Loading...
SW0001-MP030609RIVERCHASE SIDEWALK SW OD-01 PACHECO KOCH ENGINEERING I Qtr 3, 2001 Qtr 4, 2001 1, 2002 Qtr 2, 2002 Qtr 3, 2002 Qtr 4 2002 Qtr 1, 20M Qtr 2, 2003 Qtr 3, 200y ID Task Name Jun Jul - I Auk Sep Oct Nov Dec Jan r Feb [Mar Apr 1 May, Jun I Jul 1 Aug S ep') Oct I Novi Dec - Jan_f Feb I Mar -------- -- May_] Jun Jul Aug 1 - - 1 DESIGN PHASE 2 Design 3 Advertisement 4 Bid Opening 1018 J I S City Council . 12110 — ( - PERMITS 7 TAS A 9110 8 RIGHT -OF -WAY ' I _..- -- --., 9 City of Irving _ 10 Response Received 10110 ; 11 Approved - . 612 - 12 Dallas Water Utilities ; 13 Approved . 616 14 TXU Electric i :::........... . -: =: a ::.: ......... ... 1019 15 Response Received ; 16 Response Received A 7123 17 i; Acquired by City �p 3112 18 Lot 11 River Ridge Addition I i 19 Acquired by City _ 616 ZO HOA River Ridge Addition 21 Acquired by City 9130 22 iI CONSTRUCTION 23 Preconstruction Meeting 116 24 Notice Proceed 25 I Construction I Project: SW 00-01 Task Milestone . Summary ^ Deadline Date: Mon 6)9)03 Page 1 RIVERCHASE SIDEWALK SW 00-01 PACHECO KOCH ENGINEERING 2 Design On October 9, 2001 TXU decided not to approve the permit. Sidewalk will need to be redesigned to avoid conflict with TXU transmission lines. Working with TXU to resolve issue. 7 TAS Plans were submitted by Pacheco Koch. Minor comments were incorporated into the final bid set. 9 City of Irving First request sent on September 12, 2001. Second letter sent with revised plans on May 7, 2002. 10 Response Received City of Irving did not approve permit - would not allow elevated portion of sidewalk within their easement. 12 Dallas Water Utiltties First letter sent on September 12, 2001. Second letter send with revised plans on May 7, 2002. 14 TXU Electric TXU denied request for use of easement. The sidewalk must cross beneath the wires within a 50 -foot radius of the transformer tower. TXU sent letter dated March 20, 2002 which provided acceptable areas for the crossing of the TXU easements. City sent letter March 22 with exhibit showing two options for the sidewalk layout. 16 Response Received Did not approve the permit. 16 Response Received Did not approve the permit. 17 Acquired by City September 9, 2002 - TXU requested revised plat, wrong page number. PKCE revised. 23 Preconstruction Meeting Contractor requested that the Notice to Proceed be delayed. The work limits are not easily accessible because of all the recent rain. 25 Construction WEEK 1 (Apr. 21 -25) No activity. WEEK 2 (Apr. 28 - May 2) Graded area for the concrete on -grade sidewalk along Starleaf Drive. WEEK 3 (May 6 - 9) No activity. WEEK 4 (May 12 -16) No activity. WEEK 6 (May 19 - 23) No activity. WEEK 6 (May 26 - 30) Subcontractor for the elevated sidewalk started work on May 31. WEEK 7 (June 2 - 6) No activity. Page 2