The following is a suggested agenda for our meeting on Tuesday, May 27,2003 at 9:00 in
your offices. The items below represent issues that we would like to resolve as we continue
with preliminary plans.
I. Review Revised Alignment
A. Horizontal Alignment from State Road to Winding Hollow
B. Vertical Alignment from State Road to Winding Hollow
C. Cross Sections showing existing retaining wall
D. Right-of-way in front of Oakbend & Branchwood
Jl. ADA Issues
I. Signalization Questions from Lee Engineering
A. City traffic signal design standards
i. Standard example plan set?
ii. Signal controller - type desired
iii. Left turn phasing preferences
iv. Conduit/Pull boxes - sizes !Iocations ~
v. Power
1. Company used & point of contact
2. Power drops, wood vs. steel poles.
vi. Opticom ! preemption I
vii. Signal head orientation (horizontal! vertical)'
viii. Street name signage, logo? _ ~ ~ ,
I ix. Illumination '" 0
! x. Other preferences! standards
i, B. Vehicle detection technology cI f n \ \lV_
I, ~: Inductive loops - style and sizes Vol \.JI-eVYV\-,s;:;
I II. VIVDS
\ iii. Setback detection
l C. Signal Communications
i.SSR
ii. SSR - Ethernet &.
, iii. Hardwire - Twisted pair, coaxial cable, etc I{"
D. State Road - Reanalyze warranting volumes with current counts? cpt '^-/ ~~
IV. Set Next Meeting Date
11 eV) \I)
-;::::::: _::.::..
Page 1011
~\ qy-o) p..,
TEAGUE NALL AND PERKINS
ENGINEERS _ SURVEYORS _ CONSULTANTS
12160 North Abrams Road, Suite 508
INC. Dallas, Texas 75243
(214) 461-9867 (214) 461-9864 FAX
MEMORANDUM
To:
From:
Date:
Re:
Ken Griffin, P.E., Suzan Taylor
Jay Volk, P. E.
May 23, 2003
West Sandy Lake Road Project
The following is a suggested agenda for our meeting on Tuesday, May 27, 2003 at 9:00 in
your offices. The items below represent issues that we would like to resolve as we continue
with preliminary plans.
I. Review Revised Alignment
A. Horizontal Alignment from State Road to Winding Hollow
B. Vertical Alignment from State Road to Winding Hollow
C. Cross Sections showing existing retaining wall
D. Right-of-way in front of Oakbend & Branchwood
II. ADA Issues
III. Signalization Questions from Lee Engineering
A. City traffic signal design standards
i. Standard example plan set?
ii. Signal controller - type desired
iii. Left turn phasing preferences
iv. ConduiUPull boxes - sizes !Iocations
v. Power
1. Company used & point of contact
2. Power drops, wood vs. steel poles
VI. Opticom! preemption
VII. Signal head orientation (horizontal! vertical)
VIII. Street name signage, logo?
ix. Illumination
x. Other preferences! standards
B. Vehicle detection technology
i. Inductive loops - style and sizes
ii. VIVDS
Iii. Setback detection
C. Signal Communications
i. SSR
ii. SSR - Ethernet
iii. Hardwire - Twisted pair, coaxial cable, etc
D. State Road - Reanalyze warranting volumes with current counts?
IV. Set Next Meeting Date