Meadows Addn 6-AG 900123Rc°v. 4-14-89
PPELL
r ~ ~~ ~~„~
A~ENC?A REf,~UEST Ft~t~M
CITY COUNCIL MEETING- Januar 23, 1990 ITEM NO. ~ %.~
~-,-i I c'U ~.
? Ft d -15-90
Discussion and consideration of approval o~i~tility and drainage easements on Meadows Section
VI Phase I.
SUBMITTED BY:
EVALUATION OF ITF~t:
}~/ ~~ STAFF REP.: Russell Doyle, City Bngineer
ctur s Signature)
OTHER REP.: Kevin Kendrick, Paul S. Unzicker~
DATE: January 11,1990
Attached for your consideration are 4 utility and drainage easements. As explained in the
attached letter from Mr. Kendrick, the easements are required for installation of utilities
and continuation of drainage as it relates to the Bleadows Section VI Phase I.
Staff recommends approval.
AF'~C~ ~
~~
CITY C~ It1C L
Da T E 90
BUDGET AMT.: AMT. ESTIMATED: AMT. +/- BUDGET:
COMMENTS: FINANCIAL REVIEW BY:
LEGAL REVIf'W BY:
AGENDA REQ FORM
0588DS
~~
REVIEWED BY CM:
PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
8700 STEMMONS FREEWAY, SUITE 4OO
DALLAS. TExns 75247
(214) 634-3300
January 16, 1990
Ms. Shohre Daneshmand, P.E.
City of Coppell
Department of Public Works
P.O. Box 478
Coppell, Texas 75019
Re: Meadows Section Six - Phase One
Coppell, Texas
86062-0
Dear Shohre:
Please delete item number four (4) from my letter to you dated January
11, 1990. This easement will be provided once these lots fronting
Parkway Boulevard have been platted. It is my understanding that TU
Electric will not place street lights in Parkway Boulevard until a
plat has been filed.
If you have any other questions regarding these easements, please feel
free to call.
Sincerely,
~~ _ ~f
Kevin R. Kendrick, P.E.
Project Manager
KRK/bp
cc: Mr. Gordon Jones / D.T. Construction
n~~~~_
~~
PAUL S. UNZICKER, P.E. DAVID M. SCHNURBUSCH, P.E.
President Vice President
•l
PAUL S. UNZICKER, INC.
CONSULTING ENGINEERS
5700 STEMMONS FREEWAY, SUITE .400
DALLAS, TExns 75247
(214) 634-3300
January 11, 1990
Ms. Shohre Daneshmand, P.E.
City of Coppell
Department of Public Works
P.O. Box X78
Coppell, Texas 75019
Re: Meadows Section Six - Phase One
Coppell, Texas
86062-0
Dear Shohre:
~ ~ ~ < J
i i
r ' f/i l
---- ~
Per our telephone conversation this past Tuesday, please find below an
itemized listing of the offsite easements needed for the referenced
development. These easements were executed by the owner, IQr. Gler.
Hinckley, for the purposes shown in the following list.
1) Five foot- Utility Easement along most NortYYerly alley.
This easement was required by City Staff. Since the owner of
Meadows Section Six - Phase One owns the land just to the North
alley Right-of-Way, an easement was required just as they are
shown on all internal alleys (i.e. all alleys within the
subdivision were required to have five foot utility easements on
either side of all the Right-of-Way).
2) Drainage Easement located near Meadow Run and the most Northerlv
alley of this development.
This easement should have been obtained when the original storm
sewer system was constructed. We obtained this easement from Mr.
Hinckley because the existing storm sewer system in which our
development feeds into crosses private property. I would suggest
you review the Engineering Plans for the location of this storm
sewer system.
3) Ten foot Utility Easement located 223.35 feet West of Meadow Run
atd Parkway Boulevard.
This easement was obtained from Mr. Hinckley for the purposes of
constructing a Sanitary Sewer line and a Storm Sewer line which
serves the referenced development. It has been located such that
the center of the easement will fall on the property line of Lots
10 and it of Block J of the Meadows Section Sir. - Phase Two
Addition (future development). Mr. Hinckley is currently
studying the possible platting of this addition.
PAUL S. UN7.ICKE12, P.G. UAVID M. SCFINU)iBUSCII, Y.E.
President Vice President
.- ,~
Ms. Shohre Daneshmand
January 11 , 1990 ~~ ~1M K ,
Page 2
No ~_ ~-~- II II 1l . /
(~~ ~i+5 eaCe ~v~e~' wa5 no~ SJb m ~ ~}e.~, c~..~ i f rev ~C ~C ~e ~~ ~ '~uo '~ww ~ ~ *~" (~~/wl4wew,~
~4) Five foot Utility Easement located between Lots 18 and 19, Block~~y~
J, near the intersection of Parkway $oulevard and Samuel l
Boulevard.
Na,`, This easement was requested by TU Electric for the purposes of
installing a street light in Parkway Boulevard. Please find
~~' attached a copy of TU Electric's electrical plan indicating their
request for this easement. If you have any questions, please
call Tim Brancheau with TU Electric at (214) 323-8910.
5) Ten foot by ten foot Utility Easement located near the Northeast
corner of Lot 22, Block J, of this development.
This easement was also requested by TU Electric. Please see
their electrical service plan for clarification.
If you have any other questions regarding these easements, please feel
free to call.
Sincerely,
i!y~~
Kevin R. Kendrick, P.E.
Project Manager
KRK/bp
cc: Mr. Gordon Jones / D.T. Construction
,~
~~
~- I ~~ ~
1
a '; L~ I
[imi/s OF
Proposed I .-;.~.I.,I_.I
~eakouf I ' ~ 1 I
;F ~!~`~
Gre>'c Sha/~
~re C4~fyed
F A//ey ~
i0'Pavemenf
f T -1 ~ t~
~ I~\~+~
L~ Jr
----J !~
Top o~fc ~ A//cy /revert
~-- Ai/ey /rev
//®rr°a~kout EivS~ing
A
/ariab/c A//cy
Th,~ness
,PGin~ Ca'K•
~m~/oS~..CONCY~~
Bars e /2"Ccn/cr5
e
~4 Bsrs Ga /2"Cen ~~~~
6, .: ~. a,
~ ::
5u~gde -. ~.
:.
~.
SECT/O~t! 'A 4 ~'
N.T.S
Gcners/ ,votes:
,see Sheet
Z A// ~Peinforc
~ A// C ncrel~
22 Of 26 For Additions/ Grafe Detdi/s
in9 5'ha// 6e No. 4 ,Bars A5 5horun.
6ha// Nave A Minimum Sfrer~fh C1F
~~~~gb. ~~ 58c,~ Concrete)
II V ~ ~ ~ ~KEVINKE~NDgICK
~~ o;tt9 6~48Y
^74 ~ LO 4. iI
O/ZATE /it/L ET MOD/F/CHIT/ON DET4/G
MEADOK/5 6ECT~ON 5YX PH.45'E ONE
N.TS.
r'
q
0
~O~
Z~~O
^~~
~~
o
~ ~n ~Z
y ^ao ~~
C~Z~~
a~~~o~
~V~ ~ rn
Z~~~
G'~~
rn
54,. .1EG
BLVD. ig
~~
~~
r -~~
I Z
N N \0
`-~ ~ ~ ,
w c
- ~ ~ ~
~ ~
q~ ~ ~
~, `! - ~o
~o ~ ~ ~
~~ ~ _ ~ ~
N ~ - o
~~ p ~ ~
^F.
~j~ ~ so
~~ ~ ~
~0 ~ ~ O
I"^~I ~
~ N
_ V
~ ~
- -- ~ Oo
f0 -
_J N
~~ i; ~ ~1
'' -~
w I ~ \ ~
N
~_
~- ~
~ ~ I ~ I v
MEQOO w 2uN
~~
\~I
o
~~
N~~
n
~ ~.
c~
~~
~~ ..~
AW p O
v ~` ~ ~
'~ ~~~ g
Sfi rn
I8-~,~
1,
~~ `
;o ~
i~ ~
6`
~~
~J
O
N~
~.
~~
w
a
a
3
(D
w
0.
O
E
00
a
b
.,
0
b
M
r
N
0
N~
N
~c
b
~.
~-
w
N ~~
~~
A~
N ~v ~
~I
O (y
~ ~
v -
N
N
r