Loading...
PA0101-LR021002ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 7522~ 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 DAILY FIELD REPORT TESTED FOR: JMC CONSTRUCTION McKINNEY, TEXAS DATE: 10/02/02 PROJECT: COPPELL TRAIL SECTIONS OUR REPORT NO: 02660-24 COPPELL, TEXAS TECHNICIAN: A.R. WEATHER: CLEAR TEMPERATURE RANGE: 80 TO 90 THE ALPHA TECHNICIAN TRA~/ELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIAN OBTAINED 1 SOIL SAMPLE FOR LABORATORY PROCTOR ANALYSIS. THE SAMPLE WAS OBTAINED FROM THE FOLLOWING LOCATION: SIDEWALK SECTION 3 AT STATION #2+00 THE TECHNICIAN MOLDED 1 SET OF 4 TEST CYLINDERS FROM CONCRETE PLACED FOR SIDEWALK ON THIS DATE, ~.T THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. ~C: SCHRICKEL, ROLLINS AND ASSOCIATES, INC. THE C TY OF COPPELL Respectfully Submitted, ALPHA The use of our name and lest results musl receive our written approval Test results and reports apply only to the samples tested and/or observed, and are not ~nd~cat~ve of the (~uahhes of Geotechnical Engineering 0 Construction Materials Testing 0 Environmental Engineering 0 Consulting