative(s) was on site to perform Drilled Pier Inspection. The results are attached. Technician Time: Page 1 of 7 Technician: Rick Smith Report Distribution: (I) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (I) Panheco Koch Consul~g Engineers 6:30 a.m. - 4:15 p.m. (1) Engine-'ins Analyst (1) City of Coppell Engineering Dept. K. Scott Watson CMT Operations Manager LIMITATIONS: The test ~s%dm p~-~nted herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by pemons or conditions over which we have no control. Our letters and reports are for the exclusive use of the cheats to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc Engineers, Lid. 99DD PaRe 1 of 1 RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.: 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parkway Page 2 of 7 Driller: Liberty Pier Identification AA-9 Z-9 Y-9 Y- 10 Z- 10 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (fi) 12.00 12.00 12.00 12;00 12.00 Depth of Pier Prior to Underreaming (ii) 13.10 12.90 13.00 12.80 13.10 Depth of Pier After Underreaming (ft) * 13.20 12.90 13.70 13.20 13.50 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (fi) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (~ 6/g6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (ii) 12.3 12.0 12.8 12.4 12.5 Time Drilling was Completed (am / pm) 8:19 AM 8:34 AM 8:41 AM 9:03 AM 9:02 AM Time Concrete was Placed (am / pm) 10:16 AM 10:20 AM 10:24 AM 10:46 AM 10:50 AM Depth of Pier From Top of Concrete (ft) 12.80 12.40 13.30 12.60 13.00 Elevation: Surface (ti)** 99.40 99.50 99.40 99.60 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ii)** 86.20 86.60 85.70 86.40 86.00 Bearin~ Stratum (descriptionI Tan & Gray Sandy Clay Note: See report #175690 for Compressive Strength Test Specimens. · Additional Penetration not requested unless noted. Remarks: · 12' minimum depth or top of sand, whichever comes first · * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated u. sing specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. UMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, pa~ermanco, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control, Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except In full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.: 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parkway Page 3 of 7 Driller: Liberty I ~ Pier IdentificatiOn AA-10 AA-11 Z-11 Y-11 X-9 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (fi) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (It) 13.00 12.40 12.40 12.90 12.60 Depth of Pier After Underreaming (fi) * 13.50 12.40 12.50 13.00 13.00 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Length (It) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (fi) 12.7 11.6 11.6 12.1 12.0 Time Drilling was Completed (am / pm) 9:30 AM 9:37 AM 9:50 AM 10:01 AM 10:08 AM Time Concrete was Placed (am / pm) 10:56 AM 11:00 AM 11:20 AM 11:26 AM 11:35 AM Depth of Pier From Top of Concrete (fi) 13.10 11.90 12.00 12.40 12.50 Elevation: Surface (fi)** 99.40 99.50 99.50 99.60 99.50 Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (fi)** 85.90 87.10 87.00 86.60 86.50 Bearinl~ Swamm (description) , Tan & Gray Sand~, Cla~ Note: See report #175690 for Compressive S~rength Test Specimens. · Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand, whichever comes first · * - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom 0fpier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results'presented herein v~re prepared based upon the specific samples p~ovlded for testing. We assume no responsibility for variation in quality (oompositlon, appearance, pedormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed end shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.: 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parl~way Page 4 of 7 Driller: Liberty Pier Identification X-10 X-11 W-9 W-10 W-11 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreaming (ft) 12.70 12.70 12.90 12.80 12.60 Depth of Pier Alter Underreaming (f~)* 12.70 13.00 12.90 13.00 12.90 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (y~es / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Len~la (it) NA NA NA NA NA Number of Bars / Reinforcing Bar Size (#) 6/g6 6/g6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (it) 11.9 12.1 12.0 12.2 12.0 Time Drilling was Completed (am / pm) 10:31 AM 10:56 AM 11:00 AM 11 :l 7 AM 11:32 AM Time Concrete was Placed (am / pm) 12:00 PM 12:04 PM 12:i0 PM 12:35 PM 12:39 PM Depth of Pier From Top of Concrete (it) 12.20 12.60 12.40 12.60 12.40 Elevation: Surface (it)** 99.50 99.40 99.50 99.40 99.50 Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (it)** 86.80 86.40 86.60 86.40 86.60 Bearing Stratum (description) Tan & Gray Sandy Clay Note: See report #175690 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand, whichever comes first ** -.Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were pmparsd based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and mporte am for the exclusive use of the clients to whom they ars addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.:" 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parkway Page 5 of 7 Driller: Liberty Pier Identification W- 12 X- 12 Y- 12 Z- 12 AA- 12 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 Required Minimum Depth (it) 12.00 12.00 12.00 12.00 12.00 i Depth of Pier Prior to Underreaming (it) 12.90 12.90 12.60 12.70 12.60 Depth of Pier Aiter Underrearning (it)* 13.20 12.90 12.70 13.20 12.70 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casing Len~h (fi) NA NA NA NA NA Number of Bars / Reinforcing Bar Size(#) 6/#6 6/g6 6/#6 6/#6 6/#6 Length of Reinforcing Steel (it) 12.3 12.0 11.8 12.3 11.8 Time Drilling was Completed (am / pm) 11:38 AM 12:40 PM 12:46 PM 12:56 PM 1:24 PM Time Concrete was Placed (am / pm) 12:44 PM 1:00 PM 1:47 PM 1:53 PM 1:56 PM Depth of Pier From Top of Concrete (it) 12.70 12.50 12.20 12.70 12.20 Elevation: Surface (it)** 99.50 99.40 99.50 99.50 99.50 Elevation: Top of Pier (it)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (it)** 86.30 86.50 86.80 86.30 86.80 Bearing Stratum (description) Tan & Gray Sandy Clay Note: See report #175690 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand, whichever comes first ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we hava no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shell not be reproduced except in full without the written approval of Rone Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.: 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parkway Page 6 of 7 Driller: Liberty Pier Identification W-8 X-8 Y-8 AA- 13 Z- 13 Pier Diameter (in) 24 24 24 24 24 Bell Diameter (in) 66 66 66 66 66 ~ Required Minimum Depth (ft) 12.00 12.00 12.00 12.00 12.00 Depth of Pier Prior to Underreamin~ (f~) 13.10 13.20 12.80 12.80 12.80 Depth of Pier After Underreamin8 (ft)* 13.40 13.90 13.60 12.80 13.00 Condition of Bottom (wet / dry) Dry Dry Dry Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Yes Yes Yes Casing Diameter (in) / Casinl~ Length (ftc) NA NA NA NA NA Number of Bars / Reinfoming Bar Size (#) 6/#6 6/#6 6/#6 6/#6 6/#6 Len~h of Reinforcing Steel (ft) 12.5 13.0 12.7 12.0 12.1 Time Drilling was Completed (am / pm) 1:35 PM 1:40 PM 1:55 PM 2:24 PM 2:34 PM Time Concrete was Placed (am / pm) 2:00 PM 2:03 PM 2:18 PM 3:06 PM 3:10 PM Depth of Pier From Top of Concrete (ft) 13.00 13.40 13.20 12.40 12.50 Elevation: Surface (ft)**. 99.40 99.50 99.40 99.40 99.50 Elevation: Top of Pier (f~)** 99.00 99.00 99.00 99.00 99.00 Elevation: Bottom of Pier (ft)** 86.00 85.60 85.80 86.60 86.50 Bearing Stratum (description) Tan & Gray Sandy Cla~' Note: See report #175690 for Compressive Strength Test Specimens. * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand, whichever comes first ** - Elevation data not supplied to Roue Engineers. Noted surface, top 0fbearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. uMrrATIONS: The test results presmlted herein were prepared based upon the specific samples i:xovided for testing. We assume no responsibility for vaflatlon in quality (compasSion, appearance, performance, etc.) or any other feature of similar subjec~ matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rona Engineers, Ltd. RONE ENGINEERS, Ltd. REPORT OF BELLED PIER INSPECTION Client: Duke Realty Services, LP Report No.: 175689 Project No.: 037333 Project: Freeport 10 Date of Service: 4/28/2003 500 Freeport Parkway Page 7 of 7 Driller: Liberty Pier Identification Y- 13 X- 13 Pier Diameter (in) 24 24 Bell Diameter (in) 66 66 Required Minimum Depth (ft) 12.00 12.00 Depth of Pier Prior to Underreaming (f~) 13.00 13.20 Depth of Pier After Underreaming (it)* 13.00 13.60 Condition of Bottom (wet / dry) Dry Dry Plumb Within Tolerance (yes / no) Yes Yes Casing Diameter (in) / Casing Len~da (It) NA NA Number of Bars / Reinfoming Bar Size (#) 6/g6 6/#6 Len~h of Reinforcing Steel (f0 12.1 12.7 Time Drilling was Completed (am / pm) 2:53 PM 2:51 PM Time Concrete was Placed (am / pm) 3:14 PM 3:35 PM Depth of Pier From Top of Concrete (f0 12,60 13.10 Elevation: Surface (ftC** 99.40 99.50 Elevation: Top of Pier (ft)** 99.00 99.00 Elevation: Bottom of Pier (ft)** 86.40 85.90 iBearing Stratum tdescription) Tan & Gray Sandy Clay ~lote: See report #175690 for Compressive Strength Test Specimens, * Additional Penetration not requested unless noted. Remarks: 12' minimum depth or top of sand, whichever comes first ** - Elevation data not supplied to Rone Engineers. Noted surface, top of bearing stratum, and bottom of pier elevation data calculated using specified top of pier elevations as shown on the project drawings and measurement of actual top of concrete from existing surface elevation. .IMITATIONS: The test results presented herein were prepared based upon ~he specific samples provided for testing. We assume no responslrolllty for variation In quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. lOut letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of IRone Engineers, Ltd.