Loading...
CF-Andrew Park C-CS030515CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASE NO.: 5-1195B, Voice Stream (T-Mobile) P & Z HEARING DATE: C.C. HEARING DATE: STAFF REP.: LOCATION: SIZE OF AREA OWNER: CURRENT ZONING May 15, 2003 June 10, 2003 Gary L. Sieb, Planning Director Andrew Brown Park Central on the east side of the existing concession stand. 160 square feet--a 10 foot by 16 foot building pad within Andrew Brown Park Central and replacement of an existing light tower. Owner: City of Coppell 255 Parkway Boulevard Coppell, TX 75019 (972)304-3678 Fax: (972)304-7092 Applicant: T-Mobile Chris Staley l 830 Webb Chapel Suite 5000 Dallas, TX. 75234 (214) 587-4213 Fax:(2l4)292-0101 TC (Town Center) PROPOSED ZONING: TC-S-1195B (Town Center-Special Use Permit-1195B) to allow the replacement of an existing 70-foot high light fixture with an 80-foot one, the placement of 3 flush- mounted telecommunication antennae on the new pole, and an equipment building adjacent to the concession stand. HISTORY: There has been considerable history--particularly as it relates to cell towers--on this portion of Andrew Brown Park Central. On December 14, 1999, City Council approved a lease agreement with AT&T Wireless Services for the Item # 4 Pane 1 of 3 placement of an 80 foot high telecommunications tower and the construction of a concession stand/restroom facility within this park area. The concession stand/restroom was completed in August 2000. In January of 2002, Sprint went through the Special Use Permit process for a similar cell tower located north of the AT&T site. SURROUNDING LAND USE AND ZONING: North -Andrew Brown Park Central; TC, Town Center South -Andrew Brown Park Central; TC, Town Center East - Andrew Brown Park Central; TC, Town Center West - Andrew Brown Park West; TC, Town Center COMPREHENSIVE PLAN: The Comprehensive Plan shows this property as suitable for park and open space uses. DISCUSSION: This is a straightforward case following in the footsteps of several other telecommunication requests submitted in the same general location. Basically, our Zoning Ordinance requires cell phone facilities to co-locate on existing power/light poles in the community whenever possible. T- Mobile needed an additional cell facility in Coppell and the most appropriate place for it was somewhere in Andrew Brown Park. During T-Mobile's investigation it was determined that an existing light pole in Andrew Brown Central was most desirable as a suitable site. The City was approached with the proposition that, if allowed, T-Mobil would replace the existing 70 foot light tower with a more substantial 80 foot tall one, would screen its mechanical/electrical equipment with a structure similar to the one at the north end of the existing concession stand, and would lease the area from the City. We are currently finalizing the lease agreement between the city and the applicant. Since T-Mobile would need a Special Use Permit triggering public review by the Planning Commission and City Council, staff encouraged submittal of the application being considered by you tonight. Item # 4 Pane ~ nf'i RECOMMENDATION TO THE PLANNING AND 'CONING COMMISSION: Staff is recommending approval of this Special Use Permit as it conforms to the guidelines of our cell tower zoning provisions and is substituting a 10 foot taller pole for an existing one. At the top of the tower will be placed 3 flush- mounted telecommunication antennas, each 6 feet tall by 8 inches wide by 2.75 inches thick. We recommend approval subject to the following conditions: 1. All construction activity shall comply as stated in Parks Department written comments. 2. All development shall be in accordance with the site plan, elevations and other data provided herein. 3. Lease contract being agreed to by the Gity. 4. Compliance with Building Inspection comments. 5. Decrease length of the proposed concrete seating to end at the southeastern edge of the proposed equipment structure. 6. Place on face of site plan comments contained in condition # 1 and #4 above. ALTERNATNES: l) Recommend approval of the request. 2) Recommend disapproval of the request. 3) Recommend modification of the request. 4} Take under advisement for reconsideration at a later date_ ATTACI-1 MENT: 1) Site Plan Package for cell tower {building elevations, cell equipment, etc.) 2) Departmental comments (Building Inspection, Parks) ltem # 4 Pane ~ of i C 1 T Y O F ~PPELL ~. ~ ~ ~,~ a y X ~ S ` B o, test ID Address SUP-03-0047 234 E Parkway Blvd Project Type ARPlication Date Case Manager Special Use Permit 4;17!03 Gary Sieb CITY OF COPPELL DRC REPORT Protect Name T N E G I T Y ~ O F ~OPPELL ,A~_ ~~ a E a X ~ s ` B S-11958, Voice Stream project Description zoning change request from Town Cenler to Town Center-S-11958 (Town Center) to TC-S-11848 (Town Center-Special Use Permit-1 i SAB), to allow the replacement of an existing 70 foot light pole with a 80 foot light pole and the placement of 3 flush mounted telecommunication antennas, on property located in Andy Brown Central Park Agency Building Inspection Electric and Gas Engineering Fire Administration Parks and Recreation Reviewed By Greg Jones Teresa Turner John Elias 1 of 2 Review Date Comments 4/24/03 Contractor to provide sealed Structural Engineer letter certifying tower support. Include details for base construction, if applicable. Electrical panel supplying service to be permanently maked as individual panel supplying power for antenna cellular equipment only. Na Comments received 4124!03 No Comment No comments received 4!23/03 1. Contractor will need to coordinate actual construction with the City of Coppell Parks Department, to not interfere with any scheduled sporting events to be held at Andrew Brown Central Park. Park will not be shut down during any portion of this construction process. 2. After the Ilghts have been installed on the new pole they will need to be inspected by the City of Coppell Parks Operations Manager, to confirm that they work 8 come on with the Parks Department computer system, as well as to make sure the light pattern has not been changed. 3. The existing light pole will need to be transported to Wagon Wheel Park for storage, at the contractors expense. 4. Any damage to Park Property will be repaired by the contractor, at the contractors expense (ie. landscape, irrigation, sidewalks, etc.) 5. Safety barricades will be required around all construction areas. There is activity in the park every evening. Electrical Specificatia-1s Azimuth Beamwidth (-3 dB) Elevation Beamwidth (-3 dB) Gain Polarization Port-to-Port Isolation Front-to-Back Ratio Electrical Downtilt Options VSWR Connectors Power Handling Passive Intermodulation Lightning Protection Mechanical Specifications Dimensions (L x W x D) Rated Wind Velocity Equivalent Flat Plate Area Front Wind Load @ 100 mph (161 kph) Side Wind Load @ 100 mph (161 kph) Weight TR65-19-OODPQ Tri DualPol® Polarization 1850 MHz • 1990 MHz 65° ~,, ~ „• ~' s.5°~'~ 4.5° . ~~ 18.5 dBi (16.4 dBd) Slant (± 45°) ( >_30d6 38 dB "' 2°, 4° 1)1. n„ 1.35:1 Max 1 ~.`. I:'ti 6; 7-16 DIN (female) 250 Watts CW <_ -150 dBc ,`~ (2 x 20W (+ 43 dBm)] Chassis Ground RF CONN6LTOR5- 72inx15inx6.5in (182.9 crn x 38.1 cm x 16.5 cm) 130 mph (209 kmlhr) 7.5 ft~ (.69 m2) 225 Ibs (1000 N) 98 Ibs (434 N) 40 Ibs (18.5 kg) Mounting Optirons MTG-P00-10, MTG-S02-10, MTG-DXX-20', MTG-CXX-10', MTG-C02-10, MTG-TXX-10' OptiRangeTN i ~z^ Note: 'Model number shown represents a .series of products. See Mounting Options section for specific model number. Patterns ]M f,o• ]gyp ,w' .~ i C IMY b IN / ~'. P - y(\\\ /. 1T0' ®' 1A W ,2°' V w W' p. Azimuth Elevation Elevation 2° Downtilt 4° Downtilt Revised 03/06/03 +1 770.582.0555 ext. 5310 • Fax +1 770.729.0036 www.emswireless.com Preliminary ES_µ Il7r•r•/r~.vy