First Baptist-CS030130DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: First Baptist Church of Coupell, Lot 1, Block A, Site Plan Amendment, to
allow a 30,863 square -foot expansion to the existing 32,697 square -foot
church facility and to increase the parking by 104 spaces on 5.161 acres of
property located at 590 S. Denton Tap Road, at the request of Craig
Hoenes, Kimley -Horn and Associates, Inc.
STAFF REP.: Marcie Diamond Project ID# SPR -03 -0034
DRC DATE: January 30, 2003 and February 6, 2003
CONTACT: Teresa M Turner, ELT., Graduate Engineer (972)304 -3681
COMMENT STATUS:
✓PRELIMINARY
FINAL
REVISED
SITE PLAN
1. Indicate the proposed finished floor elevation of the new building.
UTILITY PLAN
1. If you currently have irrigation or are proposing to install a new system, show the size and
location of the meter.
2. To avoid having to cut the street and install a manhole, investigate the possibility of tying into
the 12" sanitary sewer that runs along the west side of Denton Tap. Our grid map shows an
existing manhole directly across from this property.
3. How will the existing building have water service if the current 2" waterline is abandoned?
4. How will the storm water runoff be handled in the proposed parking addition on the east side
of the property?
5. Tie into the 16" waterline with a single tap. The domestic and irrigation meters (if proposed)
can be taken off of the tap prior to the fire vault.
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM: First Baptist Church of Coppell, Lot 1, Block A, Minor Plat, to allow a
30,863 square -foot expansion to the existing 32,697 square -foot church
facility and to increase the parking by 104 spaces on 5.161 acres of
property located at 590 S. Denton Tap Road, at the request of Craig
Hoenes, Kimley -Horn and Associates, Inc.
STAFF REP.: Marcie Diamond Project ID# MP -03 -0035
DRCDATE: January 30, 2003 and February 6, 2003
CONTACT Teresa M Turner, E.I.T., Graduate Engineer (972)304 -3681
COMMENT STATUS:
✓PRELIMINARY
FINAL
REVISED
AFTER P&Z
1. Dimension the width of the fire lane and access easement.
2. Provide a 10' sidewalk and utility easement rather than the 8' shown.