Loading...
Peninsulas-CS 950316___ _ _ _ ~--- __ ~~~ ~_ ~~-J/~ ~L ~.. ~1,~~~., March 16, 1995 Mr. Garv Caruthers Carter & Burgess, Inc. 7950 Elmbrook Drive Dallas. Texas 75247-4961 RE: Second Construction Review Comments for MacArthur Park Dear Mr. Caruthers: _.~ _ - The City of Coppell has received the referenced plans and has the following comments to offer. 1. A lift station must be constructed and accepted for sanitarv sewer Line °A" to flow for this project. Also, the master plan indicates a larger ft>rce main is needed to flow south to Deforest Lift station gravity line. 2. On page 14 and 15 of the storm drain plans_ all inlets 10' ur lather shall have 21-inch laterals as a minimum. 3. On page 6 of the paving plans. label the common area. Also. ~~~ho is constructing the sidewalk in the common area'' 4. On page 8 of the paving plans, who is constructing the sidewaik transition area that connects to the proposed bike and bike trail'? 5. On page 10 of the water and sewer layout, show the existing fora: main. 6. Provide a barricade plan on MacArthur Blvd. for the suhdivision ingmsslegress locations in the next set of plans. 7. On page 12 of the sanitarv sewer profile for line "D", concrete encase at the location shown on the plans. There are various other minor comments throughout these plans. Once [he~c umunen[s have been addressed, the revised set of plans should he resub~ pitted to die Ci[t' t~~r rr~~iew. If~ you should have any questions concerning these comments, please feel tree to coalaci me a[ 393 X1016. Sincerely. -~ --'-- - ~ r 1 _.- ~ - j Atul Patel, E.LT Graduate Eneineer