Loading...
ST9902-CS030423 INC. TEAGUE NALL AND PERKINS ENGINEERS # SURVEYORS # CONSUL TANTS 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX ~ S/9?]VL MEMORANDUM To: From: Date: Re: Ken Griffin, P.E., Suzan Taylor Jay Volk, P.E. April 23. 2003 West Sandy Lake Road Project -Suggested Agenda for April 29, 2003 Meeting I. I-;like & Bike Trail A East point of Termination / .e. Extension of trail to Freeport Parkway 'C. Width of Trail a Minimum Curb Setback i. Trail ii. Sidewalk ~ Confirm whether trail can be in open space/HOA lots On-Street Bike Lanes \'to - Intersection EnhancemeJ)ts-- Landscape Concept./ II. III. IV. '" Page 1 of 2 Teague Nail and Perkins ENGINEERS, SURVEYORS, CONSULTANTS 12160 North Abrams Road, Suite 508 Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX 5 T q Cl- 0 2 5c\Vl~ ~ INC. MEMORANDUM To: Ken Griffin, P.E. - City of Coppell, Department of Public Works Suzan Taylor - City of Coppell, Department of Public Works Brad Reid - City of Coppell, Parks Department John Elias - City of Coppell, Parks Department Mike Spackman - NJB Billy Vicie - NJB Matt Atkins - TNP Jay Volk, P.E April 23, 2003 West Sandy Lake Road Project -Suggested Agenda for April 29, 2003 Meeting From: Date: Re: NOTE FOLLOW-UP NOTES FROM THE MEETING ARE IN RED AND ITALICS. I. Hike & Bike Trail A. East point of Termination i. Trail WIll extend to Denton Tap. ii. TNP to evaluate alignment from station 104+00 to Denton Tap. hi. City may elect to eliminate free rigl1t tum lane at Denton Tap to minimize encroachment onto adjacent property. B. Extension of trail to Freeport Parkway i. Trail will be constructed on South side of road. ii. TNPINJB to propose an alignment to submit to Parks/Public Works for review. iii. The trail will terminate at the west side of Freeport Parkway due to the future extension south on Freeport also being on tl1e west side of the mad. The median nose on Freeport may need to be adjusted to accommodate trail crossing iv. No sidewalk shall be shown west of Freeport Parkway. v. Meander of trail shall not be excessive. (Hertz is an example of excessive meander) vi. TNP to evaluate additional corner clips needed to accommodate trail and ramps at II1tersections. C. Width of Trail i. Trail will be eight feet in width for entire project (six feet minimum where eight cannot be achieved). D. Minimum Curb Setback i. Four feet shalll]e the minimum setback measured from back of curb. Page 1 of 1 SU,Z:Cln..~_a~~r"~_~~g_N.cOT~3 4~29~~~:~OI ii. Trail iii. Sidewalk E. Confirm whether trail can be in open space/HOA lots i. The City has not yet received permission from HOA's to encroach onto landscape buffer lots /I It may be necessary to prepare cross-sections showing relationship of sidewalks and walls. II. On-Street Bike Lanes A On street bike lanes will be cfeleted from entire project. B. TNP to revise horizontal layout to reflect change. C Right-of-way will be correspondingly narrower to maintain standard parkway width of ten feet The change will reduce required nght-of-way acquisition. III. Intersection Enhancements A. This will be coordinated further as design proceeds. B The City is concerned about ADA compliance regarding ramps, Having ramps and crosswalks same color may not be acceptable. We may use red for crosswalks and dark gray for ramps. C TNP to submit plans to thire} party contract TDLR reviewer. IV. Landscape Concept A. The City confinned that the new concept being used on the east section of Sandy Lake Will also govern median Improvements for this project. B NJB will prepare final plans for new concept. C The parks department will provide NJB with plans from the previous project D. NJB will use the same irrigation consultant as on the previous contract. E NJB to coordinate all sleel/trlg needs for irrigation/power to median and provide locations for sleeves to be /JJcluded in paving plans. V. Miscellaneous A Next meeting - The next project coordination meeting will be May 27 at 9:00 am at City Hall B The City is prepan'n9 a fetter to the owner of the Ferguson Realty tract requesting permission to survey on the property. It is anticipated that the letter will be signed within the next few weeks. All attendees are requested to advise Jay Volk as soon as possible if anything in these /Jotes is inaccurate or incomplete. Thank you. Page 2 013 ~ ~~~~~~ gggggg ",<nm..,,,,,,, or1L1LtLww ~3~3"" U:www~~ tt~~fu~~ ~rn8ffi~~ (f)::t::r:di3&l ~lI)Ulcna;a: ~~~~~ ~~~~~~ ~**:;Jt:J':J J ~ ~ -- ...t ~(M.J. ...ICol.- 4 "~, ~ g I 10 u~i- t'Wf . ~ w...e ~ ~ ~f'~ -to ~o~ ~<. e ~~ tl.R, 'to ~~p~ ~o..,J.-..,;~ \ ..e(o~'t.- -to lIV\PoWl),... ~, ( 4 bo l' ~ d:') 1 Nt t7..vth "l : 0-0 ^"^ )