Gateway BP(1.4)-CS 970409DATE: April 9, 1997
TO: Garreth Campbell
FROM: Larry Smith, Utilities
RE: Walk thru for Haverty's
A walk -thru on the above referenced project was conducted on April 4, 1997
and the items below were found to be deficient.
1. Lock and Hasp needs to be placed on both Vaults.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Please ensure that these items get taken care of and if you have any questions, please
give me a call.
MMC /dg
COPPELL ENGINEERING
UTILITIES DIVISION
MEMORANDUM