PA0101-LR021002ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 7522~
972/620-8911 - 972/263-4937 (Metro)
FAX: 972/406-8023
DAILY FIELD REPORT
TESTED FOR: JMC CONSTRUCTION
McKINNEY, TEXAS
DATE: 10/02/02
PROJECT: COPPELL TRAIL SECTIONS OUR REPORT NO: 02660-24
COPPELL, TEXAS
TECHNICIAN: A.R.
WEATHER: CLEAR TEMPERATURE RANGE: 80 TO 90
THE ALPHA TECHNICIAN TRA~/ELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE
SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION:
SIDEWALK SECTION 3 AT STATION #2+00
THE TECHNICIAN MOLDED 1 SET OF 4 TEST CYLINDERS FROM CONCRETE PLACED FOR SIDEWALK ON THIS
DATE,
~.T THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
~C:
SCHRICKEL, ROLLINS AND ASSOCIATES, INC.
THE C TY OF COPPELL
Respectfully Submitted,
ALPHA The use of our name and lest results musl receive our written approval Test results and reports apply only to the samples tested and/or observed, and are not ~nd~cat~ve of the (~uahhes of
Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting