Loading...
121 BP Phase 1-CS 810518Graham Associates, Inc. CONSULTING ENGINEERS& PLANNERS ARLINGTON 520 Avenue H East/76011/(817) 640-8535 DALLAS 17130 Dallas Parkway/75248/(214) 931-7141 FT. WORTH 6737 Brentwood Stair Rd./76112/{817) 654-2271 Ma.y 18, 1981 Mr. Jim Elium City Manager City of Coppell Coppell, Texas RE: Jim: Channelization of Cottonwood Branch within Airport Business Park This letter follows up my telephone conversation with you on May 12, 1981 and our previous Engineering Submittal of March 16, 1981. Our client, Airport Business Park, wishes to make certain channel improve- ments on their property located along the Cottonwood Branch of Denton Creek. As detailed in our Engineering Data Submittal, March 16, 1981, the channel will be an earthen section with a 30-foot bottom and 4 to 1 side slopes. The drainage area that is served by this section of the branch is 2536 acres of land. Using the Coppell design criteria for storm water analysis within a channel, the maximum lO0-year flow equals 6500 CFS. The proposed improved channel will provide for this volume of water while maintaining a minimum of 2 feet of freeboard. The informa- tion outlined above is provided as supplemental information to our original submittal. If you have any questions concerning this information please call us. However, if this information and our clients' proposed improvememts to the channel are acceptable by the City of Coppell, please indicate by signing in the appropriate location below and return to us. Sincerely, A~~VED: Don Peebles, P.E. / ~ty Manager,'City'of Coppell, Texas DP/sm