MEMORANDUM
To:
From:
Date:
Re:
Ken Griffin, P.E., Suzan Taylor
Jay Volk, P. E.
May 27, 2003
West Sandy Lake Road Project - Notes from 5-27-03 Meeting
NOTE: FOLLOW-UP NOTES FROM THE MEETING ARE IN RED AND ITALICS.
A TTENDANCE: Ken Griffin, P. E, Dir. of Engineering & Public Works - City of Coppell
Suzan Taylor, G.I.P. Coordinator- CityofCoppell
Jody Short, P. E - Lee Engineering
John Denholm, E/. T. - Lee Engineering
Jay Volk, P.E. - TNP Dallas Office
Matt Atkins, E/. T. - TNP Dallas Office
I. Review Revised Alignment - The revised horizontal and vertical alignments
prepared by TNP eliminate the surcharge of the existing wall between Coppell
Road North and Winding Hollow. The City did not express any concerns about the
new alignments.
A. Horizontal Alignment from State Road to Winding Hollow
B. Vertical Alignment from State Road to Winding Hollow
C. Cross Sections showing existing retaining wall
It was noted that the new vertical alignment results in retaining walls as much
as ten feet in height in phase two of the project. The style and design of the
walls will be discussed more in future meetings.
D. Right-of-way in front of Oakbend & Branchwood
The right-of-way taking along these lots will be to a point 13 feet back of curb to
allow for a four foot landscape strip, an eight foot trail and one foot clear space.
The right-of-way taking should not encroach beyond the existing landscape
buffer.
II. ADA Issues - TNP will schedule a meeting with Kristi Thomas of Accesso/ogy
(972-434-0068) to discuss ADA issues prior to submittal of preliminary plans.
III. Signalization Questions from Lee Engineering
A. City traffic signal design standards - The City will email Lee (and Copy TNP)
the current signalization specifications.
i. Standard example plan set? - A set was provided at the meeting.
ii. Signal controller - type desired - A "Naztec" controller shall be provided
by the contractor. This is covered in the specs.
Page 1 of2
iii. Left turn phasing preferences - The design shall allow permissive left
turns. The City will make appropriate phasing adjustments after
construction.
IV. ConduiUPull boxes - sizes I locations - This is covered in the sample
plans provided by the City.
v. Power
1. Company used & point of contact - Jeff Curry at ONCOR.
2. Power drops, wood vs. steel poles - Steel only, but a new pole
will not likely be necessary, since the power drop can come off of
an existing pole and run underground to the controller.
vi. Opticom I preemption - Opticom on all approaches. One laptop for the
system to be provided by the contractor.
vii. Signal head orientation (horizontal I vertical) - Vertical.
viii. Street name signage, logo? - Yes, include with the project. City to
provide details with sample plans.
IX. Illumination - not part of the signalization, but needs to be coordinated
with the project relative to pole locations, etc.
x. Other preferences I standards
B. Vehicle detection technology - Video detection will be used for this project, but
has not been used in City before.
i. Inductive loops - style and sizes
ii. VIVDS
iii. Setback detection
C. Signal Communications - All signals will be interconnected to Denton Tap via
radio connection.
i. SSR
ii. SSR - Ethernet
iii. Hardwire - Twisted pair, coaxial cable, etc
D. State Road - Reanalyze warranting volumes with current counts? - Lee will
check their contract to see what was budgeted for this work originally and
whether any budget remains for a re-count.
IV. Set Next Meeting Date - June 24 at 9:00 am at public works.e
Page 2 of2