Loading...
PA9702-LR 990817 CONCRETE COMPRESSIVE STRENGTfi 'lEST ENGI~I~dldN~, ~C, 8901 Carpenter Frwy., ~:uite #100 Dallas, Texas 78247 Date of Service: 07/15/1999 Report No.: 9919211 Report Date 08/17/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ct~ Attn: Brad Reid 300 Block of Parkway Blvd 732 DeForest ' Coppell TX 75019 Coppell, Texas/Prj. #9605 1 Services: Obtain samples of fresh concrete at the placement locations, perform required field test and cast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/15/1999 BATCH TIME: N/A PLANT: 1 TIME SAMPLED: 4:15am BY: Darrin Phillips SPECLFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTh: 4000 psi @ 28 Days T~MPERATVRE (F)- Am 76 SLUMP: 5.0" Max TRUCK NO: 207 TICKETNO~ N/A AIR: 3-6% AmCONTE~r(~): N/A UNiTwniGlrr(pcr): N/A TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: Northwest fire lane paving ASTM C- 172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACC~ATIVEVARDS: 30 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) (lbs. force) (psi) TYPE 1 1 5.50 07/22/1999 7 126220 4460 1 2 5.50 07/22/1999 7 125860 4450 Average 4460 1 3 5.50 08/12/1999 28 154570 5470 1 4 5.50 08/12/1999 28 147560 5220 Avenge 5350 SampZe 3_ocatj. on: 40 Yards north and 5 yarc~s east £rom the northwest corner of the aerobics This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the wriaen approval of HBC Engineering, lnc, OILL Page 1 of 2 CONCRETE COMPRE SIVE STRENGTH T S'r E 8901 Carpenter Frwy., $nite #100 Dallas, Texas 75247 Date of Service: 07/15/1999 Report No.: 9919211 Report Date 08/17/1999 Client No.: COPPELL Project No.: 94991118 Client: City of Coppell Project: Coppell Aquatic/Recreation Ctr Attn: Brad Reid 300 Block of ParkWay Blvd 732 DeForest Coppell TX 75019 Coppell, Texas/Prj. #96051 Services: ~btainsamp~es~ffreshc~ncreteatthep~acement~ocati~ns~perf~rmrequired~e~dtestandcast compressive strength samples. PROJECT DATA CONTRACTOR: Hisaw & Assoc. CONCRETE CLASS: N/A CONCRETE SUPPLIER: Nelson Brothers PLACEMENT DATE: 07/15/1999 BATCH TIME: N/A PLANT: I TIME SAMPLED: 6:00am BY: Darrin Phillips SPECIFICATION REQUIREMENTS WEATHER CONDITIONS: Clear STRENGTH: 4000 psi @ 23 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 80 F SLUMP: 5.0" Max TRUCK NO: 223 TICKET NO: ~NT/A Am: 3-6% AreCONTENt(%): N/A UNITWEtGIrr(pd): N/A\ TEST METHOD: ASTM C- 143 PLACEMENT LOCATION: See page 1 ASTM C-172 ASTM C-39 SAMPLE LOCATION: See below REPORT OF TESTS ACCUMULATIVE YARDS: 130 CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH FRACTURE SET NO. (inches) TESTED (days) 0bs. force) (psi) TYPE 2 1 5.00 07/22/1999 7 106410 3760 2 2 5.00 07/22/1999 7 103020 3640 Average 3700 2 3 5.00 08/12/1999 28 161320 5710 2 4 5.00 08/12/1999 28 158870 5620 Average 5670 Sample location: 45' East and 15' north from northeast corner of swimming pool Technician: Danin Phillips Started: 3:30am Finished: 10:00am ~ Engineering, Inc. C ( 1 } City of Coppoll ( 1 ) City of Coppelt - Engineering (1) Brinkl~y Sargent Architects (1) City ofCoppell - Bldg. Insp. Eugene Harbour 0) Tinnet Eagineers (1) City of Coppell - Leisure Serv Dept Vice President (1) Hisaw & Associates This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written approval of HBC Engineering, Inc. 01LL Page 2 of 2 1 'x ~