Loading...
ST9304-CS 970421 DALLAS COUNTY 04'2=;'9'7 Ai)9:175 IN PUBLIC WORKS April 21, 1997 Mr. Ken Griffith, P.E. City Engineer City of Coppell P.O. Box 478 Coppell, Texas 75019 Re: Belt Line Road - Project//940-403.1/91-829 (Denton Tap Road to MacArthur Boulevard) Grapevine Creek Bridge Dear Mr. Griffith: At your request Dallas County has asked Halff Associates to evaluate the design effort and construction costs associated with revising the Grapevine Creek Bridge. These revisions would accommodate sidewalks and a more esthetic railing. The estimated additional design effort would be $17,500, and the estimated additional construction cost would be approximately $150,000. Also, these revisions would constrict the north channel grading between the railroad trestle and the bridge and would require additional easements from the Crow-Billingsley tracts to the south. Such changes are beyond the scope of the County's bond program and as such would have to be .funded by Supplemental Agreements with the City of Coppell. Please review these items and indicate by May 5, 1997, whether or not Coppell wishes to enter into the necessary Supplemental Agreements. JMB:jdj~'N~k~ Attachment 829:\GRAPECKBD.LTR 411 Elm Street Dallas, Texas 75202 653-7151 === a ssoclates · ' _ ·FAX (214) 739-0095 March 91, 1997 AVO 14111 Dallas County Public Works 411 Elm Street Dallas, Texas 75202 Arm: sillP.E. C Z K Project Engineer APR O 2 1597 Re: Bel~ine Road, from Denton Tap Road- in Coppell to MacArthur Boulevard COUNTY DIRECTOR 0E PUBLIC WORKS Project 490-403.1/91-829 Dear Ms. Brim: Halff Associates has evaluated the design effort associated with the City of Coppell's proposed revisions to the Grapevine Creek bridge as requested in Item 16 of your March 6, 1997 letter. As we discussed in our meeting on March 10, 1997, the proposed changes will widen the bridge deck by 12-14 feet. This additional width will further constrict the channel grading between the railroad tressel to the north and the Beltline Road bridge and require additional drainage easement from the Crow-Billingsley tracts to the south. We estimate the additional design effort to be as follows: · modify the current bridge design to widen the bridge deck. $ 9,000.00 This will include changes to the bridge plans, abutment and bent derails; · delete the T502 rail and incorporate the proposed concrete $ 6,000.00 rail. Standard TxDOT rail details will no longer be valid for this project. Custom details will be developed for the proposed handrail; · revise the bridge grading plan and drainage easements. $ 2,500.00 Additional concrete riprap may be required between the proposed bridge and the existing railroad tressel. Total Estimated Effort: $17,500.00 DALLAS · FORT WORTH · HOUSTON · ARLINGTON · McALLEN ° CHICAGO TRANSPORTATION ° WATER RESOURCES · LAND DEVELOPMENT ° MUNICIPAL · ENVIRONMENTAL ° STRUCTURAL MECHANICAL ° ELECTRICAL ° SURVEYING ° GEOGRAPHIC INFORMATION SYSTEMS ARCHITECTURE ° LANDSCAPE ARCHITECTURE ° PLANNING III III Dallas County Public Works March 31, 1997 Page 2 Please call if you have any questions or require additional information. Yo~sve~truly, Project Manager TJK ~A. VO\I411 I\Wl~LT032697jIVIB