Loading...
Gateway BP(1.4)-CS 970409DATE: April 9, 1997 TO: Garreth Campbell FROM: Larry Smith, Utilities RE: Walk thru for Haverty's A walk -thru on the above referenced project was conducted on April 4, 1997 and the items below were found to be deficient. 1. Lock and Hasp needs to be placed on both Vaults. 2. 3. 4. 5. 6. 7. 8. 9. 10. Please ensure that these items get taken care of and if you have any questions, please give me a call. MMC /dg COPPELL ENGINEERING UTILITIES DIVISION MEMORANDUM