Loading...
Freeport NIP(7.0)-LR030530RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 1 1 1 2 1 3 1 4 Duke Realty Services, LP Potter On site REQUIREMENTS 4000 psi 28 Days 3 -5" 3 -5% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) 4.75 4.75 4.75 DATE TESTED 05/06/2003 05/27/2003 05/27/2003 Hold Water added at site: 5 gallons Contractor notified of high air content. 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: Project No.: Date of Service: Report Date: Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 4:1 Oam BATCH TIME: 3:54am TEMPERATURE (F) AIR 74 F CONCRETE: 83 F TRUCK NO: 106 TICKET NO: 114319 AIR CONTENT 7.0 UNIT WEIGHT (pct): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest corner (0 -90' north 15' west to 369' east) of south parking area RFPORT nF TFSTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) SAMPLE LOCATION: 3' west x 10' north of southeast comer of parking area AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 97820 121055 128625 Average COMPRESSIVE STRENGTH (psi) 3460 4280 4550 4420 175786 037333 04/29/2003 05/30/2003 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 01DK Page 1 of 6 FIoneEngineers A LEIG H COMPANY Project: Services: CYLINDER MARKED SET NO. 2 4 Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): AIR 3% 5% 3"-5" TEST METHOD: ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) DATE TESTED 2 1 4.50 05/06/2003 2 2 4.50 05/27/2003 2 3 4.50 05/27/2003 Bold Water added at site: 10 gallons Contractor notified of high air content. REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 130185 127060 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 175786 Project No.: 037333 Date of Service: 04 /29/2003 Report Date: 05/30/2003 PROJECT DATA MIX DESIGN I.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Clear TIME SAMPLED: 5:l0am BATCH TIME: 4:58an1 TEMPERATURE (F) AIR 72 F CONCRETE: 83 F TRUCK NO: 107 TICKET NO: 114328 AIR CONTENT 6.4 UNIT WEIGHT (pct): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest comer (0 -90' north 15' west to 369' east) of south parking area SAMPLE LOCATION: 35' west x 25' south of northeast corner of paving COMPRESSIVE STRENGTH (psi) 106875 3780 4600 4490 4550 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OIDK Page 2 of 6 RoneEngineers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr: Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION STRENGTH: SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 3 1 3 2 3 3 3 4 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. Duke Realty Services, LP Potter On site REQUIREMENTS 4000 psi 28 Days 3 3% 5% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) 5.00 5.00 5.00 DATE TESTED 05/06/2003 05/27/2003 05/27/2003 Hold Water added at site: 10 gallons Contractor notified of high air content. CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA REPORT nF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 96600 113450 115105 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 Report No.: Project No.: Date of Service: Report Date: SAMPLE LOCATION: 105' west x 7' north of southeast corner of paving 175786 037333 04/29/2003 05/30/2003 MIX DESIGN 1.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 6:15am BATCH TIME: 6:04am TEMPERATURE (F) AIR 71 F CONCRETE: 83 F TRUCK NO: 106 TICKET NO: 114338 AIR CONTENT 6.5 UNIT WEIGHT (pct): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest comer (0 -90' north 15' west to 369' east) of south parlcing area COMPRESSIVE STRENGTH (psi) FRACTURE TYPE 3420 Unbonded Cap 4010 4070 4040 Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. O1DK Page 3 of 6 RoneEngineers to A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Freeport 10 500 Freeport Parkway Coppell, TX Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: CONCRETE SUPPLIER: PLANT: SPECIFICATION REQUIREMENTS STRENGTH: SLUMP (In): AIR TEST METHOD: CYLINDER MARKED SET NO. 4 1 4 2 4 3 4 4 Duke Realty Services, LP Potter On site 4000 psi 28 Days 3 r' 3 -5% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 MEASURED SLUMP (inches) 4.75 4.75 4.75 CONCRETE COMPRESSIVE STRENGTH TEST PROJECT DATA REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) DATE TESTED 05/06/2003 05/27/2003 05/27/2003 Hold Report No.: Project No.: Date of Service: Report Date: MIX DESIGN I.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Cloudy TIME SAMPLED: 7:30am BATCH TIME: 7:14am TEMPERATURE (F) AIR 72 F CONCRETE: 82 F TRUCK No: 107 TICKET NO: 114348 AIR CONTENT 5.6 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest comer (0 -90' north 15' west to 369' east) of south parking area SAMPLE LOCATION: 125' west x 20' south of northeast corner of paving AGE (days) 7 28 28 MAXIMUM LOAD (Ibs. force) 107715 119870 122675 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 COMPRESSIVE STRENGTH (psi) C 4 340 290 175786 037333 04/29/2003 05/30/2003 FRACTURE TYPE 3810 Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. O1DK Page 4 of 6 RoneEng veers A LEIGH COMPANY Client: Duke Realty Services, LP Attn: Mr. Jeff Langston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP (in): AIR TEST METHOD: CYLINDER MARKED SET NO. 3 MEASURED SLUMP (Inches) 5 1 4.50 5 2 4.50 5 3 4.50 5 3 -5% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Water added at site: 5 gallons Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) DATE TESTED 05/06/2003 05/27/2003 05/27/2003 Hold PROJECT DATA REPORT OF TESTS SAMPLE LOCATION: 90' east x 30' south of northwest corner of paving AGE (days) 7 28 28 MAXIMUM LOAD (lbs. force) 107915 125950 127100 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 175786 Project No.: 037333 Date of Service: 04 /29/2003 Report Date: 05/30/2003 MIX DESIGN I.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Cloudy BATCH TIME: 8:23am TIME SAMPLED: 8:35am TEMPERATURE (F) AIR 75 F CONCRETE: 83 F TRUCK NO: 106 TICICET NO: 114358 AIR CONTENT 5.2 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest corner (0 -90' north 15' west to 369' east) of south parking area COMPRESSIVE STRENGTH (psi) 3820 4450 4490 4470 FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OIDK Page 5 of 6 Ro A LEIG H COMPANY Client: Duke Realty Services, LP Attn: Mr. JeffLanpston 5495 Belt Line Road, Suite 360 Dallas TX 75254 Project: Services: CONTRACTOR: Duke Realty Services, LP CONCRETE SUPPLIER: Potter PLANT: On site SPECIFICATION REQUIREMENTS STRENGTH: 4000 psi 28 Days SLUMP On): 3 5 AIR TEST METHOD: CYLINDER MARKED SET NO. 6 6 6 6 4 Freeport 10 500 Freeport Parkway Coppell, TX Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. 3% 5% ASTM C -172 ASTM C -31 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -138 ASTM C -39 Water added at site: 5 gallons Technician: Jeremy Watts Report Distribution: (1) Duke Realty Services, LP (1) Duke Realty Services, LP (1) City of Coppell Building Dept. (1) Potter Concrete MEASURED SLUMP (Inches) 4.75 4.75 4.75 Concrete Compressive Cylinder 6" x 12" (area 28.27 sq. in.) DATE TESTED 05/06/2003 05/27/2003 05/27/2003 Hold PROJECT DATA REPORT OF TESTS AGE (days) 7 28 28 Started: 3:15am Finished: 12:45pm (1) Pacheco Koch Consulting Engineers (1) Engineering Analyst (1) City of Coppell Engineering Dept. SAMPLE LOCATION: 45' east x 10' south of northwest corner of paving MAXIMUM LOAD (Ibs. force) 109235 131335 128695 Average 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Port Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Report No.: 175786 Project No.: 037333 Date of Service: 04 /29/2003 Report Date: 05/30/2003 MIX DESIGN I.D.: 7752 PLACEMENT DATE: 04/29/2003 WEATHER CONDITIONS: Partly cloudy TIME SAMPLED: 9:45am BATCH TIME: 9:33am TEMPERATURE (F) -AIR 75 F CONCRETE: 83 F TRUCK NO: 107 TICKET NO: 114369 AIR CONTENT 4.7 UNIT WEIGHT (pcf): NA OVERALL PLACEMENT LOCATION: Paving entryway, parking area south of building at southwest corner (0-90' north 15' west to 369' east) of south parking area COMPRESSIVE STRENGTH (psi) 3860 4640 4550 4600 K. Scott Watson, AET CMT Operations Manager FRACTURE TYPE Unbonded Cap Unbonded Cap Unbonded Cap LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. OIDK Page 6 of 6