SS9901-EM030306972 7 =5 30 D2
HPF =tr, 2DD 11 25 FF' TI_IF'NER 1 - 1 ILL 2PAIJEH972 735 30D2 TO c^D4557D P. D1"'D5
17300 Dallas Parkway
Suite 1010
Dallas, Texas 75248
TurnerCollie Brade Inc gax7972l735 - 3001
Engineers • Planners • Project Managers
DATE. March 6 2003
# OF PAGES ( including this a e : 6
TO: Ken Griffin, P.E.
FAX NUMBER: 972 -304 -3570
City-of Co ell
FROM: Erika Cooper
PHONE NUMBER: 9721735 -3056
(if transmittal is incomplete or unclear, please
call sender directly at this number.)
REMARKS:
Ken,
Ted asked me to fax you the attached construction cost estimates for Force Main Line
D for your review. We included five options.
1 Ductile iron force main installed by open cut with vertical pipe loop at Sandy Lake
Lift Station and boring under trees
2. Ductile iron force main installed by open cut with vertical pipe loop at Sandy Lake
Lift Station and replacement of trees
3. HDPE force main installed by open cut with vertical pipe loop at Sandy Lake Lift
Station and boring under trees
4. HDPE force main installed by open cut with vertical pipe loop at Sandy Lake Lift
Station and replacement of trees
5. HDPE force main installed by direction drilling
The estimates are preliminary and were obtained primarily from local contractors.
Although we cannot guarantee actual construction costs will exactly match these
estimates, the estimates should provide sufficient accuracy to compare the five options
evaluated. Feel free to call me at 972 - 735 -3056 or Ted at 972 - 735 -3048 if you have
any questions. We look forward to discussing these estimates with you at your
convenience.
Thank you.
&A" ( �
An AECOM Company
DEFOREST ROAD
LIFT STATION IMPROVEMENTS
FORCE MAIN LINE D
CONSTRUCTION COST ESTIMATE
Option 1 - DJ Pipe by Open Cut w/Verticai Pipe Loop (bore under trees)
Item No.
Description
Unit
Quantity
Unit Price
Total
1
30" DI Force Main by open out (cement - lined, poky- wrapped, restrained)
LF
5879
$125
$734,875
2
30" DI Force Main by bore with 48'' steel encasement
LF
2856
$550
$1,570,800
3
Ductile Iron Fittings
TN
32.86
$8,000
$262,840
4
Vertical pipe loop (30" DI pipe, 20 ft tall wlconcrete base)
LS
1
$15,000
$15,000
5
4" Combination A/V Valve
EA
11
$3,000
$33,000
6
Precast MH (5' diameter, approx 5 -10 It deep)
EA
10
$5,800
$58,000
7
Sod (assume 10' trench width)
SY
4936
$400
$19,744
8
Replacelrelocate irrigation lines, other underground utilities
LS
1
$25,000.00
$25,000
9
Traffic Control
LS
1
$5,000
$5,000
10
Storm Water Pollution Prevention
LS
1
$11,500
$11,500
Sub -Total
$2,735,759
10%
Contingency
$273,576
Estimated Construction Duration: 300 calendar days
Total
$3,009,335
3
D
T
C
cn
CD
ry
s
City of Coppell Coppel Line D- Construction Estimate 02 -28 -03
Line D Page 1 of 5 February 24, 2003
DEFOREST ROAD
LIFT STATION IMPROVEMENTS
FORCE MAIN LINE D
CONSTRUCTION COST ESTIMATE
Option 2 - Dl Pipe by Open Cut wNertical Pipe Loop (replace frees)
Item No.
Description
Unit
Quantity
Unit Price
Total
1
30" DI Force Main by open cut {cement-lined, poly - wrapped, restrained)
LF
6629
$125
$828,625
2
39'01 Force Main by bore with 48" steel encasement
LF
2106
$550
$1,158,300
3
Ductile Iron Fittings
TN
32.86
$8,000
$262,840
4
Vertical pipe loop (30'' DI pipe, 20 ft tall wlconcrete base)
LS
1
$15,000
$15,000
5
4" Combination AN Valve
EA
11
$3,000
$33,000
6
Precast MH (5' diameter, approx. 5 -10 ft deep)
EA
10
$5,800
$58,000
7
Replace trees
EA
25
$750
$18,750
8
Replacelrelocate irrigation lines, other underground utilities
LS
1
$25,000.00
$25,000
9
Sod (assume 10' trench width)
SY
5770
$4.00
$23,080
10
Traffic Control
LS
1
$5,000
$5,000
11
Storm Water Pollution Prevention
LS
1
$12,500
$12,500
Sub -Total
$2,440,095
10%
Contingency
$244,010
Estimated Construction Duration. 300 calendar days
Total
$2,684,105
v
ILI
in
_1,
z
z
M
au
�
fU
LJ
A
(.J
C.9
L9
l9
CJ
m
JI
City of Coppell Coppel Line D- Construction Estimate 02 -2803
Line D Page 2 of 5 February 24, 2003
DEFOREST ROAD
LIFT STATION IMPROVEMENTS
FORCE MAIN LINE D
CONSTRUCTION COST ESTIMATE
Option 3 - HPDE Pipe by Open Cut (bore under trees)
Item No.
Description
Unit
Quantity
Unit Price
Total
1
30" HDPE Force Main by open cut (SDR 21)
LF
5879
$160
$940,640
2
30" HDPE Force Main by bore (no encasement)
LF
2856
$500
$1,428,000
3
HOPE Fittings
30" 45 deg Elbow
EA
11
$3,900
$42,900
30" 30 deg Elbow
EA
2
$3,400
$6,800
30" 22.5 deg Elbow
EA
8
$3,300
$26,400
30 '11.25 deg Elbow
EA
13
$3,000
$39,000
30" x 18" Branch Saddle
EA
11
$4,500
$49,500
30" Flange Adapter w! Back -up Ring
EA
2
$3,200
$6,400
18" Flange Adapter w1 Back -up Ring
EA
11
$2,700
$29,700
4
4" Combination AN Valve
EA
11
$3,000
$33,000
5
Precast MH (5' diameter, approx. 5 -10 ft deep)
EA
10
$5,800
$58,000
6
Replacelrelocate irrigation lines, other underground utilities
LS
1
$25,000.00
$25,000
7
Sod (assume 10' trench width)
SY
4936
$4.00
$19,744
8
Traffic Control
t_S
1
$5,000
$5,000
9
Storm Water Pollution Prevention ($2500 for plan, $1.501LF silt fence)
LS
1
$11,500
$11,500
Sub -Total $2,721,584
10 % Contingency $272,158
Estimated Construction Duration: 300 calendar days
City of Coppell
Line D Page 3 of 5
Total $2,993,742
Coppel Line D- Construction Estimate 02 -28 -03
February 24, 2003
D
aJ
J�
J1
m
CD
A
D
J)
7
0
cn
CD
C)
City of Coppell Coppei Line D- Construction Estimate 02 -28 -03
Line D Page 4 of 5 February 24, 2003
3
D
DEFOREST ROAD
A
LIFT STATION IMPROVEMENTS
s
FORCE MAIN LINE D
CONSTRUCTION COST ESTIMATE
Option 4 - HPDE Pipe by Open Cut (replace trees)
Item No.
Description
Unit
Quantity
Unit Price
Total
c
1
30" HDPE Force Main by open cut (SDR 21)
LF
6629
$160
$1,060,640
2
30" HDPE Force Main by bore (no encasement)
LF
2106
$500
$1,053,000
73
3
HDPE Fittings
30" 45 deg Elbow
EA
11
$3,900
$42,900
0
F-
3 0"
30 deg Elbow
EA
2
$3,400
$6,800
m
30" 22.5 deg Elbow
"11
EA
8
$3,300
$26,400
30 -25 deg Elbow
EA
13
$3,000
$39,000
70
30" x 18" Branch Saddle
EA
11
$4,500
$49,500
m
30" Flange Adapterw! Back -up Ring
EA
2
$3,200
$6,400
18" Flange Adapter w/ Back-up Ring
g P P 9
EA
11
$2,700
$29,700
D
n
4
4" Combination AN Valve
EA
11
$3,000
$33,000
5
Precast M (5' diameter, approx. 5 -10 ft deep)
EA
10
$5,800
$58,000
6
Replace Trees
EA
25
$75C
$18,750
7
Replace /relocate irrigation lines, other underground utilities
LS
1
$25,00000
$25,000
°m
8
9
Sod
Traffic Control
SY
5770
$4
$23,080
N
10
Storm Water Potlution Prevention ($2500 for plan, $1.50/LF silt fence)
LS
LS
1
1
$5,000
$12,500
$5,000
$12,500
�,'
_j
Sub-Total
$2,489,670
N
Ld
10%
Contingency
$248,967
A
Estimated Construction Duration: 300 calendar days
Total
$2,738,637
- .a
m
7
0
cn
CD
C)
City of Coppell Coppei Line D- Construction Estimate 02 -28 -03
Line D Page 4 of 5 February 24, 2003
0
0
D
r
v
m
m
m
DEFOREST ROAD
LIFT STATION IMPROVEMENTS
FORCE MAIN LINE D
CONSTRUCTION COST ESTIMATE
Option 5 - HPDE Pipe (Directional Drilling)
item No.
Description
Unit
Quantity
Unit Price
Total
1
30" HOPE Force Main by directional drilling
Material (30" DIPS DR 17)
LF
7932
$60
$475,920
Installation
LF
7932
$150
$1,189,800
2
Excavationfbackfill of access pits
EA
12
$15,000
$180,000
3
30" HDPE Force Main by open cut (SDR 21)
LF
803
$160
$128,480
4
HDPE Fittings
30" 45 deg Elbow
EA
6
$3,900
$23,400
30" x 18" Branch Saddle
EA
5
$4,500
$22,500
30" Flange Adapter w! Back -up Ring
EA
2
$3,200
$6,400
18" Flange Adapter w! Back -up Ring
EA
5
$2,700
$13,500
5
Hydrostatic testing of HDPE piping
LS
1
$15,000
$15,000
6
4'' Combination A1V Valve
EA
5
$3,000
$15,000
7
Precast MH (6' diameter, approx 25 ft deep)
EA
5
$8,500
$42,500
8
Sod
SY
1680
$4
$6,720
9
Traffic Control
LS
1
$5,000
$5,000
10
Storm Water Pollution Prevention ($2500 for plan, $1.50/LF silt fence)
LS
1
$10,000
$10,000
Sub -Total
$2,134,220
10% Contingency
$213,422
Estimated Construction Duration: 150 calendar days
Total
$2,347,642