PA0101-LR020913ALPHA TESTING, INC.
220~ Wisconsin St., Suite 100
Dallas, Texas 75229
972/620-8~I I - 972/263.4937 (Metro)
FAX: 972/406-8023
DALLY FIELD REPORT
TESTED FOR: JMC CONSTRUCTION
McKINNEY, TEXAS
PROJECT:
COPPELL TRAIL SECTIONS
COPPELL, TEXAS
DATE: 09/13/02
OUR REPORT NO: 02660-4
TECHNICIAN: A.R.
WEATHER: CLOUDY
TEMPERATURE RANGE:
80 TO 90
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT SITE TO MONITOR ON-GOING
WORK AND PERFORM FIELD TESTING AS REQUESTED.
UPON ARRIVAL AT THE JOB SITE THE TECHNICIAN WAS INSTRUCTED TO WAIT FOR THE CITY OFCOPPELL
INSPECTOR TO ARRIVE. AFTER 1 HOUR OF STANDBY TIME THE TECHNICIAN WAS INFORMED THAT IN THE
INSPECTORS JUDGEMENT THE MATERIAL WAS TOO DRY AND WOULD NEED TO BE REWORKED SO NO
FIELD DENSITY TESTS WOULD BE NECESSARY.
THE TECHNICIAN RETURNED TO THE DALLAS OFFICE.
CC:
SCHRICKEL, ROLLINS AND ASSOCIATES, INC.
THE CITY OF COPPELL
Our test results and reports ai'e fo~ the exclusive use of the client (and their designated recipients On file in our office) and shall not be reproduced and/or distnbuted except with express approval of
ALPHA The use of OUr name and test results must receive our written app,'oval. Test results and reports appry only to the samples tested and/or observed, a~ld are not indicative of the qualities of
apparently identical or similar specimens
Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting