SW0001-CS030328J4
WEEKLY PROJECT STATUS REPORT
DATE: March 24 — March 28, 2003 PROJECT NO.:
CLIENT: City of Coppell BY:
PROJECT: Riverchase Elementary School REVIEWED BY:
Date Item
2230 - 01.148
Bradley J. Moss
Steve A. Markussen
03/25 1. Chris Brasch (Acurrate Services (817) 685 -0872) called and explained that 2 out of the 3
controlling points onsite have been destroyed. He requested an AutoCAD drawing to
assist him in finding the horizontal control. BJM emailed Chris the drawing. Chris called
requesting a field crew to reset horizontal control monumentation. BJM explained that PK
needed authorization from the City to reset control monuments.
cc: City of Coppell — Kenneth Griffin
BJM /slt
2230 -38