Loading...
PA9702-LR 990728 (2)CONCRETE COMPREr' ' SIVE STRENGTH TES? 8901 Carpenter Frwy, SuRe #100 Dallas, Texss 75247 Dateof Service: 07/19/1999 Report No.: 9919534 Report Date 07/28/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co 11 Project: Coppell Aquatic/Recreation Ctr Attn: Bra~e~id 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~)6051 Services: Obtain samp~es ~f fresh c~ncrete at the p~acement ~ocati~ns~ pe~rm required ~e1d test and cast compresslye strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCREr~SUPPLIER: Nelson Brothers pLACEMENT DATE: 07/19/1999 BATCH TItlE: 3:47am PLANT: NLA, TIME SAMPLED: 4~ 30am BY: Lee Savage SPECIFICATION REQUIRElVlENTS WEATHER CONDITIONS: WarlTl S~,~NG~4: 4000 psi @ 28 Days TEMPEnA~n~ (r) - Am 78 F CONCHETE: 94 F SLUMP: 3-5" TnUCK NO: 224 TICKET NO: 75 154 Am: 3-6% AmCONT~NT(~): 4.2 vsrrWEiGwrCoct~: N/A TEST METhOD: ASTM C-143 PLACEMENT LOCATION: Paving ASTM C-172 ASTM C-39 SAMPLE LOCATION: 100' N, 5' E of W approach REPORT OF TESTS Acc sr LA qvn VAnOS: 10 CYLINDER MEASURED MAXIMUM COMERE~SIVE MARKED SLUI~P DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE I 1 4.00 07/26/1999 7 146300 5 170 1 2 4.00 07/26/1999 7 134260 4750 Average 4960 1 3 4.00 08/16/1999 28 1 4 4.00 08/16/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wrinen approval of H BC Eagineering, Inc. 0ILL Page I of 4 CONCRETE COMPREC $IVE STRENG TES TH 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/19/1999 Report No.: 9919534 Report Date 07/2811999 Client No.: COPPELL Project No.: 94991118 Client: City of Co pell Project: Coppell Aquatic/Recreation Ox Attn: Bra~PReid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samp~es ~f fresh c~ncrete at the p~a~ement ~ocati~ns~ pe~~nn required ~e~d test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers pLACEIVIENTDATE: 07/19/1999 BATCH TIME: 5:12am PLANT: N/A T1ME SAMPLED: 5:50am BY: 12e Savage SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: WalTi1 STRESGTn: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 78 F CONCRETE: 94 F SLUMP: 3-5" TRUCK NO: 221 TICKET NO: 75165 Am: 3-6% AIRCONTENT(%): 4.0 UMTWEIGHT(peg): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: 100' N, 100' E of W approach REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ibs. force) (psi) TYPE 2 1 5.00 07/26/1999 7 131500 4650 2 2 5.00 07/26/1999 7 127700 4520 Avenge 4590 2 3 5.00 08/16/1999 28 2 4 5.00 08/16/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Enginering, Inc. 0ILL Page 2 of 4 CONCRETE COMPREC SIVE STRENGTH TES ENGINId,,'~dI',I3, INC. 8901 Carpenter Frwy., Suite #100 Dallas, Texas 75247 Date of Service: 07/19/1999 Report No.: 9919534 Repor~ Date 07/28/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. ~96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCUE'rE SUPPL~E: Nelson Brothers PLACEM~rr nAT~: 07/19/t999 RATCn TE~m: 6: 10am PLANT: N/A TIME SAMPLED: 7:50am BY: Lee Savage SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: WarIll STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - Am 80 F CONCRETE: 96 F SLUMP: 3-5" TRUCK NO: 271 T~CKET NO: 75 194 Am: 3-6% AIR CONTENT(%): 3.9 UUrrWgIGHT(pc0: N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page I ASTM C- 172 ASTM C-39 SAMPLE LOCATION: 120' N, 130' E of W approach REPORT OF TESTS ACCUm~ATrVEYARnS: 10 CYLINDER MEASURED MAXIMUM COMPRESSlYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ib~ force) (psi) TYPE 3 1 5.00 07/26/1999 7 135010 4770 3 2 5.00 07/26/1999 7 133570 4720 Average 4750 3 3 5.00 08/16/1999 28 3 4 5.00 08/16/1999 28 This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the vaitten approval of HBC Engineering, Inc. 0ILL Page 3 of 4 r CONCRETE COMPREoSIVE STRENGTH TES 8901 Carpenter Frwy., Suit~ #100 Dallas~ Texas 75247 Date of Service: 07/19/1999 Report No.: 9919534 Report Date 07/28/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co peil Project: Coppoll Aquatic/Recreation Ctr Attn: Bra~Rcid 300 Block of Parkway Blvd 732 DeForest Coppcll TX 75019 Coppell, Tcxas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast comprcssive strength samples. PROJECT DATA CO~rrRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers pLACEMENT DATE: 07/19/1999 BATCH TIME: 9:40a111 PLANT: N/A Tn4E SAMPLED: 10:25am BY: Lee Savage SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Hot STRENGTH: 4000 psi @ 28 Days TEMPERATURE CF) - AIR 85 F CONCRETE: 98 F SLtrMP: 3-5" TRUCK NO: 218 TICKET NO: 75201 AIR: 3-6% AIR CONTENT(%): 4.3 UNrrWEiGh-'r(pe.f): N/A T~ST METHOD: ASTM C-143 pLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: East fire lane REPORT OF TESTS ACCUMULATIVE YARDS: 10 CYLINDER MEASURED MAXIMUM COMPRESSlYE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 4 1 6.00 07/26/1999 7 117570 4160 4 2 6.00 07/26/1999 7 119140 4210 Average 4190 4 3 6.00 08/16/1999 28 4 4 6.00 08/16/1999 28 Technician: Lee Savage Started: 3:00am Finished: l l:30am ~ Engineering, Inc. (1) City of Coppell (1) City ofCoppcll - Engineering (1) Bdnkley Sargent Arckitects (1) City ofCoppell - Bldg. lnsp. Engelle Hatbout (1) Turner Engineers (1) City ofCoppell - Leisun Serv Dept Vice President (1) Hisaw & Associates This repoa is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriaeu approval of HBC Eaginecdug, Inc. OILL Page 4 of 4 W