ST0102-MP030606 RUBY ROAD ST 01-02 Pacheco Koch Consulting Engineers ~ 12001 Qtr 4, 2C01 ~ Qtr 1,2002 Otr 2, 2~02 ' Q~L~3, 2CX32 etr 4, 2002 ~Qt_r 1,3303 I _Qt_r_2, 2(303 ID1 iTask NameDEsIGN PHASE I! A.,, I ~o,., Oct LN?v_~_~ Dec J~ LFe~. Mar, Apr i Ma~ Junt Jul'"'-, Aug I SeP Oct { N~ D__ec.. ---[n-~e~b l.-Ma--r_~'_~E~.~. Qtrjul 3 ............................................. ~-'-"-~.-~-"-~'- ............... Jan ~ r A r Jun 2 '~ Design ' ' 3 I Advertisement [] i 6 1 UTILITY RELOCATIONS ,: Oncor Electric & Gas ~ TESTING MATERIALS ~ ~ ' - [ 10 i Rone EngineersI~ ' ; . : : '~';i-'--I Contract Executed ! ' ~' ,~ 12/2 -' I--~--~ CONSTRUCTION I . . 13 , preconstruction Meeting : Notice to Proceed I 15 _] Construction (work days) I j~, 12~3 Project: ST01-02 Task Milestone · Summary ~ Date: Fd 6/6/03 Deadline ' Page 1 RUBY ROAD ST 01-02 Pacheco Koch Consulting Engineers 7 16 Oncor Electric & Gas 10-07-O2 Jim Phillips said the relocations would start in early November. Requested trees to be removed pdor to the relocation to expediate the relocation. November 7, 2002 - relocation staked, poles will be 2 feet south of right-of-way. Construction (work days) WEEK 1 (Dec. 16 - 20) Installed approximately 40~0 feet of the 8-inch sewer line. Completed 50% of all clearing and grubbing. WEEK 2 (Dec. 23 -27) Completed the installation of the 8-inch sewer line. Began installation of the 12-inch water line. WEEK 3 {Dec. 30 - Jan. 3) Installed approximafely 1500 linear feet of the 12-inch water line. Uncovered the existing water line along Coppell Road. WEEK 4 (Jan. 6 -10) Installed the water line under the existing Verizon line on the west end of the project. Installed fire hydrants and set meter vanes and boxes. Worked on excavation and fill and the installation of the 54- inch storm drain. WEEK 0 (Jan. 13-17) Worked on the installation of the storm drain. WEEK 6 (Jan. 20 -24) Finished the installation of the 12" water line, stubouts, and fire hydrants. Installed the 30" and 36" storm drain pipes and the 18" laterals~ 95% of the asphalt and base removal of the existing road is complete. WEEK 7 (Jan, 27 -31) Installed .54" storm drain. Installation of all of the storm drain is complete for Phase I. Installed the 5'x5' box cuJvart and worked on placement of fill material. Preparing roadway for lime stabilization. Received a complaint from the trailer park concerning rebar in the landscaping, trash, and the trailer park sign. WEEK 8 (Feb.03 - 07) Completed the 12" water line testing. Took samples. Preparing roadway for lime stabilization. WEEK It (Feb. 11 -14) Water line samples passed. Started on the Phase I inlets. Type B manhole and hsedwall poured. AT&T cable still on utility poles. Mat with represetatives from AT&T and they will start relocation as soon as possible. WEEK 10 (Feb. 17 -21) AT&T cable removed. Oncor poles net removed yet. Contractor asking for additional time. Retesting of failed densities. Rain. WEEK 11 (Feb.24 -25) Ice. WEEK 12 (Mar. 03-07) No work. WEEK 13 (Mar. 10-14) Oncor pulled the utility poles. Contractor lime stabilized the roadway. WEEK 14 (Mar. 17-21) Contractor remixed the lime stabilization. Took densities on the 21st~ WEEK 16 (Mar. 24-28) Some of the densities failed. Started paving on the 27th. Paved one-half of Phase I. WEEK 16 (Mar. 31-Apr.4) Paved the other half of Phase I. WEEK 1/' (Apr.?-11) Poured six inlet tops. WEEK 15 (Apr.14-18) Poured inlet throats - sealed the sawed joints -installed traffic buttons WEEK 19 (Apr. 21 - 25) Worked on the demolition of Phase II. Installed the asphalt temporary roadway. Made the traffic switch on the 21. Put up the signs. WEEK 20 (Apr. 25 - May 1) Worked on the excavation of Phase II. WEEK 21 (MAY 5 - 9) Started the installation of the 27" storm drain. Added additional asphalt on the temporary drive because of standing water. WEEK 22 (MAY 12 - 15) Poured three inist bottoms - finished storm drain. Set last fire hydrant. Killed old 4" water line and abandoned existing sewer line. Painted fire hydrants. Page 2 RUBY ROAD ST O1-02 Pacheco Koch Consulting Engineers WEEK 23 (May 19 - 23) Removed temporar~ asphalt drive. Inspector had them replace the drive so that occupant could access property. Worked on the mixing of the lime stabilization. WEEK 24 (May 26 - 30) Work on the lime stabilization process and took densities. WEEK 25 (June 2 - 6) Paved the eastbound lanes of traffic. Page 3