Loading...
Bethel Estates 1-CS030523JI ANDES CIVIL / ENVIRONMENTAL ENGINEERING May 23, 2003 Teresa Turner City of Coppell Engineering & Public Works 255 Parkway Coppell, Texas 75019 J99002 Dear Teresa: Please find attached seven ~i~sets of revised construction plans for approval based upon your review comments of May 22, 2003*~l'erry Holmes will pick up four (4) sets of the approved plans from your office when ready. You may contact Terry or me when the plans are ready. Below are our responses to your May 22, 2003 comments. General Notes- 1. A note requiring the contractor to protect the existing sewer line has been added to the Sanitary Sewer Plan-Profile sheet. 2. The new mayor's name has been revised. 3. The lot identification has been revised. 4. The floodplain statement is acknowledged. Sheet 4- 1. The double detector checks for each service have been added to the Water Plan. 2. Mx. Holmes has received the new assessment fees. Sheet 6- 1. It is our understanding that you have now received the required letter. Please contact us with any questions or comments you may have. Sincerely, ffOstin D. Landes, P.E. c: File Terry Holmes Attachments as noted 1107 E. 1st Street · Fort Worth, Texas 76102 · Tele (817) 870-1220 · Fax (817) 870-1292