Loading...
PA9702-LR 990804 TE CONCRETE COMPRL SIVE STRENGTHS 8901 Carpenter l~vy., Suite #100 Dallss~ Texss 75247 Date of Service: 07/15/1999 Report No.: 9919211 Report Date 08/04/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Co II Project: Coppell Aquatic/Recreation Ctr Arm: Bra~id 300 Block of Parkway Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA co~n~c~on: Hisaw & Assoc. coNcn~ CLASS: N/A coNcREr~sum'Ln~n: Nelson Brothers PLaCEMENT DATE: 07/15/1999 BATCH TIME: N/A pk~r~r: 1 TIM~SAM~LED: 4:15am BY: DarrinPhillips SPECIFICATION REQUIREMENTS WEATHER CONDrrlONS: Clear S~NG~m: 4000 psi @ 28 Days TEM~En~ (~- Ant 76 F CONCngT~: 81 F SLUM~: 5.0" Max TRUCKNO: 207 TICKEr NO: N/A Ant: 3-6% AmCONTgSr(~): N/A u~rrwEI~n~r(pef~: N/A TEST METHOD: ASTM C-143 PLACEMENT LOCATION: Noahwest f~ lane paving ASTM C-172 ASTM C-39 SAMI'LE LOCATION: See b~low P EPORT OF TESTS 30 CYLINDER MEASURED MAXIMUM COMERESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (ine, hes) TESTED (dsys) (Ibs. foree) (psi) TYPE I 1 5.50 07/22/1999 7 126220 4460 1 2 5.50 07/22/1999 7 125860 4450 Average 44~0 1 3 5.50 08/12/1999 28 1 4 5.50 08/12/1999 28 Sample location: 40 Yards north and 5 yards east from the northwest corner of the aerobics building This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 0ILL Page 1 of 2 CONCRETE COMPREC S:IVE STRENGTH TESC 8901 Carpenter Frwy. Suite #100 Dallas, T~ 75~7 Date ofSe~ice: 07/15/199~ Re~ No.: 9919211 Re~ Da~ 08/~/1999 Client No.: COPPELL Proj~t No.: 94991118 Client: City of Co ~11 Proj~t: Cop~ll Aquatic~ecrea~on CW Attn: Bra~Reid 3~Bl~kofP~kwayBlvd 732 ~Forest Coppell TX 75019 Cop~ll, Texa~. ~51 Services: Obmin samples of ~esh concrete at ~e placement l~ations, ~ffo~ requ~ed ~eld test and cast comp~ssive s~eng~ samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETESUPPLmR: Nelson Brothers pLACEMENT DATE: 07/15/1999 RATCHTmlE: N/A pLANT: 1 TIME SAMpLED: 6:00am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 28 Days TEr, WE~ATInt~ 0?) - Am 75 F CONCreaTE: 80 F SLtV~W: 5.0" Max TEUCK NO: 223 TICKET NO: N/A AIR: 3-6% AreCONTENT(%): N/A UNrrWEiGHT(pd): N/A\ TEST METHOD: ASTM C-143 PLACEMENT LOCATION: See page 1 ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 130 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (Ib~ force) (psi) TYPE 2 1 5.00 07/22/1999 7 106410 3760 2 2 5.00 07/22/1999 7 103020 3640 Average 3700 2 3 5.00 08/12/1999 28 2 4 5.00 08/12/1999 28 Sample location: 45' East and 15' north from northeast conrer of swimming pool Technician: Darrin Phillips Started: 3:30am Finished: 10:00am I'~ E~ng, Inc. Report Distribution: ( 1 ) City of Coppoll ( 1 ) City of Coppc 1l - Engi neering (1) BrinkIcy Sargent Architects (1) City ofCoppcll - Bldg. Insp. ( 1 ) Turner Engineers ( 1 ) City of Coppcll ~ Leisure Serv Dept f~ Eugene Harbour Vice President (I) Hisaw & ASsociates This rep~t is exclusively for the use of the client indicated above and shall not be x~produced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 2