Loading...
ST9902-CS030527 51 9'1-02 TEAGUE NALL AND PERKINS ENGINEERS _ SURVEYORS _ CONSULTANTS 12160 North Abrams Road, Suite 508 INC. Dallas, Texas 75243 (214) 461-9867 (214) 461-9864 FAX MEMORANDUM To: From: Date: Re: Ken Griffin, P.E., Suzan Taylor Jay Volk, P. E. May 27, 2003 West Sandy Lake Road Project - Notes from 5-27-03 Meeting NOTE: FOLLOW-UP NOTES FROM THE MEETING ARE IN RED AND ITALICS. A TTENDANCE: Ken Griffin, P. E, Dir. of Engineering & Public Works - City of Coppell Suzan Taylor, G.I.P. Coordinator- CityofCoppell Jody Short, P. E - Lee Engineering John Denholm, E/. T. - Lee Engineering Jay Volk, P.E. - TNP Dallas Office Matt Atkins, E/. T. - TNP Dallas Office I. Review Revised Alignment - The revised horizontal and vertical alignments prepared by TNP eliminate the surcharge of the existing wall between Coppell Road North and Winding Hollow. The City did not express any concerns about the new alignments. A. Horizontal Alignment from State Road to Winding Hollow B. Vertical Alignment from State Road to Winding Hollow C. Cross Sections showing existing retaining wall It was noted that the new vertical alignment results in retaining walls as much as ten feet in height in phase two of the project. The style and design of the walls will be discussed more in future meetings. D. Right-of-way in front of Oakbend & Branchwood The right-of-way taking along these lots will be to a point 13 feet back of curb to allow for a four foot landscape strip, an eight foot trail and one foot clear space. The right-of-way taking should not encroach beyond the existing landscape buffer. II. ADA Issues - TNP will schedule a meeting with Kristi Thomas of Accesso/ogy (972-434-0068) to discuss ADA issues prior to submittal of preliminary plans. III. Signalization Questions from Lee Engineering A. City traffic signal design standards - The City will email Lee (and Copy TNP) the current signalization specifications. i. Standard example plan set? - A set was provided at the meeting. ii. Signal controller - type desired - A "Naztec" controller shall be provided by the contractor. This is covered in the specs. Page 1 of2 iii. Left turn phasing preferences - The design shall allow permissive left turns. The City will make appropriate phasing adjustments after construction. IV. ConduiUPull boxes - sizes I locations - This is covered in the sample plans provided by the City. v. Power 1. Company used & point of contact - Jeff Curry at ONCOR. 2. Power drops, wood vs. steel poles - Steel only, but a new pole will not likely be necessary, since the power drop can come off of an existing pole and run underground to the controller. vi. Opticom I preemption - Opticom on all approaches. One laptop for the system to be provided by the contractor. vii. Signal head orientation (horizontal I vertical) - Vertical. viii. Street name signage, logo? - Yes, include with the project. City to provide details with sample plans. IX. Illumination - not part of the signalization, but needs to be coordinated with the project relative to pole locations, etc. x. Other preferences I standards B. Vehicle detection technology - Video detection will be used for this project, but has not been used in City before. i. Inductive loops - style and sizes ii. VIVDS iii. Setback detection C. Signal Communications - All signals will be interconnected to Denton Tap via radio connection. i. SSR ii. SSR - Ethernet iii. Hardwire - Twisted pair, coaxial cable, etc D. State Road - Reanalyze warranting volumes with current counts? - Lee will check their contract to see what was budgeted for this work originally and whether any budget remains for a re-count. IV. Set Next Meeting Date - June 24 at 9:00 am at public works.e Page 2 of2