Loading...
First Baptist-CS030206DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: First Baptist Church of Coppell, Lot 1, Block A, Site Plan Amendment, to allow a 30,863 square -foot expansion to the existing 32,697 square -foot church facility and to increase the parking by 104 spaces on 5.161 acres of property located at 590 S. Denton Tap Road, at the request of Craig Hoenes, Kimley -Horn and Associates, Inc. STAFF REP.: Marcie Diamond Project ID# SPR -03 -0034 DRC DATE: January 30, 2003 and February 6, 2003 CONTACT Teresa M Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: PRELIMINARY FINAL REVISED AFTER P&Z SITE PLAN No Comments. UTILITY PLAN 1. Drainage along the proposed parking addition on the east side of the property will continue to be evaluated during engineering review. DEVELOPMENT REVIEW COMMITTEE ENGINEERING COMMENTS ITEM: First Baptist Church of Coppell, Lot 1, Block A, Minor Plat, to allow a 30,863 square -foot expansion to the existing 32,697 square -foot church facility and to increase the parking by 104 spaces on 5.161 acres of property located at 590 S. Denton Tap Road, at the request of Craig Hoenes, Kimley -Horn and Associates, Inc. STAFF REP.: Marcie Diamond Project ID# MP -03 -0035 DRC DATE: January 30, 2003 and February 6, 2003 CONTACT: Teresa M Turner, E.I.T., Graduate Engineer (972)304 -3681 COMMENT STATUS: PRELIMINARY ✓FINAL REVISED AFTER P&Z 1. Label the 10' sidewalk and utility easement as such.