Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DR9601-LR 960711 (2)
· HENLEY JOHNSTON & ASSOCIATES, INC. engineeri3g geoscience consultants PROJECT: HAVERTY'S OFFSITE DRAINAGE PROJECT No: CLIENT: CATELLUS DEVELOPMENT CORPORATION DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: WEATHER: TIME: · START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ) 1. ) 2. ) 3. ) 4. )5. )6. )7, ( )8. ( )9. PIER INSPECTION / FOUNDATION ( ) 10. CONCRETE INSPECTION ( ) 11. SUB-SURFACE DRAIN INSTALLATION ( ) 12. SELECT FILL PLACEMENT ( ) 13. LIME STABILIZATION ( ~ 14. FOOTING INSPECTION (~-) 15. GENERAL INSPECTION * ( ) 16. REINFORCEMENT STEEL INSPECTION ( ) 17. TIE-BACK INSPECTION ( ) 18. REMARKS: ~1 ~ ¢,'~ - .~? FIELD DENSITY TESTING CONCRETE CYLINDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: SHEET // OF / telephone (214) 941-3808 f~x (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025