Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
DR9601-LR 960708
HENLEY JOHNSTON & ASSOCIATES, INC. engineer~g geoscience consultants PROJECT: HAVERTY'S OFFSITE DRAINAGE PROJECT No: CLIENT: CATELLUS DEVELOPMENT CORPORATION DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: WEATHER: tO¢~-~ TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ) 1. PIER INSPECTION / FOUNDATION ( ) ) 2. CONCRETE INSPECTION ( ) ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) ) 4. SELECT FILL PLACEMENT ( ) ) 5. LIME STABILIZATION ( "/-. ) ) 6. FOOTING INSPECTION ( Y-- ) ) 7. GENERAL INSPECTION * ( ) ) 8. REINFORCEMENT STEEL INSPECTION ( ) ) 9. TIE-BACK INSPECTION ( ) REMARKS: 10. FIELD DENSITYTESTING 11. CONCRETE CYLINDER/PICK-UP 12. GROUT CUBES 13. FIELD GRADATION / LIME 14. FIELD REPORTS 15. FIELD SAMPLING * 16. TENDON /PROOF LOAD INSPECTION 17. PIER INSPECTION / RETENTION 18. SEEAI IACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: telephone (214) 941-3808 fax (214) 943-7645 SHEET / OF 235 Morgan Ave., Dallas, Texas75203-1025