Loading...
SW0001-CS030328J4 WEEKLY PROJECT STATUS REPORT DATE: March 24 — March 28, 2003 PROJECT NO.: CLIENT: City of Coppell BY: PROJECT: Riverchase Elementary School REVIEWED BY: Date Item 2230 - 01.148 Bradley J. Moss Steve A. Markussen 03/25 1. Chris Brasch (Acurrate Services (817) 685 -0872) called and explained that 2 out of the 3 controlling points onsite have been destroyed. He requested an AutoCAD drawing to assist him in finding the horizontal control. BJM emailed Chris the drawing. Chris called requesting a field crew to reset horizontal control monumentation. BJM explained that PK needed authorization from the City to reset control monuments. cc: City of Coppell — Kenneth Griffin BJM /slt 2230 -38