Loading...
DR0001-MP030606ID j Task Name _ 1 TDESIGN PHASE 2 Design 3 Advertisement 4 Bid Opening 5 City Council 6 CONSTRUCTION 7 j Preconstruction Meeting Notice to Proceed 8 9 Construction Project: DR 00-01 Date: Fri 66M MACARTHUR / SAMUEL DRAINAGE PROJECT DR OD-01 IN -HOUSE DESIGN Qtr 1.2003 Task Milestone. Qtr Summary ^ Deadline r Page 1 MACARTHUR / SAMUEL DRAINAGE PROJECT DR 00-01 IN -HOUSE DESIGN Notice to Proceed Contractor to take delivery of precast box culvert the first week in March 2002. Construction WEEK 1 (Apr. 21 -25) Placed the signs. Sawcut DeForest. Installed 36' into the headwall - demolished 36' back to first manhole installed to 20' south. WEEK 2 (Apr. 28 - May 2) Installed the 27' storm drain to approximate Sta. 2 +81. Installed the 24" storm drain to approximate Sta. 6+00. WEEK 3 (May 5 - 9) Installed the 24' storm drain across the park. WEEK 4 (May 12 -16) Installed 24" storm drain across Samuel. Poured the pavement repair. Installed 24" lateral south to MacArthur. Poured one inlet bottom on Samuel and one inlet bottom on MacArthur. WEEK 5 (May 19 - 23) Finished the installation of storm drain across MacArthur. Wafting on gas main relocation to pour inlets at Samuel. WEEK 6 (May 26- 30) Conflicts with power poles and underground utilities - will delay the construction of inlets at Cribbs Drive. Need to determine the owners of the utilities. WEEK 7 (June 2 -6) Construction of project is delayed approximately three weeks while the conflicting utilties are relocated. Project is approximately 85% complete. Page 2