Loading...
ST9302-CS020322 ' ~T43-off TXU Electric b Gas Tim Branchnu . ~ • '~ losey Lane .taowu Manoter ~ s Branch,TX )5056 Copptll June 28, 1999 Mr. Ken Griffin City of Coppell P. O. Box 478 Coppell, TX 75019 Dear Mr. :1'"'~ ~'~ 3.ZZ.Z ol:oc Lt'c~'V- to ~,' v-° °!~ ~G7 As requested, TXU Elecvic and Gas has designed the street tight layout for the City of Coppell's Sandy Lake Road street project. The street light design includes the installation of street lights from the intersection of MacArthur Boulevard and Sandy bake Road west to the intersection of Denton Tap Road and Sandy Lake Road. The installation as designed and costs associated with each aspect of the installation are as follows: 66 - 30' square steel painted standards with 2-250 watt High Pressure Sodium rectangular luminaries (66 at $1550.00 00 each) $102,300.00 2. 66 concrete foundations for standards (66 at $250.00) $16,500.00 3. Conduit and wire (10,300 feet at $4.00/foot) $41,200.00 Total $160,000.00 The City of Coppell may elect to install the concrete foundations and the conduit as designed, in which case the cost of installation of the standards would be $102,300.00 This price is good for 90 days from today's date. If not accepted in writing within 90 days, a new cost estimate may be required using prevailing material and labor cosu. Material will not be ordered and construction will not begin until written acceptance and the agreed upon amount are received by TXU Elecvic & Gas. Please contact me at (972) 888-1307 should you have any questions. Thank u, ~~. ~ ~~;~ ~~~~ v im cheau ~~-e- ~ ~ ~ ~~ ~P~~'.~