Loading...
ST0301-EM030321i ' Ke ~ '~;~'ffi~'~'P~O p 0 SAL SuMMaRY.~dOc PROPOSAL SUMMARY FOR BETHEL & COPPELL ROADS INFRASTRUCTURE IMPROVEMENTS CONSTRUCTION: Project Area Bethel Road Construction Coppell Road Construction Subtotal Old Town Coppell Total Construction Roadway/Drainage $2,485,900 $ 995,900 $3,481,800 $ 693,500 $4,389,900 Utility $ 57,500 $157,100 $214,600 $ 0 ENGINEERING/SURVEYING: Bethel/Coppell Road Old Town Coppell $383,500 $ 85,700 $469,200 PROJECT DESCRIPTIONS: Bethel Road · Paving and drainage · Misc. watei' connections · Does not include the culvert at Stream G1 or the channel work Coppell Road · Paving and drainage · Misc. water connections · Includes the culvert at Stream G1 Old Town Coppell · Streetscape/landscape/street lighting allowance · Storm drain upgrades · Parking · Traffic signal modifications · Enhancement of bridge at Bethel/Grapevine Creek