Loading...
DR9601-LR 960701HENLEY JOHNSTON & ASSOCIATES, INC. engineeri3g geoscience consultants PROJECT: HAVERTY'S OFFS[TE DRAINAGE PROJECT No: CLIENT: CATELLUS DEVELOPMENT CORPORATION DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: ,~zo ~v.~,~-.-,~ o,,/ .'~'~,',~'~-,,~- WEATHER: ~-~.,.,~?.,¢'~, ~. TIME: START WORK: /z.-'3 ¢, STOP WORK: $:30 DELAYS: /zJ~'z-o ~,.,¢/~,~ ~,~,vT,,z4¢7~,~ ~/~m ~/~. ~ ~ WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ~ 10. FIELD DENSITY TESTiNG ( ~,/')- 2. CONCRETE INSPECTION ( ) 11. CONCRETE CYLINDER / PICK-UP ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELD GRADATION / LIME ( ) 5. LIME STABILIZATION ( ) 14. FIELD REPORTS ( ) 6. FOOTING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON/PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / RETENTION ( ) 9. TIE-BACKINSPECTION ( ) 18. SEE A'FI'ACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: SHEET / OF ~ telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants FIELD COMPACTION TESTS PROJECT: HAVERTY'S OFFSITE DRAINAGE CONTRACTOR: JOHN BURNS CONSTRUCTION LOCATION: COPPELL TEXAS HJA JOB No.: 6639 PROJECT No.: DATE: LABORATORY FIELD TEST DATA COMPUES DATA DENSITY: ASTM D 2922 PROJECT ASTM D 698 MOISTURE: ASTM D 3017 SPECS. FIELD OPT STD DRY % IDENrT LOCATION / LAYER MC DEN DEN MC DRY YES NO No. (%) ~ocfl (~O (%) ~N ~ ~,.~,~.~.~... ?¢,/ ~/./ ~.1 /?..¢' ¢/.¥ / PROJECT SPECIFICATIONS MOISTURE: RANGE FROM 0 %TO + 4 % FROM OPTIMUM MOISTURE CONTENT DENSITY: MINIMUM 95 % MAXIMUM DRY DENSITY WEATHER: ~4z:.~,~ COMPACTION METHOD: REMARKS: TECHNICIAN ENGINEER REPORT No. telephone (214) 941-3808 fax (214) 943-7645 SHEET 2._ OF 235 Morgan Ave., Dallas, Texas 75203-1025 · HENLEY JOHNSTON & ASSOCIATES, INC. engineeriqg geoscience consultants PROJECT: CONTRACTOR: LOCATION: CONCRETE STRENGTH TESTS HAVERTY'S OFFSITE DRAINAGE JOHN BURNS CONSTRUCTION COPPELL, TEXAS JOB No.: 6639 DATE: 7// /~'~ SUPPUER: ~"~.~ SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 1 SET2 SET 2 LOCATION TOTAL COMPR. CYL SLUMP DATE DATE AGE LOAD STRENGTH No. MIX (in.) PLACED TESTED (days) (lbs.) (psi) / ~,- y,/ ~" ?///~, ~/¢~ -~ ?eso,~ 3/~/ CEMENT FiNE COARSE W/C REQ'D REQ'D MIX CONTENT AGGR. AGGR. RATIO 7 DAY 28 DAY DESIGN (lbs.) (lbs.) (lbs.) (gals/sk) (psi) (psi) ADMIX SET1 q~J SET2 ENGINEER REPORT No. ~ ~ ~_ ~ SHEET ~-~ OF telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025