Loading...
Amberpoint BP 2-CS030318MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Brian Daigle, Hill & Wilkerson fax: 214-299-445 / From: Larry Davis, Construction Inspector ~,~ ~~ v Date: March 18, 2003 / RE: Rescheduled WALK-THRU for Amberpoint Business Park (Staples) A final walk-thru for paving and utilities on the above referenced project has been rescheduled for Monday, March 24, 2003 at 2:00 p.m. If I can be of further assistance, please let me know. cc: Ken Griffin, P.E. City Engineer /Director of Public Works Glenn Hollowell, Asst. Director of Public Works Greg Jones, Chief Building Official Travis Crump, Fire Marshall Jaime Beard, Halff Associates fax: 214-739-0108 Claire Callaham, CalHar Construction, Inc. fax: 972-838-2299 Souia Dominguez, Potter Concrete, Ltd. fax: 214-689-1066